← Back
Two family frame
8 DEWEY AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5061530
💬 Discuss this project
1980Year Built
2Stories
B2Building Class
R3XZoning
2,302 sfGross Floor Area
2Units
Two family frame · 4,627 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC109/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272109/12/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/11/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01280612-I1
09/22/2025
Permit issued — Solar
S01280612-I1-SL
09/12/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01280612-I1
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/02/2025
Special inspection requirement — Final
Walid Abdulla
09/02/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/22/2025
BISOTISSUEDPRO CUSTOM SOLAR LLC10/24/2018
3 projects · most recent 03/09/2026
HVAC Wiring
FiledStatusContractorScope
03/09/2026Permit IssuedALL BALANCED ELECTRICAL INC.HVAC Wiring
09/12/2025CompleteSUNRUN SOLAR ELECTL CORP—
11/01/2018CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/02/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/02/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/02/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/02/2025FinalWalid Abdullaprogress
09/02/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01280612-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/23/2018540156953Open ↗
▸BISWORK PERMIT APPLICATION1
10/23/2018540156953Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01280612-I1Open ↗
08/23/2026S01280612-I1Open ↗
08/23/2026S01280612-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S01280612-I1Open ↗
08/23/2026S01280612-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/23/2018540156953Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/23/2018540156953Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/23/2018540156953Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01280612-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/23/2018540156953Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/23/2018540156953Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01280612-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/02/2019540156953Open ↗
10/23/2018540156953Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/23/2018540156953Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/02/2019540156953Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/23/2018540156953Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
04/02/2019540156953Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/02/2019540156953Open ↗
10/23/2018540156953Open ↗
▸Approvals, Objections & Sign-offs3
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
04/02/2019540156953Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/02/2019540156953Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01280612-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/02/2019540156953Open ↗
10/23/2018540156953Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/23/2018540156953Open ↗