← Back
Public elementary, junior or senior high
P.S. 197 the Ocean School
8-15 LANETT AVENUE · BIN 4298856
💬 Discuss this project
1962Year Built
4Stories
W1Building Class
R4-1Zoning
95,000 sfGross Floor Area
1Units
LL97 Covered24 Open Violations 2 unresolved · 22 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 100,500 sf lot · 0.95 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2207/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION803/22/2026
DOE P.S. 197 THE OCEAN SC603/22/2026
DEPT. OF EDUCATION 0403/22/2026
DOE PS 197 040303/22/2026
DOE 040603/22/2026
DEPT OF EDUCATION/ PS 1971103/22/2026
DEPT OF EDUC. PS 197303/22/2026
I.S.197 DOE403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
PROMINA ENGINEERING P C1003/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIZVI BUILDERSGeneral Contractor1307/08/2026
VARSITY PLBG AND HTG INCPlumbing407/08/2026
CEDOMIR MARAElectrical103/21/2026
CUIFFO, JAMESElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
GIANNELLI, ANTHONYElectrical103/21/2026
KELLEHER, VINCENTElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
PRASSAKOS, GEORGEElectrical103/21/2026
RAMNAUTH, RAMANANDElectrical103/21/2026
ROSENBAUM, MORDECHAIElectrical103/21/2026
ENVIROTRAC LTDGeneral Contractor107/08/2026
M. BLAUSTEIN & SON, INCElectrical103/21/2026
CACERES, JUANElectrical103/21/2026
Building Lifecycle
All (96)Filed (11)Permit Issued (12)Signed Off (1)Violation (60)Inspection (3)Objection (5)Special Inspection (4)
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
04/02/2026
Violation issued (ECB, open)
Construction
02/04/2026
Permit issued — Plumbing
Q00673583-S1-PL
12/08/2025
Violation issued (FDNY_ORDER, closed)
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
11/07/2025
Violation issued (ECB, open)
Construction
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
05/08/2025
Violation issued (FDNY_ORDER, closed)
02/05/2025
Permit issued — Plumbing
Q00673583-S1-PL
01/27/2025
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-P7
08/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/17/2024
Permit issued — General Construction
Q00673583-I1-GC
05/17/2024
Permit issued — General Construction
Q00673583-I1-GC
04/25/2024
Violation issued (ECB, open)
Construction
04/25/2024
Violation issued (ECB, open)
Construction
04/25/2024
Violation issued (ECB, open)
Construction
04/25/2024
Violation issued (ECB, closed)
Construction
02/07/2024
Permit issued — Plumbing
Q00673583-S1-PL
01/29/2024
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-P6
11/15/2023
Objection raised — Other
11/10/2023
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-S3
11/10/2023
Special inspection requirement — Masonry
10/23/2023
Special inspection requirement — Final
10/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/26/2023
Signed off — Alteration
FN/PS197Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# 116242 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00733934-I1
05/15/2023
Permit issued — General Construction
Q00673583-S2-GC
05/02/2023
Permit issued — General Construction
Q00673583-I1-GC
05/02/2023
Permit issued — General Construction
Q00673583-I1-GC
04/13/2023
Violation issued (ECB, open)
Construction
04/13/2023
Violation issued (ECB, closed)
Construction
02/03/2023
Permit issued — Plumbing
Q00673583-S1-PL
01/31/2023
Permit issued — General Construction
Q00673583-I1-GC
01/31/2023
Permit issued — Construction Fence
Q00785055-I1-FN
12/29/2022
Filed — Alteration
Q00785055-I1
11/21/2022
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-P5
11/17/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
11/15/2022
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-P1
11/15/2022
Filed — Alteration
Replacing existing area drains with area drains equipped with ADA Compliant Grates and approximately 2 LF of CIP.
