← Back
BuildNYC
Mansion type or town house
8 MONTAGUE TERRACE
BROOKLYN · Brooklyn Heights · BIN 3001517
💬 Discuss this project
1879Year Built
4Stories
A7Building Class
R6Zoning
11,580 sfGross Floor Area
1Units
Rent Stabilized3 Active Violations ▸
Mansion type or town house · Owner of record: M8T · 4,140 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRear facade and roof work17p · 1 filing · 20 docs
Floor 48p · 3 filings · 20 docs
Floor 37p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
BasementRear facade and roof work4p · 3 filings · 20 docs
Sub-BasementRear facade and roof work18p · 3 filings · 20 docs
Site & exteriorRear facade and roof work30p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Montague Terrace Development2303/21/2026
M8T1003/21/2026
Jerrick Associates203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/24/2020$25.5M—Private party → M8T LP$2,202/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode2403/21/2026
New Force Construction103/21/2026
PCS Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Smi Construction MangementGeneral Contractor1407/08/2026
Donato PlumbingGeneral Contractor503/22/2026
New Force ConstructionScaffold407/08/2026
Donato PlumbingPlumbing407/08/2026
Arcon Plumbing SolutionsPlumbing307/08/2026
Andamio ScaffoldingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CES Engineering1277803/18/2024
Skyline Engineering267310/19/2022
Building Lifecycle
07/27/2026
Elevator Category 1 inspection report filed
11/24/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/03/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
08/26/2024
Elevator Category 5 inspection report filed
04/24/2024
Signed off — Alteration
Minor interior renovation of the single-family dwelling including the removal of non-bearing partitions and the doors, new partitions and associated renovation. No change of use, egress or occupancy.
B00472502-I1
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDonato Plumbing03/15/2024
DOB NOWPlumbingSigned-offArcon Plumbing Solutions07/13/2023
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen03/02/2023
DOB NOWStructuralSigned-offSmi Construction Mangemen03/01/2023
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen03/01/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding11/10/2022
DOB NOWSupported ScaffoldSigned-offNew Force Construction Co09/09/2022
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen08/01/2022
DOB NOWSidewalk ShedSigned-offNew Force Construction Co07/28/2022
DOB NOWPlumbingSigned-offArcon Plumbing Solutions07/21/2022
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen04/15/2022
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen04/06/2022
DOB NOWStructuralSigned-offSmi Construction Mangemen04/06/2022
DOB NOWStructuralSigned-offSmi Construction Mangemen04/01/2022
DOB NOWSupported ScaffoldSigned-offNew Force Construction Co11/04/2021
DOB NOWPlumbingSigned-offArcon Plumbing Solutions07/23/2021
DOB NOWGeneral ConstructionSigned-offSmi Construction Mangemen04/04/2021
BISBLISSUEDOrbit Plumbing & Heating10/24/2019
BISMHISSUEDSchimenti Construction Co06/25/2019
BIS—ISSUEDSchimenti Construction Co04/26/2019
BIS—ISSUEDSchimenti Construction Co04/19/2019
BISPLISSUEDOlympic Plumbing & Heating Service03/19/2019
BISPLISSUEDOlympic Plumbing & Heating Service03/11/2019
BISMHISSUEDSchimenti Construction Co03/11/2019
BISEQISSUEDJ & G Construction Services10/05/2018
BIS—ISSUEDSchimenti Construction Co09/17/2018
BISEQISSUEDJ & G Construction Services09/11/2018
BISPLISSUEDOlympic Plumbing & Heating Service07/02/2018
BISEQISSUEDJ & G Construction Services05/23/2018
BIS—ISSUEDSchimenti Construction Co04/19/2018
BISEQISSUEDJerrick Associates11/06/2017
BIS—ISSUEDDMC Builders10/16/2017
BISEQISSUEDJ & G Construction Services10/12/2017
BISEQISSUEDJ & G Construction Services09/27/2017
BISPLISSUEDOlympic Plumbing & Heating Service09/22/2017
BISPLISSUEDOlympic Plumbing & Heating Service07/03/2017
BISEQISSUEDJ & G Construction Services04/21/2017
BISPLISSUEDOlympic Plumbing & Heating Service03/29/2017
BISEQISSUEDJerrick Associates11/17/2016
BISPLISSUEDOlympic Plumbing & Heating Service09/22/2016
+ 10 more permits on file
4 projects · most recent 12/15/2023
General Wiring
FiledStatusContractorScope
12/15/2023CompleteJoseph Sgroi & SonsGeneral Wiring
02/27/2020CompleteAmr Electrical ContractingGeneral Wiring
02/25/2019CompleteAmr Electrical ContractingGeneral Wiring
01/05/2018CompleteR.C.M. ElectricGeneral Wiring
1 project · most recent 01/26/2022
Steel
FiledStatusContractorScope
01/26/2022Signed-offSmi Construction MangemenSteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/19/2024Fire-Resistant Penetrations and JointsDelbert Smithspecial
03/19/2024Fire-Resistant Penetrations and JointsDelbert Smithspecial
02/09/2024Fire-Resistant Penetrations and JointsDelbert Smithspecial
10/25/2022MasonryMatthew Wavrospecial
10/25/2022FinalMatthew Wavroprogress
10/25/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/19/2022Fire-Resistant Penetrations and JointsDelbert Smithspecial
02/14/2022FinalMatthew Wavroprogress
02/14/2022Post-installed AnchorsMatthew Wavrospecial
02/14/2022Structural Stability – Alterations of existing buildingsMatthew Wavrospecial
02/14/2022Structural Steel - DetailsMatthew Wavrospecial
02/14/2022Structural Steel - High Strength BoltingMatthew Wavrospecial
02/14/2022Structural Steel - WeldingMatthew Wavrospecial
01/27/2022Fire-Resistant Penetrations and JointsDelbert Smithspecial
01/27/2022FinalTIMOTHY HAYNESprogress
01/07/2022Fire-Resistant Penetrations and JointsDelbert Smithspecial
08/31/2021Structural Steel - Welding—special
08/31/2021Structural Steel - High Strength Bolting—special
08/31/2021Structural Stability – Alterations of existing buildings—special
08/31/2021Structural Steel - Details—special
08/31/2021Post-installed Anchors—special
08/31/2021Final—progress
477 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account