← Back
Elevator apt, fireproof with stores
8 EAST 16 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1016078
💬 Discuss this project
1847Year Built
5Stories
D6Building Class
C6-2AZoning
20,795 sfGross Floor Area
20Units
Rent Stabilized49 Open Violations 44 unresolved · 5 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: ASH II LLC · 5,433 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof36p · 3 filings · 20 docs
Floor 46p · 1 filing · 15 docs
Floor 313p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar32p · 2 filings · 20 docs
Basement16p · 3 filings · 20 docs
Sub-Basement32p · 3 filings · 20 docs
Site & exterior24p · 1 filing · 20 docs
Filed — no permit issued7p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARIN MANAGEMENT CORP.9307/08/2026
CREDIT SHELTER TRUST903/21/2026
MARIN MAN CORP303/21/2026
CREDIT SHELTER TRUST MARIN M203/21/2026
ASH II LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY2403/21/2026
KUSHNER STUDIOS1003/21/2026
JM ZONING, LLC.803/21/2026
NEW YORK ENGINEERING ASSOCIATES P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIENA CONSTRUCTION LTDGeneral Contractor807/08/2026
BIG BEAR CUSTOM BUILD,INCGeneral Contractor603/21/2026
CALRAY GAS HEAT CORPPlumbing407/08/2026
AVELLINO, LOUISElectrical303/21/2026
DICKSON, CHARDElectrical303/21/2026
AQEL SHEET METAL INCGeneral Contractor203/21/2026
AUTHENTIC PLBG CORPPlumbing207/08/2026
DYNAMIC AIR CONDITIONINGGeneral Contractor107/08/2026
C SCHLOSBERG INCElectrical103/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
CASTILLO JR, JORGEElectrical103/21/2026
VISHWADAT MATAPERSADElectrical103/21/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
KRSLOVIC, ANTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704708/19/2025
BEYOND ARCH LLC3600107/23/2025
YAN ENGINEERING PLLC7851505/23/2024
EC SPECIAL INSPECTIONS83551004/23/2024
NEW YORK ENGINEERING ASSO851501/30/2024
Building Lifecycle
All (183)Filed (33)Permit Issued (18)Signed Off (16)Violation (60)Inspection (12)Objection (14)Special Inspection (30)
12/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Hackjong Choi
11/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
josh brandfonbrener
10/28/2025
Filed — Alteration CO
FILING HEREWITH TO PROVIDE EGRESS FROM REAR YARD VIA NEW EXIT PASSAGEWAY TO STREET AS A RESULT OF BLOCKED ACCESS TO ADJOINING LOT. NO CHANGE IN USE, OCCUPANCY OR BULK.
M01235798-P2
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/01/2025
Filed — Alteration CO
FILING HEREWITH TO PROVIDE EGRESS FROM REAR YARD VIA NEW EXIT PASSAGEWAY TO STREET AS A RESULT OF BLOCKED ACCESS TO ADJOINING LOT. NO CHANGE IN USE, OCCUPANCY OR BULK.
M01235798-P1
09/30/2025
Signed off — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-S1
09/30/2025
Signed off — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-I1
09/18/2025
Permit issued — General Construction
M01235798-I1-GC
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
08/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
08/19/2025
Filed — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-P1
08/19/2025
Filed — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-P2
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
08/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Bomstein
08/18/2025
Special inspection requirement — Lighting in dwelling units
Alexander Bomstein
08/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/23/2025
Filed — Alteration CO
FILING HEREWITH TO PROVIDE EGRESS FROM REAR YARD VIA NEW EXIT PASSAGEWAY TO STREET AS A RESULT OF BLOCKED ACCESS TO ADJOINING LOT. NO CHANGE IN USE, OCCUPANCY OR BULK.
M01235798-I1
05/01/2025
Permit issued — Plumbing
M01196003-S1-PL
04/30/2025
Permit issued — General Construction
M01196003-I1-GC
04/25/2025
Filed — Alteration
M01211945-I1
04/21/2025
Filed — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-S1
04/21/2025
Filed — Alteration
JOB FILED FOR EXIST. APT #2 & #5 MINOR INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, POLISH WOOD FLOOR, NEW KITCHEN CABINET AND REPLACE BATHROOM FIXTURE AND TILES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01196003-I1
03/17/2025
Signed off — Alteration
JOB FILING FOR REPLACE EX. WOOD JOISTS WITH I BEAM AT THE NORTHWEST CORNER OF THE ROOF AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
M01025271-I1
01/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT PREIVOUSLY FILED UNDER #ALT412/88 AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. PUBLIC ASSEMBLY FILED UNDER #104311255
M00840409-S1
01/09/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT PREIVOUSLY FILED UNDER #ALT412/88 AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. PUBLIC ASSEMBLY FILED UNDER #104311255
M00840409-I1
10/01/2024
Violation issued (ECB, closed)
Elevators
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2024
Signed off — Alteration
RELOCATION OF EXISTING TOILET & LAVATORY ON NEW ROUGHS AS INDICATED ON THE DRAWINGS FILED HEREIN.
