DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB11/28/2022FTM FACADE AND APPURTENANCES. ON 11/25/22 GLASS FACADE PANELS FAILED FROM 4TH & 5TH FLOORS AT EXP1(EAST ELV). REMEDY: OWNER TO IMMED RETAIN SERVICES OF NYS REG DESIGN PROF WITH GLASS FACADE TO INSPECT AND EVAL 100% OF ALL GLASS PANELS FROM FLOOR TO FLOOR AND CAUSE OF FAILURE FILE AND PERMIT ALL WORK SUBMIT REPORT AND REPAIR
DOB11/25/2022STRUCTURE RENDERED NON-COMPLIANT DUE TO (2) EXTERIOR WINDOWS VANDOLIZED AT THE 3RD/4TH FLOOR EXTENSION EXPOSURE (1) AND FULLY REMOVED BY FDNY TO PROTECT THE BUILDING AND SIDEWALK
DOB11/25/2022STRUCTURE RENDERED NON-COMPLIANT DUE TO (2) TWO EXTERIOR WINDOWS VANDO RIZED AT THE 3RD/3TH FLOOR EXTERIOR EXPOSUR (1) AND FULLY REMOVE BY FD NY TO PROTECT THE BUILDING AND SIDEWALK
DOB11/29/2021CYCLE 9C UNSAFE REPORT FILED
DOB06/09/2021FAILURE TO COMPLY. ON 7/13/2020 COMMISSIONER'S ORDER 313191 (071320CLL10301EK)WAS ISSUED TO INSPECT 100% OF ALL FACADES BY HAND TO EVAL FACADE COND. INCL GLASS WINDOW & GLASS CURTAIN WALL IMMED BY QEWI (QUALIFIED EXTERIOR WALL INSPECTOR)& TO SUBMIT FORENSIC/STRUCT REPORT AS OF 6/9/2020 OWNER HAS NOT COMPLIED.REMEDY:IMMED COMPLY W/COMM ORDER
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/13/2020OUTER GLASS OF THE DOUBLE PANE GLASS APPROX. 8FT" BY 12FT".FELL FROM 6TH FLRTO SIDEWALK.REMEDY:OWNER TO IMMEDIATELY RETAIN NYS LIC.PROF.TO TO INSPECT 100% OF ALL FACADE BY HAND.EVALUATE FACADE COND.,INCLUDING GLASS WIND.&GLASS CURTAIN WALL.PREPARE&SUBMIT FORENSIC/STRUCTURAL ENG REPT TO FACADEUNIT WITHIN 1 MO.8/13/20-EMAIL FACADES@BUILDINGS.NYC.GOV
DOB11/26/2008FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS ON SITE AT TIME OF INSPECTI ON CONTRACTOR PERFORMING EXCAVATION SOE, PILE INSTALLATION AND NEW FOU NDATION WALLS WITHOUT PLANS ON SITE FOR SOE REMEDY:STOP ALL WORK PROVIDE PLANS
ECB06/08/2026VF.. R T S.. ELEVATOR IN BUILDING OUT OF SERVICE UPON INSPECTION THE DEVICE IS FOUND TO BE OUT OF SERVICE CREATING A HAZARDOUS CONDITION AS PER IRCNY 11-02 , REPAIR AND RESTORE TO SERVICE IMMEDIATELY...RE INSPEHearing held — result not yet published$1K proposed
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#916688.REM:FILE ACCEPTABLE REPORT.Hearing held — result not yet published$1K proposed
ECB03/18/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9C REPORT INDICATING COORECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #916688. REMEDY: FILE ACCEPTABLE REPORT.Nothing owed — awaiting certificate of correction
ECB07/11/2023OBSERVE SIDEWALK SHED INSTALLED AT EXP#1,3&4 NOT AS PER CODE.EXP#3 SIDEWALK SHED MISSING PARAPET PANEL (BC 3307.6.4.6)SHED NOT EXTENDED 5FT PAST BUILDING LINE(BC 3307.6.3).EXP#1 PEDESTRIAN WALKWAY IS 3FT,6IN ANNothing owed — awaiting certificate of correction
ECB05/28/2021FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.AT TIME OF INSPECTION OBSERVED DEFECTIVE FACADE CONSISTING OF MISSIONS/BROKEN GLASS PANELS AT VARIOUS LOCATIONS EXP #4 WEST ELEVATION OF THIS PROPENothing owed — awaiting certificate of correction
ECB07/03/2020FAILURES TO MAINTAIN BUILDING WALLS OF APPURTENANCES.NOTED:THE ALL GLASS FACADE IS MISSING TWO APPROX 8FT X 10FT IN SIZE.INSULATED PANELS ONE WHICH HAS SHATTERED TODAY THE OTHER AT SOME OTHER DATE WITH UNKNOWNNothing owed — awaiting certificate of correction
ECB06/10/2020AT TIME OF INSPECTION, OBSERVED LARGE GLASS PANEL APPROXIMATELY FIVE FEET X 12 FEET LOCATED AT FORTH STORY EXPOSURE ONE. BROKEN WITH LOOSE PIECES DANGLING, VERY HAZARDOUS CONDITION OATH SUMMONS ISSUED., REPAIRNothing owed — awaiting certificate of correction
ECB03/01/2010WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: OBSERVED AN ADDITIONAL 11 SECTIONS HIGH & 2 SECTIONS WIDE ERECTED FROM THE GROUND TO THE ROOF. APPROVED PLANS SHOWNothing owed — awaiting certificate of correction
ECB12/08/2009SEC. BC 3314.6 FAILURE TO PROVIDE SAFE / PROPER FOOTINGS FOR SUPPORTEDSCAFFOLD. NOTED SCAFFOLD ERECTED @ EXP. # 3 IS ERECTED ON BRICK PR STORE BLOCKS STACKED UP & SCREW JACKS ARE OVER EXTENDED APPROX. 18" 12"Nothing owed — awaiting certificate of correction
ECB11/23/2009"STOP ALL WORK" FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES.NO GUARD RAILS AT ALL FLOORS PERIMETER GUARD RAILS NOT TO CODE BLDG UNSAFE STOP ALL WORK EXCEPT TO PROVIDE SAFETY (PICTURES # DATED) CALLNothing owed — awaiting certificate of correction
Condo, commercial tower (mixed-use) [derived] · 2,660 sf lot · 5.11 FAR built · Flood zone X