8 HAVEMEYER STREET
BROOKLYN · BIN 3061857
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-2/R6AZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: 6 HAVEMEYER STREET LLC · 1,676 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction63p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 7Under Construction5p · 1 filing · 5 docs
Floor 6Under Construction54p · 5 filings · 20 docs
Floor 5Under Construction63p · 6 filings · 20 docs
Floor 4Under Construction65p · 6 filings · 20 docs
Floor 3Under Construction63p · 6 filings · 20 docs
Floor 2Under Construction63p · 6 filings · 20 docs
Floor 1Under Construction63p · 7 filings · 20 docs
MezzanineUnder Construction44p · 3 filings · 20 docs
3 jobs · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
03/25/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
03/03/2025Permit IssuedNASH ELECTRIC SERVICES IN—
3 jobs · most recent 05/07/2026
Concrete
FiledStatusContractorScope
05/07/2026Permit IssuedSUCCESS DEVELOPERS LLCConcrete
07/17/2025Permit IssuedSUCCESS DEVELOPERS LLC2 scope_items
05/20/2024——Concrete
2 jobs · most recent 01/13/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
01/13/2026Permit IssuedCS BRIDGE CORPSidewalk Shed
01/21/2025Permit IssuedSUCCESS DEVELOPERS LLCScaffold
Building Lifecycle
All (141)Filed (21)Permit Issued (17)Violation (8)Inspection (13)Objection (52)Special Inspection (30)
08/17/2026
Permit issued — Structural
B00637100-S7-ST
07/21/2026
Permit issued — General Construction
B00637100-I1-GC
07/02/2026
Permit issued — Structural
B08022026-I1-ST
06/29/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/22/2026
Objection raised — Scope
05/13/2026
Violation issued (ECB, closed)
Unknown
05/13/2026
Violation issued (ECB, closed)
Construction
05/12/2026
Objection resolved — Addressed
05/07/2026
Filed — New Building
6 STORY & MEZZANINE MIXED USED BUILDING.
B00637100-S7
05/07/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/07/2026
Special inspection requirement — Final
FAHAD FATEH
04/02/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/02/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
04/02/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/02/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/02/2026
Special inspection requirement — Metering
FAHAD FATEH
04/02/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/02/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/02/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/02/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/02/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/02/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
04/02/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/02/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
03/27/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/19/2026
Objection resolved — Addressed
03/16/2026
Objection raised — Zoning
03/11/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
03/06/2026
Violation issued (ECB, closed)
Construction
03/03/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/02/2026
Filed — New Building
6 STORY & MEZZANINE MIXED USED BUILDING.
B00637100-P2
02/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/26/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
02/26/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
02/26/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
02/26/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/26/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/26/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/18/2026
Permit issued — Supported Scaffold
B01168342-I1-SF
02/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2026
Objection resolved — Addressed
01/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/26/2026
Objection raised — Scope
01/23/2026
Permit issued — Sidewalk Shed
B01183420-I1-SH
01/21/2026
Permit issued — Supported Scaffold
B01183555-I1-SF
Latest 60 of 141 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6 HAVEMEYER1807/08/2026
SUCCESS DEVELOPERS403/22/2026
6 HAVEMEYER STREET LLC103/22/2026
6-8 HAVEMEYER REALTY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/20/2017$1.9M—Private party → 6-8 HAVEMEYER REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1503/21/2026
6 HAVEMEYER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUCCESS DEVELOPERS LLCGeneral Contractor1408/26/2026
CS BRIDGE CORPGeneral Contractor807/08/2026
ARIEL SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161005/07/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSUCCESS DEVELOPERS LLC08/17/2026
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC07/21/2026
DOB NOWStructuralPermit IssuedSUCCESS DEVELOPERS LLC07/02/2026
DOB NOWSupported ScaffoldPermit IssuedSUCCESS DEVELOPERS LLC02/18/2026
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP01/23/2026
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP01/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP01/20/2026
DOB NOWFoundationPermit IssuedSUCCESS DEVELOPERS LLC12/29/2025
DOB NOWSupport of ExcavationPermit IssuedSUCCESS DEVELOPERS LLC12/29/2025
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC12/12/2025
DOB NOWStructuralPermit IssuedSUCCESS DEVELOPERS LLC06/23/2025
DOB NOWSupported ScaffoldPermit IssuedCS BRIDGE CORP02/28/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCS BRIDGE CORP02/24/2025
DOB NOWSidewalk ShedPermit IssuedCS BRIDGE CORP02/24/2025