M00804818-I1
08/12/2024
Signed off — Alteration
RELOCATION OF EXISTING TOILET & LAVATORY ON NEW ROUGHS AS INDICATED ON THE DRAWINGS FILED HEREIN.
M00804818-S1
08/12/2024
Signed off — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT PREIVOUSLY FILED UNDER #ALT412/88 AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. PUBLIC ASSEMBLY FILED UNDER #104311255
M00840409-S2
05/31/2024
Special inspection requirement — Final
SHI YAN
05/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
SHI YAN
05/31/2024
Special inspection requirement — Structural Steel - Details
SHI YAN
05/23/2024
Filed — Alteration
JOB FILING FOR REPLACE EX. WOOD JOISTS WITH I BEAM AT THE NORTHWEST CORNER OF THE ROOF AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
M01025271-P2
05/22/2024
Permit issued — Structural
M01025271-I1-ST
05/22/2024
Special inspection requirement — Final
SHI YAN
05/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/22/2024
Special inspection requirement — Structural Steel - Details
SHI YAN
05/07/2024
Filed — Alteration
JOB FILING FOR REPLACE EX. WOOD JOISTS WITH I BEAM AT THE NORTHWEST CORNER OF THE ROOF AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
M01025271-P1
04/26/2024
Special inspection requirement — Final
ABDALLAH ELCHERBINI
04/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/26/2024
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
04/26/2024
Special inspection requirement — Post-installed Anchors
ABDALLAH ELCHERBINI
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/24/2024
Objection raised — Admin
04/24/2024
Objection resolved — Addressed
04/23/2024
Filed — Alteration
MINOR INTERIOR RENOVATION OF AN EXISTING EATING AND DRINKING ESTABLISHMENT PREIVOUSLY FILED UNDER #ALT412/88 AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. PUBLIC ASSEMBLY FILED UNDER #104311255
M00840409-P3
04/18/2024
Filed — Alteration
JOB FILING FOR REPLACE EX. WOOD JOISTS WITH I BEAM AT THE NORTHWEST CORNER OF THE ROOF AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
M01025271-I1
04/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Latest 60 of 183 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSIENA CONSTRUCTION LTD09/18/2025
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP05/01/2025
DOB NOWGeneral ConstructionSigned-offSIENA CONSTRUCTION LTD04/30/2025
DOB NOWStructuralSigned-offSIENA CONSTRUCTION LTD05/22/2024
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP08/10/2023
DOB NOWStructuralSigned-offSIENA CONSTRUCTION LTD08/08/2023
DOB NOWMechanical SystemsSigned-offA&R HOME IMPROV & CONSTR07/18/2023
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC06/08/2023
DOB NOWGeneral ConstructionSigned-offBIG BEAR CUSTOM BUILD,INC06/02/2023
DOB NOWGeneral ConstructionSigned-offBIG BEAR CUSTOM BUILD,INC05/08/2023
DOB NOWStructuralSigned-offSIENA CONSTRUCTION LTD12/22/2022
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP10/05/2022
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP02/08/2022
DOB NOWGeneral ConstructionSigned-offSIENA CONSTRUCTION LTD01/31/2022
DOB NOWMechanical SystemsSigned-offAQEL SHEET METAL INC02/18/2021
DOB NOWBoiler EquipmentSigned-offCALRAY GAS HEAT CORP12/07/2020
DOB NOWBoiler EquipmentSigned-offCALRAY GAS HEAT CORP12/07/2020
DOB NOWPlumbingSigned-offCALRAY GAS HEAT CORP12/02/2020
BISPLISSUEDROCK E SMALL PLBG&HTG INC08/13/2018
BISPLISSUEDROCK E SMALL PLBG&HTG INC04/16/2018
BISFPISSUEDSENTINEL FIRE SAFETY CORP03/04/2016
BISMHISSUEDAIR-EXCEL SERVICE CORP05/22/2009
BISEQISSUEDCSC OF NY INC01/08/2009
BISEQISSUEDCSC OF NY INC11/26/2008
BISFPISSUEDSENTINEL FIRE CONTROL INC.06/06/2006
BISOTISSUEDMARBAY CONSTRUCTION CORP.03/15/2006
BISEQISSUEDVLAD RESTORATION LTD12/27/2005
BISEQISSUEDVLAD RESTORATION LTD08/26/2005
BISOTISSUEDPISTONE CONSTRACTORS INC.12/01/2004
BISOTISSUEDUNIVERSAL GROUPS OF NEW YORK INC10/15/2002
BISPLISSUEDFLYTIGER P & H LTD10/01/2002
BISMHISSUEDUNIVERSAL GROUPS OF NEW YORK INC08/20/2002
BISOTISSUEDMARBAY CONST. CORP.01/15/2002
3 projects · most recent 05/04/2025
General Wiring
FiledStatusContractorScope
05/04/2025Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
02/06/2024Permit IssuedLITCO ELECTRIC CORP.General Wiring
02/17/2022CompletePAUL M. & SON'S ELECL CONGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
11/21/2025Tenant Protection Plan ComplianceHackjong Choispecial
11/21/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
11/21/2025Fire-Resistance Rated Constructionjosh brandfonbrenerprogress
10/23/2025Fire-Resistance Rated Construction—progress
10/21/2025Fire-Resistant Penetrations and Joints—special
10/21/2025Tenant Protection Plan Compliance—special
09/18/2025Tenant Protection Plan Compliance—special
08/29/2025Tenant Protection Plan ComplianceAlexander Bomsteinspecial
08/29/2025Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
08/18/2025Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
08/18/2025Tenant Protection Plan Compliance—special
