← Back
BuildNYC
Two family frame
8 PARKWOOD AVENUE
STATEN ISLAND · BIN 5084706
💬 Discuss this project
1986Year Built
2Stories
B2Building Class
R3XZoning
2,648 sfGross Floor Area
2Units
Two family frame · 12,177 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof mounted solar panel installation4p · 1 filing · 17 docs
Floor 11p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering211/06/2024
Think Design Architecture508/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DonatoPlumbing207/08/2026
2D Constructionspecialty_contractor203/21/2026
Sunrun Solar ElectlElectrical103/22/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272211/06/2024
Think Design Architectural683508/08/2023
Building Lifecycle
10/08/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119822-I1
11/06/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119822-P1
11/06/2024
Special inspection requirement — Final
Walid Abdulla
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/09/2024
DOB NOWPlumbingSigned-offDonato08/24/2023
DOB NOWPlumbingSigned-offDonato06/27/2022
DOB NOWMechanical SystemsSigned-off2D Construction06/02/2022
2 projects · most recent 10/04/2024
General Wiring
FiledStatusContractorScope
10/04/2024CompleteSunrun Solar Electl—
01/13/2023CompleteHigh Beam ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/06/2024FinalWalid Abdullaprogress
11/06/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/06/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/06/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
11/06/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/31/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/31/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/31/2024FinalWalid Abdullaprogress
10/31/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/31/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/25/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
08/25/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
08/25/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
08/25/2023Maintenance informationFrank Martarella IIIenergy_progress
08/25/2023HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
08/25/2023HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
05/31/2023HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
05/31/2023HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
05/31/2023Maintenance informationFrank Martarella IIIenergy_progress
05/31/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
05/31/2023Energy Code Compliance InspectionsFrank Martarella IIIprogress
05/31/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
01/12/2023Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
01/12/2023Maintenance informationFrank Martarella IIIenergy_progress
01/12/2023HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
Latest 25 of 38.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account