DOB NOWPlumbingPermit IssuedDG MECHANICAL HEATING INC02/18/2025
DOB NOWSupport of ExcavationPermit IssuedSUCCESS DEVELOPERS LLC12/17/2024
DOB NOWFoundationPermit IssuedSUCCESS DEVELOPERS LLC10/29/2024
BISEQISSUEDG & S CONSTRUCTION INC02/26/2018
BIS—ISSUEDG & S CONSTRUCTION INC02/26/2018
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/27/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/11/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/09/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/03/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
05/07/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/07/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
05/07/2026FinalFAHAD FATEHprogress
04/02/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
04/02/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/02/2026Interior lighting powerFAHAD FATEHenergy_progress
04/02/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
04/02/2026Lighting controlsFAHAD FATEHenergy_progress
04/02/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/02/2026Maintenance informationFAHAD FATEHenergy_progress
04/02/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/02/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/02/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/02/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/02/2026MeteringFAHAD FATEHenergy_progress
04/02/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
04/02/2026Fenestration areasFAHAD FATEHenergy_progress
04/02/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/02/2026Air barrier — testing FAHAD FATEHenergy_progress
04/02/2026Exterior lighting powerFAHAD FATEHenergy_progress
02/26/2026Maintenance informationFAHAD FATEHenergy_progress
02/26/2026Interior lighting powerFAHAD FATEHenergy_progress
02/26/2026MeteringFAHAD FATEHenergy_progress
02/26/2026Exterior lighting powerFAHAD FATEHenergy_progress
02/26/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 75.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/28/2026B08022026-I1Request digital key ↗
08/27/2026B00805688-I1Request digital key ↗
08/25/2026B01052528-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
02/27/2018321629047Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/27/2017321629047Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram5
08/18/2026B00637100-I1Open ↗
08/15/2026B00637100-P2Open ↗
08/13/2026B00637100-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00637100-P1Open ↗
08/13/2026B00637100-I1Open ↗
08/13/2026B00637100-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00637100-I1Open ↗
08/13/2026B00637100-P1Open ↗
08/13/2026B00637100-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00637100-I1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/28/2026B08022026-I1Open ↗
08/27/2026B00805688-I1Open ↗
08/25/2026B01052528-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026B08034215-I1Open ↗
09/27/2026B08034215-I1Open ↗
09/02/2026B08034215-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/27/2026B08034215-I1Open ↗
09/02/2026B08034215-P1Open ↗
09/01/2026B00637100-P2Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/17/2018321629047Open ↗
02/27/2018321629047Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00637100-P2Open ↗
08/13/2026B00637100-P1Open ↗
08/13/2026B00637100-I1Open ↗
▸BISGAS CUT-OFF1
02/27/2018321629047Open ↗
▸BISWATER CUT-OFF1
02/27/2018321629047Open ↗
▸BISELECTRIC CUT-OFF1
02/27/2018321629047Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
02/27/2018321629047Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/18/2026B00637100-I1Open ↗
08/15/2026B00637100-P2Open ↗
08/15/2026B00637100-P1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/27/2018321629047Open ↗
07/27/2017321629047Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
02/27/2018321629047Open ↗
02/27/2018321629047Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
02/27/2018321629047Open ↗
07/27/2017321629047Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00637100-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/27/2018321629047Open ↗
07/27/2017321629047Open ↗
▸BISRODENT CONTROL1
02/27/2018321629047Open ↗
▸Inspections & Test Reports3
▸DOB NOWSoil Report2
08/13/2026B01019414-I1Open ↗
08/13/2026B01052528-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01052528-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/27/2018321629047Open ↗
▸BISLANDMARKS APPROVAL1
02/27/2018321629047Open ↗
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/27/2018321629047Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/27/2018321629047Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/27/2017321629047Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026B00637100-P2Open ↗
08/13/2026B00637100-P1Open ↗
08/13/2026B00637100-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00637100-P2Open ↗
08/13/2026B00637100-P1Open ↗
08/13/2026B00637100-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026B00637100-I1Open ↗
08/15/2026B00637100-P2Open ↗
08/15/2026B00637100-P1Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields3
08/18/2026B00637100-I1Open ↗
08/15/2026B00637100-P2Open ↗
08/15/2026B00637100-P1Open ↗
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION1
11/17/2017321629047Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00637100-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01052528-I1Open ↗