← Back
BuildNYC
Walk-up cooperative
799 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3020210
💬 Discuss this project
1912Year Built
3Stories
C6Building Class
R6BZoning
4,455 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 799 801 Pres Tenants · 3,135 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 11 docs
Floor 324p · 4 filings · 20 docs
Floor 224p · 4 filings · 20 docs
Floor 1Kitchen and common gas meterUnder Construction10p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
799 801 Pres Tenants103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arch-Form Design Build1403/21/2026
Tom Ennis Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Green ConversionsGeneral Contractor507/08/2026
Proficient Home Improvem*General Contractor307/08/2026
Meghna ConstructionGeneral Contractor109/19/2026
Blaze Plumbing & HeatingPlumbing107/08/2026
Shaw MechanicalPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BHK Engineering9589105/26/2026
Arco Engineering3769311/24/2025
World Design Architecture9323410/23/2025
B-Cubed Engineering6023202/24/2025
Building Lifecycle
11/09/2026
Signed off — Alteration
Reinforcement of existing wood girder at the first floor/basement framing.
B01371667-I1
09/18/2026
Permit issued — Structural
B01371667-I1-ST
09/11/2026
Signed off — Alteration
Plumbing Work in conjunction with B01143042
B01143042-I1
05/26/2026
Filed — Alteration
Reinforcement of existing wood girder at the first floor/basement framing.
B01371667-I1
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMeghna Construction09/18/2026
DOB NOWMechanical SystemsSigned-offGreen Conversions10/22/2025
DOB NOWPlumbingSigned-offBlaze Plumbing & Heating08/18/2025
DOB NOWMechanical SystemsSigned-offProficient Home Improvem*08/14/2025
DOB NOWPlumbingSigned-offJames Cruz07/16/2025
DOB NOWStructuralSigned-offGreen Conversions07/15/2025
DOB NOWGeneral ConstructionSigned-offProficient Home Improvem*06/20/2025
DOB NOWGeneral ConstructionSigned-offGreen Conversions02/21/2025
1 project · most recent 06/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
06/10/2025Signed-offProficient Home Improvem*Heating and Air Conditioning Systems
2 projects · most recent 11/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/24/2025Signed-offShaw MechanicalGas, Water/Sanitary
06/10/2025——Gas, Water/Sanitary
3 projects · most recent 03/26/2026
General Wiring
FiledStatusContractorScope
03/26/2026CompleteDenmar ElectricGeneral Wiring
07/29/2025Permit IssuedKenneth Fisk ElectricGeneral Wiring
07/03/2018Permit IssuedWCK Electric—
1 project · most recent 05/26/2026
Steel Masonry
FiledStatusContractorScope
05/26/2026Permit IssuedMeghna ConstructionSteel, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/05/2026Tenant Protection Plan ComplianceWilliam DeGraaffspecial
04/24/2026Structural Stability – Alterations of existing buildingsWilliam DeGraaffspecial
04/24/2026Post-installed AnchorsWilliam DeGraaffspecial
04/07/2026MasonryWilliam DeGraaffspecial
04/07/2026Structural Steel - DetailsWilliam DeGraaffspecial
03/13/2026FinalWilliam DeGraaffprogress
11/13/2025Fire-Resistant Penetrations and JointsJOSE MANTRANAspecial
10/22/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
09/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/28/2025Tenant Protection Plan Compliance—special
05/27/2025FinalMICHAEL DERUVOprogress
05/27/2025FinalMICHAEL DERUVOprogress
05/27/2025Mechanical Systems—special
01/28/2025Structural Stability – Alterations of existing buildingsDomenico Antonellispecial
01/28/2025Structural Steel - DetailsDomenico Antonellispecial
01/28/2025Structural Steel - WeldingDomenico Antonellispecial
01/28/2025Structural Steel - High Strength BoltingDomenico Antonellispecial
01/13/2025FinalDomenico Antonelliprogress
11/15/2024FinalMichael McSweeneyprogress
11/15/2024Mechanical SystemsJOSE MANTRANAspecial
55 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account