← Back
Miscellaneous hospital / health care facility
8-13 ASTORIA BOULEVARD
QUEENS · BIN 4541906
💬 Discuss this project
2011Year Built
3Stories
I9Building Class
R6AZoning
23,310 sfGross Floor Area
1Units
Rent Stabilized5 Open Violations 3 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: REALITY HOUSE, INC. · 11,106 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction52p · 1 filing · 20 docs
Floor 3Under Construction60p · 1 filing · 20 docs
Floor 2Under Construction65p · 1 filing · 20 docs
Floor 1Under Construction65p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REALTY HOUSE INC7207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WERFEL, LOPINTO, AND ASSOCIATES, AR409/30/2025
TSF ENGINEERING, PC307/22/2024
OFFICE OF JAMES RUDERMAN110/05/2023
BASIC GROUPS CORP103/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES1603/21/2026
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE J. PILLA GROUP LTDGeneral Contractor1007/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
MJ GENERAL MECHANICAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL1290809/30/2025
ANDREW GOODRICH, P.E., PL965103/20/2023
Building Lifecycle
All (119)Filed (9)Permit Issued (9)Signed Off (3)Violation (45)Inspection (15)Objection (8)Special Inspection (30)
08/10/2026
Signed off — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-S2
07/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/07/2026
Permit issued — General Construction
Q00923048-I1-GC
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2026
Signed off — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-S3
01/07/2026
Violation issued (FDNY_ORDER, closed)
01/07/2026
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2025
Violation issued (HPD, closed)
C
09/30/2025
Filed — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-A1
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
09/30/2025
Special inspection requirement — Sprayed fire-resistant materials
GEORGE ANDERSEN
09/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
09/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE ANDERSEN
09/30/2025
Special inspection requirement — Lighting controls
GEORGE ANDERSEN
09/30/2025
Special inspection requirement — Interior lighting power
GEORGE ANDERSEN
09/25/2025
Signed off — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-S1
08/01/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2025
Permit issued — General Construction
Q00923048-I1-GC
04/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/16/2025
Violation issued (FDNY_ORDER, closed)
04/16/2025
Violation issued (FDNY_ORDER, closed)
04/16/2025
Violation issued (FDNY_ORDER, closed)
04/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/10/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/29/2025
Filed — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-P3
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/16/2024
Permit issued — Structural
Q00923048-S1-ST
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
08/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE ANDERSEN
08/09/2024
Special inspection requirement — Sprinkler Systems
GEORGE ANDERSEN
08/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
08/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE ANDERSEN
08/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE ANDERSEN
07/26/2024
Permit issued — Sprinklers
Q00923048-S3-EW-SP
07/23/2024
Filed — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-P2
07/22/2024
Filed — Alteration CO
IT IS PROPOSED TO THE CHANGE THE USE OF SECOND FLOOR TO INDICATE NON PROFIT INSTITUTION WITH SLEEPING ACCOMMODATIONS, AND RENOVATE THE FIRST, SECOND AND THIRD FLOORS AS SHOWN ON PLANS.
