← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
8 FAIRVIEW PLACE
BROOKLYN · BIN 3425933
💬 Discuss this project
2016Year Built
5Stories
RMBuilding Class
R6Zoning
26,735 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: FAIRVIEW RESIDENCE LLC · 6,667 sf lot · 4.01 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof4p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1608 42ND STREET103/22/2026
1259 49TH STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUDSON VALLEY ENGINEERING305/09/2025
OPTIMUS ARCHITECTURE210/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROOKSTONE DEVELOPERS LLCGeneral Contractor507/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
M&D FIRE SPRINKLER INCFire Protection107/08/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616605/09/2025
Building Lifecycle
All (116)Filed (5)Permit Issued (5)Signed Off (3)Violation (30)Inspection (5)Objection (38)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
06/13/2025
Violation issued (HPD, closed)
A
05/27/2025
Signed off — Alteration
Plumbing and sprinkler work in conjunction with GC filing.
B00952516-S2
05/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/16/2025
Special inspection requirement — Final
FAHAD FATEH
05/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/16/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/12/2025
Signed off — Alteration
Plumbing and sprinkler work in conjunction with GC filing.
B00952516-S1
05/09/2025
Filed — Alteration
Plumbing and sprinkler work in conjunction with GC filing.
B00952516-P2
04/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2025
Signed off — Alteration
Plumbing and sprinkler work in conjunction with GC filing.
B00952516-I1
04/07/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/07/2025
Special inspection requirement — Final
FAHAD FATEH
04/07/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/21/2025
Permit issued — Sprinklers
B00952516-S1-EW-SP
12/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Permit issued — General Construction
B00952516-I1-GC
10/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
10/11/2024
Special inspection requirement — Final
FAHAD FATEH
10/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/11/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
10/11/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
10/11/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
10/11/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
10/11/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
10/07/2024
Filed — Alteration
Plumbing and sprinkler work in conjunction with GC filing.
B00952516-P1
09/30/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2024
Permit issued — Sprinklers
B00952516-S1-PL
05/03/2024
Objection resolved — Addressed
04/10/2024
Permit issued — Mechanical Systems
B00952516-S2-MS
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/13/2024
Objection resolved — Addressed
03/11/2024
Objection resolved — Addressed
03/01/2024
Objection resolved — Addressed
03/01/2024
Objection resolved — Addressed
02/29/2024
Objection resolved — Addressed
02/28/2024
Objection resolved — Addressed
02/28/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC02/21/2025
DOB NOWGeneral ConstructionSigned-offBROOKSTONE DEVELOPERS12/05/2024
DOB NOWSprinklersSigned-offAL PLUMBING & CONT. INC06/06/2024
DOB NOWMechanical SystemsSigned-offBROOKSTONE DEVELOPERS04/10/2024
DOB NOWGeneral ConstructionSigned-offBROOKSTONE DEVELOPERS12/06/2023
BIS—ISSUEDBROOKSTONE DEVELOPERS LLC10/16/2024
BIS—RE-ISSUEDEDIFICE BUILDERS LLC06/07/2018
BISEQISSUEDSILVERCUP SCFFLDNG I LLC06/01/2018
BISPLISSUEDPRIME PIPING & HEATING IN03/29/2018
BIS—ISSUEDEDIFICE BUILDERS LLC12/08/2017
BIS—ISSUEDEDIFICE BUILDERS LLC11/27/2017
BIS—ISSUEDEDIFICE BUILDERS LLC11/27/2017
BISEQISSUEDEDIFICE BUILDERS LLC11/27/2017
BISEQISSUEDSILVERCUP SCFFLDNG I LLC06/28/2017
BISPLISSUEDPRIME PIPING & HEATING IN03/20/2017
BIS—ISSUEDEDIFICE BUILDERS LLC12/01/2016
BIS—ISSUEDEDIFICE BUILDERS LLC12/01/2016
BIS—ISSUEDEDIFICE BUILDERS LLC12/23/2015
BISEQISSUEDEDIFICE BUILDERS LLC12/23/2015
BIS—ISSUEDEDIFICE BUILDERS LLC12/23/2015
2 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
04/09/2018CompleteNYC ELECTRICAL CONTRG INC19 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
05/16/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
05/16/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/16/2025FinalFAHAD FATEHprogress
05/16/2025Maintenance informationFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/16/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/16/2025Mechanical SystemsFAHAD FATEHspecial
04/28/2025Tenant Protection Plan Compliance—special
04/07/2025Mechanical SystemsFAHAD FATEHspecial
04/07/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/07/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/07/2025FinalFAHAD FATEHprogress
04/07/2025Maintenance informationFAHAD FATEHenergy_progress
04/07/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/07/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/11/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/11/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/11/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/11/2024Tenant Protection Plan ComplianceFAHAD FATEHspecial
10/11/2024FinalFAHAD FATEHprogress
10/11/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
10/11/2024Lighting controlsFAHAD FATEHenergy_progress
10/11/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
10/11/2024Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 44.
