← Back
One family attached or semi-detached
79A INDIA STREET
BROOKLYN · BIN 3064308
💬 Discuss this project
1901Year Built
3Stories
A5Building Class
R6BZoning
2,322 sfGross Floor Area
1Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 1,667 sf lot · 1.39 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalFire Protection
Roof1p · 1 filing · 4 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/16/2022$2.2M—— → —$969/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN305/31/2023
KNF SERVICES CROP105/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RCGA ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor603/21/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616405/31/2023
Building Lifecycle
All (67)Filed (4)Permit Issued (5)Signed Off (2)Violation (14)Inspection (10)Objection (2)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
02/20/2024
Signed off — Alteration
Installation of sprinkler heads, piping accessories and BACKFLOW PREVENTOR DEVICE
B00860842-I1
01/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Permit issued — Plumbing
B00860842-I1-PL
12/06/2023
Signed off — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing three family dwelling into a one family dwelling. Filed in conjunction with ALT I app#B08034748-I1
B00863789-I1
12/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2023
Violation issued (HPD, open)
I
10/20/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/13/2023
Permit issued — Plumbing
B00860842-I1-EW-SP
06/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2023
Objection resolved — Addressed
06/13/2023
Special inspection requirement — Final
FAHAD FATEH
06/13/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
06/13/2023
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/13/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/13/2023
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
06/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/13/2023
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
06/13/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/13/2023
Special inspection requirement — Footing and Foundation
FAHAD FATEH
06/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/13/2023
Special inspection requirement — Permanent certificate
FAHAD FATEH
06/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/13/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/13/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/13/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/13/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/13/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/06/2023
Objection raised — Scope
05/31/2023
Filed — Alteration CO
Existing three stories and cellar, three family dwellings to be converted into a one family dwelling unit,and fully renovated. Install new drywall partitions and plumbing fixtures as per plans Pl and SP applications filed separately. Change of egress .
B08034748-P1
05/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/27/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/27/2023
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/27/2023
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/27/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/27/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
05/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/27/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2023
Permit issued — Plumbing
B00863789-I1-PL
05/04/2023
Filed — Alteration
Installation of sprinkler heads, piping accessories and BACKFLOW PREVENTOR DEVICE
B00860842-I1
05/01/2023
Filed — Alteration
installation of new gas fired equipment,and plumbing fixtures for the renovation and conversion of the existing three family dwelling into a one family dwelling. Filed in conjunction with ALT I app#B08034748-I1
B00863789-I1
04/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2023
Permit issued — Structural
B08034748-I1-GC-CX
03/23/2023
Violation issued (HPD, open)
A
03/07/2023
Permit issued — Mechanical Systems
B08034748-I1-GC-CX
11/17/2022
Filed — Alteration CO
Existing three stories and cellar, three family dwellings to be converted into a one family dwelling unit,and fully renovated. Install new drywall partitions and plumbing fixtures as per plans Pl and SP applications filed separately. Change of egress .
B08034748-I1
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC12/13/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HTG INC07/13/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/05/2023
DOB NOWStructuralPermit IssuedCUBE BUILDERS GROUP NY04/14/2023
DOB NOWMechanical SystemsPermit IssuedCUBE BUILDERS GROUP INC03/07/2023
1 project · most recent 05/31/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/31/2023Permit IssuedCUBE BUILDERS GROUP NYHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NAHZ2 36,000 BTU · Heat Pump Outdoor ×8
1 project · most recent 04/17/2023
General Wiring
FiledStatusContractorScope
04/17/2023CompleteUNITED ELEC'L CONT'G CORPGeneral Wiring
1 project · most recent 05/31/2023
Steel Concrete Wood
FiledStatusContractorScope
05/31/2023Permit IssuedCUBE BUILDERS GROUP NYSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/13/2023FinalFAHAD FATEHprogress
06/13/2023Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
06/13/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/13/2023Mechanical SystemsFAHAD FATEHspecial
06/13/2023Structural Steel - DetailsFAHAD FATEHspecial
06/13/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/13/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/13/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/13/2023Structural Wood FrameFAHAD FATEHprogress
06/13/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/13/2023Footing and FoundationFAHAD FATEHprogress
06/13/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/13/2023Permanent certificateFAHAD FATEHenergy_progress
06/13/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/13/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/13/2023Shutoff dampersFAHAD FATEHenergy_progress
06/13/2023Interior lighting powerFAHAD FATEHenergy_progress
06/13/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/13/2023Fenestration areasFAHAD FATEHenergy_progress
06/13/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/13/2023Fenestration air leakageFAHAD FATEHenergy_progress
05/27/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/27/2023Fenestration air leakageFAHAD FATEHenergy_progress
05/27/2023Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/27/2023Permanent certificateFAHAD FATEHenergy_progress
Latest 25 of 44.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00863789-I1Request digital key ↗
08/27/2026B00860842-I1Request digital key ↗
08/27/2026B08034748-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B08034748-P1Open ↗
08/26/2026B08034748-P1Open ↗
08/26/2026B08034748-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026B08034748-P1Open ↗
08/26/2026B08034748-P1Open ↗
08/22/2026B08034748-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00860842-I1Open ↗
08/27/2026B08034748-I1Open ↗
08/27/2026B08034748-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/27/2026B08034748-I1Open ↗
08/15/2026B08034748-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08034748-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08034748-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08034748-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00860842-I1Open ↗
08/27/2026B08034748-I1Open ↗
08/15/2026B08034748-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/27/2026B08034748-I1Open ↗
08/15/2026B08034748-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08034748-I1Open ↗