1897Year Built
2Stories
B3Building Class
R6Zoning
2,630 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,617 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 27p · 3 filings · 20 docs
Floor 12p · 1 filing · 19 docs
Cellar6p · 3 filings · 20 docs
Basement4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEEP FORMATION INC HUGO A103/22/2026
BH1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2024$2.1M—— → —$798/sf building
09/18/2019$930K—Private party → BHNWN BROOKLYN LLC$354/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CROP612/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RCGA ARCHITECTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEEP FORMATION INCGeneral Contractor903/21/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616612/22/2023
Building Lifecycle
All (64)Filed (6)Permit Issued (4)Signed Off (2)Violation (3)Inspection (9)Objection (10)Special Inspection (30)
02/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/22/2024
Signed off — Alteration
Propose to perform an interior renovation work at the basement, 1st and 2nd floor of 3 story -two family brick house. No change in use, egress and occupancy.
B00778986-I1
03/21/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/08/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/23/2024
Signed off — Alteration
Filing to remove gas raiser diagram as there was no gas in the building.
B00783814-I1
01/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/22/2023
Filed — Alteration
Filing to remove gas raiser diagram as there was no gas in the building.
B00783814-P1
12/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/20/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/20/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/20/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/20/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/20/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/20/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/20/2023
Special inspection requirement — Masonry
FAHAD FATEH
11/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/09/2023
Filed — Alteration CO
Filing PAA for changes as per field conditions to previously approved drawings.
B00780630-P1
11/09/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/09/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/09/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/09/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/09/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/09/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/09/2023
Special inspection requirement — Masonry
FAHAD FATEH
11/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
10/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2023
Permit issued — General Construction
B00780630-I1-GC
11/25/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/25/2022
Special inspection requirement — Masonry
FAHAD FATEH
11/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/25/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/18/2022
Filed — Alteration
Propose to perform an interior renovation work at the basement, 1st and 2nd floor of 3 story -two family brick house. No change in use, egress and occupancy.
B00778986-P1
11/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/20/2022
Permit issued — Plumbing
B00783814-I1-PL
10/20/2022
Violation issued (ECB, closed)
Construction
09/17/2022
Permit issued — General Construction
B00778986-I1-GC
09/17/2022
Permit issued — General Construction
B00780630-I1-GC
09/06/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Admin
08/22/2022
Objection raised — Other
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection raised — Other
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection raised — Other
08/22/2022
Objection resolved — Addressed
08/22/2022
Objection raised — Other
08/22/2022
Objection resolved — Addressed
08/14/2022
Filed — Alteration CO
Filing PAA for changes as per field conditions to previously approved drawings.
B00780630-I1
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDEEP FORMATION INC09/25/2023
DOB NOWPlumbingSigned-offPLBG P & H INC10/20/2022
DOB NOWGeneral ConstructionSigned-offDEEP FORMATION INC09/17/2022
DOB NOWGeneral ConstructionPermit IssuedDEEP FORMATION INC09/17/2022
BIS—ISSUEDBETTER HOMES DEPOT INC04/20/2000
1 project · most recent 01/03/2024
General Wiring
FiledStatusContractorScope
01/03/2024CompleteRIVIERA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/21/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/08/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
12/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
12/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/20/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/20/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/20/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
11/20/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/20/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/20/2023Fenestration areasFAHAD FATEHenergy_progress
11/20/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/20/2023Fenestration air leakageFAHAD FATEHenergy_progress
11/20/2023Interior lighting powerFAHAD FATEHenergy_progress
11/20/2023MasonryFAHAD FATEHspecial
11/20/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/09/2023Fenestration air leakageFAHAD FATEHenergy_progress
11/09/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/09/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/09/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
11/09/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/09/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/09/2023Fenestration areasFAHAD FATEHenergy_progress
11/09/2023Interior lighting powerFAHAD FATEHenergy_progress
11/09/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/09/2023MasonryFAHAD FATEHspecial
11/09/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/25/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 34.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B00783814-P1Request digital key ↗
08/28/2026B00778986-I1Request digital key ↗
08/28/2026B00778986-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/28/2026B00778986-I1Open ↗
08/14/2026B00783814-I1Open ↗
08/13/2026B00780630-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00778986-P1Open ↗
08/29/2026B00778986-I1Open ↗
08/27/2026B00780630-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B00783814-I1Open ↗
08/28/2026B00778986-I1Open ↗
08/26/2026B00780630-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00778986-P1Open ↗
08/29/2026B00778986-I1Open ↗
08/27/2026B00780630-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00780630-P1Open ↗
08/13/2026B00780630-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B00778986-I1Open ↗
08/26/2026B00780630-P1Open ↗
08/14/2026B00783814-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00780630-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/26/2026B00780630-P1Open ↗
08/14/2026B00780630-I1Open ↗