← Back
General warehouse
8-51 ASTORIA BOULEVARD
QUEENS · BIN 4005553
💬 Discuss this project
1910Year Built
2Stories
E1Building Class
R6AZoning
2,000 sfGross Floor Area
1Units
5 Open Violations 4 unresolved · 1 paperwork only ▸
General warehouse · Owner of record: LITO PROPERTIES LLC · 2,250 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction5p · 2 filings · 5 docs
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DND REALTY MANAGMENT1307/08/2026
LITO PROPERTIES LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAR ARCHITECTURE & ENGINEERING P.C.106/27/2025
JBA210/21/2022
OMAR ELSHERIF, P.E.210/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING403/21/2026
MAR DESIGN SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIDTOWN PLBG & HTNG CORPPlumbing207/08/2026
MAR CODE INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415110/21/2022
MAR CODE INC.7000210/05/2021
Building Lifecycle
All (27)Filed (5)Permit Issued (3)Signed Off (1)Violation (12)Objection (6)
05/01/2026
Permit issued — Plumbing
Q08016741-I1-PL
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Scope
07/23/2025
Objection raised — Inspections
07/21/2025
Objection raised — Scope
06/27/2025
Filed — Alteration
INSTALL NEW MECHANICAL SYSTEM FOR THE KITCHEN COOKING EQUIPMENT AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS
Q01243723-I1
06/20/2024
Permit issued — Plumbing
Q08016741-I1-PL
10/21/2022
Filed — Alteration
FILING TO RESOLVE VIOLATIONS AND DO WORK AS PER PLANS
Q08016741-I1
10/21/2022
Filed — Alteration
Q08016721-I1
12/13/2021
Violation issued (ECB, closed)
Construction
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/24/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/19/2021
Violation issued (ECB, closed)
Construction
10/22/2021
Signed off — Alteration
FILING FOR EMERGENCY TEMPORARY BRACING TO STABLIZE THE PARTIALLY REMOVED WALL AND TO INSTALL SHORING/ BRACING SYSTEM AND TO RESTORE THE EXISTING MASONRY WALL TO THE EXISTING CONDITION AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS
Q00591417-I1
10/05/2021
Filed — Alteration
FILING FOR EMERGENCY TEMPORARY BRACING TO STABLIZE THE PARTIALLY REMOVED WALL AND TO INSTALL SHORING/ BRACING SYSTEM AND TO RESTORE THE EXISTING MASONRY WALL TO THE EXISTING CONDITION AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS
Q00591417-P1
09/27/2021
Permit issued — Structural
Q00591417-I1-ST
09/15/2021
Filed — Alteration
FILING FOR EMERGENCY TEMPORARY BRACING TO STABLIZE THE PARTIALLY REMOVED WALL AND TO INSTALL SHORING/ BRACING SYSTEM AND TO RESTORE THE EXISTING MASONRY WALL TO THE EXISTING CONDITION AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS
Q00591417-I1
08/31/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (ECB, open)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2021
Violation issued (ECB, open)
Plumbing
08/25/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMIDTOWN PLBG & HTNG CORP05/01/2026
DOB NOWPlumbingPermit IssuedMIDTOWN PLBG & HTNG CORP06/20/2024
DOB NOWStructuralSigned-offMAR CODE INC09/27/2021
1 project · most recent 10/21/2022
Gas Water/Sanitary
FiledStatusContractorScope
10/21/2022Permit IssuedMIDTOWN PLBG & HTNG CORPGas, Water/Sanitary
1 project · most recent 02/13/2024
FiledStatusContractorScope
02/13/2024Permit IssuedPOWER SURGE ELECTRIC, INC1 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/21/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
10/21/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
10/05/2021Structural Stability – Alterations of existing buildingsOMAR ELSHERIFspecial
10/05/2021MasonryOMAR ELSHERIFspecial
10/05/2021FinalOMAR ELSHERIFprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00591417-P1Request digital key ↗
08/27/2026Q00591417-I1Request digital key ↗
08/25/2026Q08016721-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00591417-I1Open ↗
08/13/2026Q08016721-I1Open ↗
08/13/2026Q00591417-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q08016721-I1Open ↗
08/24/2026Q00591417-P1Open ↗
08/24/2026Q00591417-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q08016721-I1Open ↗
08/24/2026Q00591417-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q08016741-I1Open ↗
08/13/2026Q08016721-I1Open ↗