| Owner | Filings | Most Recent |
|---|---|---|
| OWNER OF 418 VAN BRUNT | 1 | 03/22/2026 |
| OWNER OF 418 VANBRUNT ST | 1 | 03/22/2026 |
| TO THE OWNER OF PREMISES | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GREEN SOLUTIONS ENGINEERING & ENERG | 3 | 05/13/2025 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 2 | 05/12/2025 |
| OFFICE OF URBAN TERRAINS LLC | 1 | 05/08/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| J CALLAHAN CONSULTING | 12 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/13/2025 | — | — | Generators, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM48NAMHZ-U1 54,000 BTU · Heat Pump Outdoor ×3 MXZ-SM36NAMHZ-U1 42,000 BTU · Heat Pump Outdoor ×2 Ventilation Lifebreath HE07RT 125 CFM · Erv ×5 Renewaire HE07RT 550 CFM · Erv ×1 Generators Generac Generac 24 kW · Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2025 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2025 | — | — | Steel, Masonry, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/06/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 05/05/2025 | Shutoff dampers | — | energy_progress |
| 05/05/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/05/2025 | Maintenance information | — | energy_progress |
| 05/05/2025 | Electrical motors and elevators | — | energy_progress |
| 05/05/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/05/2025 | Permanent certificate | — | energy_progress |
| 05/05/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/05/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 05/05/2025 | Non Potable Water Systems | — | special |
| 05/05/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/05/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/05/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/05/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/05/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/05/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 04/15/2025 | Sprinkler Systems | — | special |
| 04/15/2025 | Mechanical Systems | — | special |
| 04/15/2025 | Final | — | progress |
| 04/15/2025 | Construction Utilizing CLT or SCL, Type IV | — | special |
| 04/09/2025 | Post-installed Anchors | — | special |
| 04/09/2025 | Masonry | — | special |
| 04/09/2025 | Structural Steel - Details | — | special |
| 04/09/2025 | Structural Steel - High Strength Bolting | — | special |
| 04/09/2025 | Structural Steel - Welding | — | special |