Q00923048-P1
07/22/2024
Permit issued — Mechanical Systems
Q00923048-S2-MS
07/18/2024
Special inspection requirement — Sprinkler Systems
GEORGE ANDERSEN
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE ANDERSEN
07/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE ANDERSEN
07/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
07/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/10/2024
Permit issued — General Construction
Q00923048-I1-GC
04/26/2024
Permit issued — Sprinklers
Q00923048-S3-PL
03/27/2024
Violation issued (FDNY_ORDER, closed)
03/22/2024
Permit issued — General Construction
Q00923048-I1-GC
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTHE J. PILLA GROUP LTD05/07/2026
DOB NOWGeneral ConstructionPermit IssuedTHE J. PILLA GROUP LTD05/15/2025
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD10/16/2024
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C07/26/2024
DOB NOWMechanical SystemsSigned-offTHE J. PILLA GROUP LTD07/22/2024
DOB NOWGeneral ConstructionPermit IssuedTHE J. PILLA GROUP LTD05/10/2024
DOB NOWSprinklersSigned-offMJ GENERAL MECHANICAL LLC04/26/2024
DOB NOWGeneral ConstructionPermit IssuedTHE J. PILLA GROUP LTD03/22/2024
DOB NOWStructuralSigned-offTHE J. PILLA GROUP LTD03/22/2024
BISBLRE-ISSUEDONOFRIO LODUCA PLBG CORP07/18/2012
BISPLISSUEDONOFRIO LODUCA PLBG CORP06/01/2012
BIS—ISSUEDMECCA CONTRACTING INC01/24/2012
BISEQISSUEDMECCA CONTRACTING INC01/24/2012
BISFPISSUEDCHIEF FIRE PREV.& MECH CO12/16/2011
BIS—ISSUEDMECCA CONTRACTING INC12/01/2011
BISEQISSUEDMECCA CONTRACTING INC12/01/2011
BISEQISSUEDB H & B CONSTRUCTION INC08/31/2011
BISEQISSUEDB H & B CONSTRUCTION INC08/04/2011
BISPLISSUEDONOFRIO LODUCA PLBG CORP06/09/2011
BIS—ISSUEDMECCA CONTRACTING INC03/30/2011
BISOTISSUEDMECCA CONTRACTING INC03/28/2011
BISEQISSUEDMECCA CONTRACTING INC03/28/2011
BIS—ISSUEDALWAYS FIRST, INC01/25/2011
BISEQISSUEDALWAYS FIRST, INC01/25/2011
BISFPISSUEDFIRE FOE SYSTMES CO04/25/2003
BISPLISSUEDAVON PLBG & HTG INC03/10/2003
BISOTISSUEDAARON CHEUNG PE.PC03/06/2003
BIS—ISSUEDK & S CONSTRUCTION WORKS06/04/2001
BISEQRE-ISSUEDK & S CONSTRUCTION WORKS CORP.05/15/2001
BISPLISSUEDAVON PLBG & HTG INC05/10/2001
BISOTRE-ISSUEDK & S CONSTRUCTION WORKS CORP05/09/2001
BISEQISSUEDK & S CONSTRUCTION WORKS CORP.12/12/2000
BISPLISSUEDAVON PLBG & HTG INC12/12/2000
BIS—ISSUEDK & S CONSTRUCTION WORKS CORP.12/12/2000
BIS—ISSUEDJDF TRANSFER10/22/1991
BISEQISSUEDJDF TRANSFER10/15/1991
BIS—ISSUEDJDF TRANSFER10/08/1991
BISEQISSUEDJDF TRANSFER10/08/1991
1 project · most recent 09/30/2025
Sprinkler System
FiledStatusContractorScope
09/30/2025Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 09/30/2025
Water/Sanitary
FiledStatusContractorScope
09/30/2025Signed-offMJ GENERAL MECHANICAL LLCWater/Sanitary
2 projects · most recent 04/16/2025
General Wiring
FiledStatusContractorScope
04/16/2025CompleteKURT EBINGER ELEC CONSTGeneral Wiring
12/28/2024CompleteTF ELECTRICAL CORPGeneral Wiring
1 project · most recent 09/30/2025
Steel
FiledStatusContractorScope
09/30/2025Permit IssuedTHE J. PILLA GROUP LTDSteel
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/30/2025Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
09/30/2025Sprayed fire-resistant materialsGEORGE ANDERSENspecial
09/30/2025Tenant Protection Plan Compliance—special
09/30/2025Energy Code Compliance InspectionsGEORGE ANDERSENprogress
09/30/2025Fire-Resistance Rated ConstructionGEORGE ANDERSENprogress
09/30/2025Lighting controlsGEORGE ANDERSENenergy_progress
09/30/2025Interior lighting powerGEORGE ANDERSENenergy_progress
08/09/2024Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
08/09/2024Tenant Protection Plan ComplianceGEORGE ANDERSENspecial
08/09/2024Sprinkler SystemsGEORGE ANDERSENspecial
08/09/2024HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
08/09/2024HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
08/09/2024HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
07/18/2024Sprinkler SystemsGEORGE ANDERSENspecial
07/18/2024HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
07/18/2024HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
07/18/2024HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
07/18/2024Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
07/18/2024Tenant Protection Plan Compliance—special
10/24/2023HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
10/24/2023Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
10/24/2023Tenant Protection Plan ComplianceGEORGE ANDERSENspecial
10/24/2023Energy Code Compliance InspectionsGEORGE ANDERSENprogress
10/24/2023HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
10/24/2023Maintenance informationGEORGE ANDERSENenergy_progress
Latest 25 of 32.