08/18/2025Energy Code Compliance InspectionsAlexander Bomsteinprogress
08/18/2025Lighting in dwelling unitsAlexander Bomsteinenergy_progress
08/18/2025Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
08/18/2025Tenant Protection Plan Compliance—special
05/31/2024Tenant Protection Plan ComplianceSHI YANspecial
05/31/2024FinalSHI YANprogress
05/31/2024Structural Steel - DetailsSHI YANspecial
05/22/2024Structural Steel - DetailsSHI YANspecial
05/22/2024FinalSHI YANprogress
05/22/2024Tenant Protection Plan Compliance—special
04/26/2024Mechanical SystemsABDALLAH ELCHERBINIspecial
04/26/2024Post-installed AnchorsABDALLAH ELCHERBINIspecial
04/26/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/26/2024Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
Latest 25 of 73.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch26
09/03/2026M00642821-S1Request digital key ↗
09/03/2026M00642821-P1Request digital key ↗
09/01/2026M08010440-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/02/2026M00395111-P2Request digital key ↗
09/02/2026M00395111-S1Request digital key ↗
09/02/2026M00395111-S3Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00395111-S4Request digital key ↗
09/02/2026M00395111-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00395111-I1Request digital key ↗
08/15/2026M00395111-P1Request digital key ↗
▸Applications & Permits45
▸DOB NOWLPC Approval/Permit30
08/21/2026M01235798-I1Open ↗
08/21/2026M01235798-P1Open ↗
08/13/2026M01235798-P2Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
05/23/2024123356359Open ↗
07/26/2018123550184Open ↗
06/29/2018122640455Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
08/13/2018123550184Open ↗
03/18/2016122640455Open ↗
05/22/2009120040909Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY3
10/19/2023104311255Open ↗
10/02/2018104311255Open ↗
10/01/2018104311255Open ↗
▸Seals & Professional Certifications98
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/02/2026M00395111-S4Open ↗
09/02/2026M00395111-P1Open ↗
09/02/2026M00395111-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026M00642821-I1Open ↗
09/23/2026M00395111-S1Open ↗
09/16/2026M01025271-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026M00395111-S1Open ↗
09/23/2026M00395111-S1Open ↗
09/23/2026M00395111-S1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/26/2018123550184Open ↗
02/23/2018123356359Open ↗
03/18/2016122640455Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/26/2018123550184Open ↗
05/19/2009120040909Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/26/2018123550184Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/19/2009120040909Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/26/2018123550184Open ↗
06/29/2018122640455Open ↗
01/08/2016122640455Open ↗
▸BISEQUIPMENT USE PERMITS1
08/13/2009120040909Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
08/13/2009120040909Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan7
08/13/2026M00395111-S3Open ↗
08/13/2026M00395111-S1Open ↗
08/13/2026M00395111-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStreet Tree Checklist3
08/21/2026M01235798-I1Open ↗
08/21/2026M01235798-P1Open ↗
08/13/2026M01235798-P2Open ↗
▸BISTenant Protection Plan and Notes2
07/30/2018123550184Open ↗
02/23/2018123356359Open ↗
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/02/2026M00395111-S4Open ↗
09/02/2026M00395111-P1Open ↗
09/02/2026M00395111-P2Open ↗
Showing 3 of 32 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/19/2009120040909Open ↗
05/19/2009120040909Open ↗
05/19/2009120040909Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2016122640455Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/17/2008110392003Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00395111-S1Open ↗
08/13/2026M00395111-S3Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/23/2018123356359Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
05/19/2009120040909Open ↗
11/17/2008110392003Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/13/2009120040909Open ↗
▸BISLANDMARKS APPROVAL1
05/19/2009120040909Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
07/26/2018123550184Open ↗
02/23/2018123356359Open ↗
01/08/2016122640455Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET4
07/26/2018123550184Open ↗
02/23/2018123356359Open ↗
01/08/2016122640455Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
10/02/2018104311255Open ↗
10/01/2018104311255Open ↗
06/29/2018122640455Open ↗
▸BISADDITIONAL INFORMATION1
11/08/2023104311255Open ↗
▸Other Documents13
▸DOB NOWProof of Historic Building8
08/21/2026M01235798-I1Open ↗
08/21/2026M01235798-P1Open ↗
08/13/2026M01211945-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification3
08/21/2026M01235798-P1Open ↗
08/21/2026M01235798-I1Open ↗
08/13/2026M01235798-P2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/08/2023104311255Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00642821-I1Open ↗