Two family frame
8 PARKWOOD AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5084706
💬 Discuss this project
1986Year Built
2Stories
B2Building Class
R3XZoning
2,648 sfGross Floor Area
2Units
Two family frame · 12,177 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof4p · 1 filing · 17 docs
Floor 12p · 2 filings · 20 docs
Cellar5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC211/06/2024
THINK DESIGN ARCHITECTURE508/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2D CONSTRUCTION CORPGeneral Contractor203/21/2026
DONATO, INCPlumbing207/08/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272211/06/2024
THINK DESIGN ARCHITECTURA683508/08/2023
Building Lifecycle
All (48)Filed (7)Permit Issued (4)Signed Off (3)Inspection (4)Special Inspection (30)
10/08/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119822-I1
11/06/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119822-P1
11/06/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/06/2024
Special inspection requirement — Final
Walid Abdulla
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/31/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/31/2024
Special inspection requirement — Final
Walid Abdulla
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/09/2024
Permit issued — Solar
S01119822-I1-SL
10/04/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119822-I1
12/18/2023
Signed off — Alteration
Application is filed for plumbing work filed in conjunction with GC application #S00724261 Interior alteration of existing 2-family 2-story residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this apP
S00724286-I1
11/20/2023
Signed off — Alteration
Application is filed for interior alteration of existing 2-story 2-family residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this application. No new certificate of occupancy to be issues under this app.
S00729849-I1
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
08/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
08/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
08/25/2023
Special inspection requirement — Maintenance information
Frank Martarella III
08/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
08/24/2023
Permit issued — Plumbing
S00724286-I1-PL
08/08/2023
Filed — Alteration
Application is filed for plumbing work filed in conjunction with GC application #S00724261 Interior alteration of existing 2-family 2-story residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this apP
S00724286-P3
07/28/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/27/2023
Filed — Alteration
Application is filed for plumbing work filed in conjunction with GC application #S00724261 Interior alteration of existing 2-family 2-story residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this apP
S00724286-P2
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
05/31/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
05/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
05/31/2023
Special inspection requirement — Maintenance information
Frank Martarella III
05/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
04/24/2023
Filed — Alteration
Application is filed for plumbing work filed in conjunction with GC application #S00724261 Interior alteration of existing 2-family 2-story residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this apP
S00724286-P1
01/12/2023
Special inspection requirement — Maintenance information
Frank Martarella III
01/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
01/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
01/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
01/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
01/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
08/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/27/2022
Permit issued — Plumbing
S00724286-I1-PL
06/02/2022
Permit issued — General Construction
S00729849-I1-GC-CX
05/25/2022
Filed — Alteration
Application is filed for interior alteration of existing 2-story 2-family residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this application. No new certificate of occupancy to be issues under this app.
S00729849-I1
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
05/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
05/06/2022
Filed — Alteration
Application is filed for plumbing work filed in conjunction with GC application #S00724261 Interior alteration of existing 2-family 2-story residence. All work as per plans submitted herewith. No change in use, egress or occupancy filed under this apP
S00724286-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/09/2024
DOB NOWPlumbingSigned-offDONATO, INC08/24/2023
DOB NOWPlumbingSigned-offDONATO, INC06/27/2022
DOB NOWGeneral ConstructionSigned-off2D CONSTRUCTION CORP06/02/2022
2 projects · most recent 10/04/2024
General Wiring
FiledStatusContractorScope
10/04/2024CompleteSUNRUN SOLAR ELECTL CORP—
01/13/2023CompleteHIGH BEAM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/06/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/06/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/06/2024FinalWalid Abdullaprogress
11/06/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/31/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/31/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/31/2024FinalWalid Abdullaprogress
10/31/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/31/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/25/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
08/25/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
08/25/2023HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
08/25/2023HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
08/25/2023Maintenance informationFrank Martarella IIIenergy_progress
08/25/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
05/31/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
05/31/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
05/31/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
05/31/2023HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/31/2023Maintenance informationFrank Martarella IIIenergy_progress
05/31/2023HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
01/12/2023Maintenance informationFrank Martarella IIIenergy_progress
01/12/2023HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
01/12/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
Latest 25 of 38.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026S00729849-I1Request digital key ↗
08/22/2026S00724286-P1Request digital key ↗
08/22/2026S00724286-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026S01119822-I1Open ↗
09/02/2026S01119822-I1Open ↗
09/02/2026S01119822-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026S01119822-I1Open ↗
09/02/2026S01119822-I1Open ↗
09/02/2026S00724286-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026S00729849-I1Open ↗
08/22/2026S00724286-P1Open ↗
08/22/2026S00724286-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026S00729849-I1Open ↗
08/22/2026S00724286-P1Open ↗
08/22/2026S00724286-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00729849-I1Open ↗
08/13/2026S00724286-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01119822-I1Open ↗