← Back
BuildNYC
Two family frame
8 FROSINONE LANE
STATEN ISLAND · BIN 5164350
💬 Discuss this project
2019Year Built
2Stories
B2Building Class
R3XZoning
3,955 sfGross Floor Area
2Units
Two family frame · 6,746 sf lot · 0.59 FAR built · Flood zone VE
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation2p · 1 filing · 8 docs
Floor 11p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Joline Estates903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering101/27/2025
Rogers Calvanico Group102/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Solar ElectlElectrical203/21/2026
Thomas J SovieroElectrical103/21/2026
M.S.B. Development CoGeneral Contractor107/08/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
Capital Contracting P&HPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272101/27/2025
Building Lifecycle
04/22/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01169848-I1
01/29/2025
Permit issued — Solar
S01169848-I1-SL
01/27/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01169848-I1
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service01/29/2025
DOB NOWCurb CutSigned-offM.S.B. Development Co02/13/2023
BISOTISSUEDSunrun Installation Service09/01/2023
BIS—ISSUEDM.S.B. Development Co03/19/2023
BISPLISSUEDCapital Contracting P&H12/13/2022
BISPLISSUEDCapital Contracting P&H12/13/2022
BIS—ISSUEDM.S.B. Development Co03/12/2022
BISPLISSUEDCapital Contracting P&H09/15/2021
BISPLISSUEDCapital Contracting P&H08/11/2021
BIS—ISSUEDM.S.B. Development Co03/24/2021
BIS—ISSUEDM.S.B. Development Co03/25/2020
BIS—ISSUEDM.S.B. Development Co03/21/2019
BISPLISSUEDCapital Contracting P&H07/18/2018
BIS—ISSUEDM.S.B. Development Co07/11/2018
3 projects · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteSunrun Solar Electl—
09/01/2023CompleteSunrun Solar Electl—
05/10/2023CompleteCeco ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/02/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/21/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
01/21/2025FinalWalid Abdullaprogress
01/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
136 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account