← Back
Three families
8 ST JAMES PLACE
BROOKLYN · BIN 3055359
💬 Discuss this project
1876Year Built
3Stories
C0Building Class
R6BZoning
3,200 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,600 sf lot · 2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 11p · 1 filing · 12 docs
Cellar1p · 1 filing · 12 docs
Basement3p · 1 filing · 12 docs
1 job · most recent 08/04/2021
FiledStatusContractorScope
08/04/2021CompleteBROOKYLN SOLARWORKS, LLC—
1 job · most recent 05/31/2024
Steel Concrete
FiledStatusContractorScope
05/31/2024——Steel, Concrete
Building Lifecycle
All (29)Filed (3)Violation (13)Special Inspection (13)
06/10/2025
Violation issued (HPD, closed)
A
05/31/2024
Filed — Alteration
Subsequent application for concrete/steel deck, Window/door lintel, concrete steps.
B01050930-S2
05/31/2024
Filed — Alteration
Subsequent application for concrete/steel deck, Window/door lintel, concrete steps.
B01050930-I1
05/31/2024
Filed — Alteration
Subsequent application for concrete/steel deck, Window/door lintel, concrete steps.
B01050930-S3
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
05/28/2024
Special inspection requirement — Post-installed Anchors
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/20/2024
Special inspection requirement — Post-installed Anchors
05/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/20/2024
Special inspection requirement — Structural Steel - Details
05/20/2024
Special inspection requirement — Concrete - Cast-In-Place
05/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
05/20/2024
Special inspection requirement — Structural Steel - Welding
05/14/2024
Special inspection requirement — Final
05/14/2024
Special inspection requirement — Mechanical Systems
05/14/2024
Special inspection requirement — Final
11/17/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
09/08/1983
Violation issued (HPD, open)
A
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2021$2.6M—Private party → Private party$809/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FERNANDO FISBEIN ARCHITECT DPC305/31/2024
NOVUM ENGINEERING1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOMMA DESIGN CONSULTING803/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDBROOKLYN SOLARWORKS LLC06/21/2021
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/31/2024Fire-Resistant Penetrations and Joints—special
05/31/2024Fire-Resistance Rated Construction—progress
05/28/2024Post-installed Anchors—special
05/28/2024Fire-Resistant Penetrations and Joints—special
05/20/2024Post-installed Anchors—special
05/20/2024Structural Stability – Alterations of existing buildings—special
05/20/2024Structural Steel - Details—special
05/20/2024Concrete - Cast-In-Place—special
05/20/2024Structural Steel - High Strength Bolting—special
05/20/2024Structural Steel - Welding—special
05/14/2024Final—progress
05/14/2024Mechanical Systems—special
05/14/2024Final—progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01050930-I1Request digital key ↗
08/25/2026B01050930-S2Request digital key ↗
08/25/2026B01050930-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/18/2021340815292Open ↗
▸BISWORK PERMIT APPLICATION1
06/21/2021340815292Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026B01050930-S2Open ↗
08/25/2026B01050930-I1Open ↗
08/25/2026B01050930-S3Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/18/2021340815292Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
06/21/2021340815292Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01050930-S2Open ↗
08/25/2026B01050930-S1Open ↗
08/25/2026B01050930-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/18/2021340815292Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/16/2021340815292Open ↗
06/18/2021340815292Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/16/2021340815292Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
09/16/2021340815292Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/18/2021340815292Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/16/2021340815292Open ↗
06/18/2021340815292Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/16/2021340815292Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/16/2021340815292Open ↗
▸BISLANDMARKS SIGNOFF1
09/16/2021340815292Open ↗
▸BISLANDMARKS APPROVAL1
06/18/2021340815292Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/16/2021340815292Open ↗
06/18/2021340815292Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/18/2021340815292Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B01050930-I1Open ↗