▾Documents — 204 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00952516-P1Request digital key ↗
08/26/2026B00952516-P2Request digital key ↗
08/26/2026B00952516-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION20
06/11/2025322117963Open ↗
09/25/2024322117963Open ↗
09/23/2024322117963Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION16
10/22/2024322117963Open ↗
10/07/2024322117963Open ↗
08/31/2018321253585Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
10/13/2018321253585Open ↗
10/13/2018321253585Open ↗
06/25/2018321253585Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/03/2025322117963Open ↗
04/12/2018321253585Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/12/2016321274660Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
11/23/2018321253585Open ↗
11/19/2018321253585Open ↗
11/13/2015321253585Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/27/2025322117963Open ↗
▸BISZONING DIAGRAM1
12/29/2015321253585Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/12/2015321253585Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/12/2015321253585Open ↗
▸BISVERIFY TAX LOT1
03/31/2025322117963Open ↗
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/27/2018321253585Open ↗
09/27/2018321253585Open ↗
09/27/2018321253585Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026B00952516-S1Open ↗
09/23/2026B00952516-S1Open ↗
09/17/2026B00952516-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00952516-S1Open ↗
09/17/2026B00952516-P2Open ↗
09/01/2026B00952516-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00952516-P2Open ↗
08/26/2026B00952516-P1Open ↗
08/26/2026B00952516-S2Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2017340517854Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/27/2017340517854Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2017340517854Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
11/16/2018321253585Open ↗
11/09/2018321253585Open ↗
11/07/2018321253585Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
04/24/2025322117963Open ↗
09/24/2018321281000Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/09/2015321253585Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/16/2018321253585Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST4
06/23/2025322117963Open ↗
09/27/2024322117963Open ↗
11/19/2015321274660Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/23/2018321253585Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/27/2018321253585Open ↗
09/27/2018321253585Open ↗
08/31/2016321253585Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
09/13/2018321253585Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/27/2017340517854Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
09/20/2017321253585Open ↗
09/20/2017321253585Open ↗
08/31/2016321253585Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/22/2018321253585Open ↗
12/28/2015321253585Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/15/2018340517854Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/24/2015321253585Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
10/22/2018321253585Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
08/02/2018321253585Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/15/2026B00952516-S1Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION13
06/11/2025322117963Open ↗
09/27/2024322117963Open ↗
09/27/2024322117963Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
06/11/2025322117963Open ↗
09/25/2024322117963Open ↗
09/23/2024322117963Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/12/2018321253585Open ↗
10/18/2018321281000Open ↗
08/15/2018340517854Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/12/2016321274660Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
06/08/2018321253585Open ↗
06/08/2018321253585Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/27/2024322117963Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/28/2015321253585Open ↗
▸BISCOST AFFIDAVIT1
12/09/2015321281000Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION15
06/23/2025322117963Open ↗
11/08/2018321253585Open ↗
10/22/2018321253585Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET7
08/30/2024322117963Open ↗
12/27/2017321702181Open ↗
12/11/2015321253585Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
12/12/2018321253585Open ↗
11/20/2018321253585Open ↗
10/24/2018321253585Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
06/27/2017340517854Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/12/2016321274660Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
02/09/2018321702181Open ↗
02/09/2018321702181Open ↗
02/09/2018321702181Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDHCR Document5
08/13/2026B00952516-S2Open ↗
08/13/2026B00952516-S1Open ↗
08/13/2026B00952516-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
09/05/2024322117963Open ↗
11/19/2018321253585Open ↗
11/13/2015321253585Open ↗
▸BISDHCR DOCUMENT1
09/27/2024322117963Open ↗