▾Documents — 338 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00828054-I1Request digital key ↗
08/23/2026Q00923048-P2Request digital key ↗
08/23/2026Q00923048-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION28
01/13/2025421460369Open ↗
01/13/2025420812339Open ↗
07/24/2018421460369Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION16
07/23/2012420570929Open ↗
01/24/2012420067180Open ↗
01/24/2012420067180Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/17/2012420067180Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00923048-I1Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/26/2026Q00923048-A1Open ↗
09/26/2026Q00923048-A1Open ↗
09/26/2026Q00923048-A1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/26/2026Q00923048-A1Open ↗
09/26/2026Q00923048-A1Open ↗
09/01/2026Q00923048-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00828054-I1Open ↗
08/23/2026Q00923048-P2Open ↗
08/23/2026Q00923048-S2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/02/2011420477736Open ↗
08/05/2011420467729Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/02/2011420477736Open ↗
08/05/2011420467729Open ↗
▸Trade Schedules & Equipment57
▸BISSELF-CERT PLUMBING NOTICE20
01/10/2013420067180Open ↗
11/03/2012420067180Open ↗
10/22/2012420067180Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING8
05/31/2012420067180Open ↗
05/09/2012420067180Open ↗
04/12/2012420067180Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS7
12/07/2012420067180Open ↗
12/07/2012420067180Open ↗
12/07/2012420067180Open ↗
Showing 3 of 7 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B5
10/15/2012420067180Open ↗
10/15/2012420067180Open ↗
09/12/2012420067180Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/07/2012420067180Open ↗
12/07/2012420067180Open ↗
01/10/2012420067180Open ↗
▸BISWATER METER PERMIT : DEP-METER2
09/26/2012420067180Open ↗
09/26/2012420067180Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION2
11/30/2012420067180Open ↗
10/17/2012420067180Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
09/12/2012420067180Open ↗
06/15/2012420071950Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/24/2018421460369Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
08/28/2012420067180Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/22/2012420570929Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
12/18/2013420067180Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/31/2012420570929Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/12/2012420067180Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
11/14/2012420067180Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection23
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE12
03/31/2011420067180Open ↗
03/31/2011420067180Open ↗
03/31/2011420067180Open ↗
Showing 3 of 12 on file for this type
▸BISSTREET TREE CHECKLIST4
11/15/2011420067180Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00923048-P3Open ↗
08/13/2026Q00923048-A1Open ↗
08/13/2026Q00923048-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
05/22/2012420570929Open ↗
09/02/2011420477736Open ↗
08/05/2011420467729Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/30/2011420508365Open ↗
Showing 1 of 2 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
03/18/2013420812339Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
03/31/2011420067180Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
09/04/2012420067180Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/26/2012420570929Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/16/2012420067180Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs51
▸BISLETTERS - SUPPORTING DOCUMENTATION17
12/16/2013420106682Open ↗
12/16/2013420106682Open ↗
12/16/2013420106682Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
03/18/2013420812339Open ↗
05/22/2012420570929Open ↗
11/30/2011420508365Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/25/2026Q00828054-I1Open ↗
08/13/2026Q00923048-P3Open ↗
08/13/2026Q00923048-P1Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/07/2013420067180Open ↗
08/13/2012420071950Open ↗
07/24/2012420508365Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM3
09/26/2012420067180Open ↗
09/26/2012420067180Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
12/10/2012420067180Open ↗
12/19/2012420067180Open ↗
Showing 2 of 3 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS SIGNOFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
03/18/2013420812339Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/24/2012420067180Open ↗
12/02/2011420067180Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET15
07/24/2018421460369Open ↗
07/24/2018421460369Open ↗
03/18/2013420812339Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION8
11/08/2012420067180Open ↗
11/05/2012420067180Open ↗
09/04/2012420067180Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/23/2026Q00923048-I1Open ↗
08/23/2026Q00923048-P2Open ↗
08/23/2026Q00923048-A1Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
09/14/2012420067180Open ↗
07/24/2012420508365Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
11/30/2012420067180Open ↗