Q00673583-P4
11/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
NELSON LOPEZ
06/14/2022
Permit issued — Construction Fence
Q00733934-I1-FN
05/10/2022
Filed — Alteration
FN/PS197Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# 116242 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00733934-I1
04/12/2022
Objection resolved — Addressed
04/12/2022
Objection resolved — Addressed
04/08/2022
Violation issued (ECB, closed)
Construction
04/08/2022
Violation issued (ECB, open)
Construction
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/04/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/05/2025
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/17/2024
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/17/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/07/2024
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/15/2023
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/02/2023
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS05/02/2023
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC02/03/2023
DOB NOWGeneral ConstructionPermit IssuedRIZVI BUILDERS01/31/2023
DOB NOWConstruction FencePermit IssuedRIZVI BUILDERS01/31/2023
DOB NOWConstruction FenceSigned-offENVIROTRAC LTD06/14/2022
BISMHISSUEDNAMRON, INC02/10/2022
BISOTISSUEDVENUS GROUP INC09/30/2021
BISMHISSUEDCHAPMAN & EVANS INC04/09/2021
BISPLISSUEDMAR-SAL PLBG & HTG, INC04/09/2021
BISEQISSUEDVENUS GROUP INC01/07/2021
BISOTISSUEDVENUS GROUP INC07/09/2020
BISPLISSUEDMAR-SAL PLBG & HTG, INC02/11/2020
BISEQISSUEDROMA SCAFFOLDING INC01/22/2020
BISEQISSUEDVENUS GROUP INC01/03/2020
BISEQISSUEDROMA SCAFFOLDING INC12/13/2019
BISOTISSUEDVENUS GROUP INC02/13/2019
BISMHISSUEDCHAPMAN & EVANS INC02/13/2019
BISPLISSUEDMAR-SAL PLBG & HTG, INC02/13/2019
BISEQISSUEDROMA SCAFFOLDING INC02/07/2019
BISEQISSUEDROMA SCAFFOLDING INC12/28/2018
BISOTISSUEDKISS CONSTRUCTION INC08/09/2018
BISOTISSUEDKISS CONSTRUCTION INC10/02/2017
BISOTISSUEDKISS CONSTRUCTION INC11/14/2016
BISOTISSUEDKISS CONSTRUCTION INC01/28/2016
BISOTISSUEDGS TECHNO BUILDERS INC09/26/2013
BISOTISSUEDKISS CONSTRUCTION INC07/11/2013
BISPLISSUEDTHOMAS F. CASH & SONS INC04/18/2013
BISPLISSUEDTHOMAS F. CASH & SONS INC02/01/2012
BISOTISSUEDGS TECHNO BUILDERS INC02/01/2012
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/13/1999
1 project · most recent 01/27/2025
Storm
FiledStatusContractorScope
01/27/2025Permit IssuedVARSITY PLBG AND HTG INCStorm
11 projects · most recent 09/12/2024
General Wiring
FiledStatusContractorScope
09/12/2024CompleteCHARAN ELEC'L ENTERP'S IN—
01/03/2024CompleteANCO ELECTL CONTCTNG INC—
04/10/2023CompleteCHARAN ELEC'L ENTERP'S IN—
11/11/2022CompleteGEMINI ELECTRIC CO., INC.—
03/23/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/14/2021CompleteALL VOLTS ELECTRICAL INCGeneral Wiring
06/04/2019CompleteRMD ELECTRIC CORPGeneral Wiring
05/23/2019CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
04/11/2019CompleteSELECTRIC ELECL CONT CO IGeneral Wiring
01/16/2019CompleteLASER ELEC'L CONSTR'G INC—
09/28/2018Permit IssuedSTANCO SYSTEM ELEC'L CONT—
1 project · most recent 01/27/2025
Masonry
FiledStatusContractorScope
01/27/2025Permit IssuedVARSITY PLBG AND HTG INCMasonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/10/2023Masonry—special
10/23/2023Final—progress
11/17/2022Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
11/14/2022Fenestration and door U-factor and product ratingsNELSON LOPEZenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps197 QueensEducation—
Project Q00785055 Alteration · Permit Entire · 12/29/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026Q00733934-I1Request digital key ↗
08/25/2026Q00673583-S1Request digital key ↗
08/25/2026Q00673583-P5Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/25/2026Q00673583-I1Open ↗
08/25/2026Q00673583-S3Open ↗
08/25/2026Q00673583-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00673583-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026Q00785055-I1Open ↗
08/13/2026Q00733934-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/14/2026Q00673583-I1Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/25/2026Q00673583-P4Open ↗
08/25/2026Q00673583-P5Open ↗
08/25/2026Q00673583-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/25/2026Q00673583-P1Open ↗
08/25/2026Q00673583-S1Open ↗
08/15/2026Q00673583-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/25/2026Q00673583-S1Open ↗
08/15/2026Q00673583-S3Open ↗
08/15/2026Q00673583-S2Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/19/2013402889987Open ↗
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/25/2026Q00673583-S1Open ↗
08/25/2026Q00673583-P1Open ↗
08/15/2026Q00673583-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026Q00733934-I1Open ↗