← Back
BuildNYC
MANHATTAN
5 WEST 13TH STREET
MANHATTAN · Greenwich Village · BIN 1091959
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
6 Active Violations 2 unresolved · 4 paperwork only 2 old, status unconfirmed ▸
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTitan outrigger platform installation, 5th to 29th floorsUnder Construction3 filings
RoofHoist installationUnder Construction1 filing · 9 docs
Floor 6Resolution Real Estate1p · 2 filings
Floor 5Interior Alteration1 filing
Floor 4Interior Alteration1 filing
Floor 3Interior Alteration1 filing
Floor 2Resolution Real Estate1p · 2 filings
Floor 1Interior Alteration1 filing
Site & exteriorHoist installationUnder Construction7 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Legion Investment Group310/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2024$57.5M—KALBEN W 14 OWNER LLC → 5W13 OWNER LLC— not available
07/11/2023$31.1M—8-12 WEST 14TH ASSOCIATES LLC → FRIEDLAND W 14 OWNER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJ Engineering & Design109/29/2026
G. Blinn Consulting209/18/2026
Wailoon Wong307/09/2026
Gregory Moormann102/06/2026
Mdeas Architects104/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Casino Development GroupScaffold109/30/2026
S&E Bridge & ScaffoldScaffold109/22/2026
Demar PlumbingFire Protection109/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks317407/09/2026
Building Lifecycle
All (111)Filed (8)Permit Issued (27)Violation (60)Inspection (5)Objection (4)Special Inspection (7)
10/02/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
09/29/2026
Filed — Alteration
Installation of five Titan outrigger platforms on each floor, from the 5th floor to the 29th floor.
M01436794-I1
09/29/2026
Permit issued — Protection and Mechanical Methods
M01436794-I1-PMM
09/22/2026
Objection resolved — Addressed
09/21/2026
Permit issued — Protection and Mechanical Methods
M01295973-S4-PMM
09/18/2026
Filed — Alteration
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING NB CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01295973-S4
09/18/2026
Permit issued — Standpipe
M01164499-S9-EW-SD
09/15/2026
Permit issued — Sidewalk Shed
M01295973-S2-SH
09/15/2026
Objection raised — Other
08/18/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Other
08/07/2026
Violation issued (ECB, open)
Construction
07/29/2026
Permit issued — Construction Fence
M01295973-S3-FN
07/23/2026
Permit issued — Structural
M01164499-S2-ST
07/22/2026
Permit issued — Protection and Mechanical Methods
M01428903-I1-PMM
07/20/2026
Permit issued — General Construction
M01164499-I1-GC
07/17/2026
Permit issued — Mechanical Systems
M01164499-S4-MS
07/09/2026
Filed — New Building
New Plumbing fixtures and piping for new 30 story mixed use building, filed in conjunction with NB M01164499-I1
M01164499-P3
07/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
07/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/29/2026
Permit issued — Sidewalk Shed
M01295973-S2-SH
06/26/2026
Filed — Alteration
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING NB CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01295973-S2
06/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/16/2026
Permit issued — Protection and Mechanical Methods
M01295973-S1-PMM
06/16/2026
Permit issued — Protection and Mechanical Methods
M01295973-I1-PMM
06/09/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/05/2026
Permit issued — Protection and Mechanical Methods
M01411773-I1-PMM
06/04/2026
Permit issued — Protection and Mechanical Methods
M01411790-I1-PMM
05/14/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/13/2026
Permit issued — Foundation
M01164499-S1-FO
02/06/2026
Filed — New Building
New Plumbing fixtures and piping for new 30 story mixed use building, filed in conjunction with NB M01164499-I1
M01164499-P1
02/04/2026
Filed — New Building
New Plumbing fixtures and piping for new 30 story mixed use building, filed in conjunction with NB M01164499-I1
M01164499-S9
01/30/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MAXIM KORNGOLD
01/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
01/30/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
MAXIM KORNGOLD
01/30/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
MAXIM KORNGOLD
01/20/2026
Special inspection requirement — Standpipe Systems
Maxim Korngold
12/22/2025
Permit issued — Foundation
M01164499-S1-FO
12/19/2025
Permit issued — Support of Excavation
M01164499-S5-SE
11/12/2025
Permit issued — Plumbing
M01164499-S6-PL
11/12/2025
Permit issued — Foundation
M01164499-S1-FO
11/06/2025
Permit issued — Support of Excavation
M01164499-S5-SE
08/20/2025
Filed — New Building
New Plumbing fixtures and piping for new 30 story mixed use building, filed in conjunction with NB M01164499-I1
M01164499-S6
08/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MAXIM KORNGOLD
08/08/2025
Permit issued — Construction Fence
M01265734-I1-FN
03/03/2025
Permit issued — Sidewalk Shed
M00846910-I1-SH
12/16/2024
Permit issued — Supported Scaffold
M01068877-I1-SF
12/16/2024
Permit issued — Protection and Mechanical Methods
M01129548-I1-PMM
05/10/2024
Permit issued — General Construction
M01041909-I1-GC
03/04/2024
Permit issued — Sidewalk Shed
M00846910-I1-SH
01/16/2024
Violation issued (ECB, open)
Local Law
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/13/2023
Filed — Alteration
Removal of non bearing partition and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M00848022-I1
03/29/2023
Permit issued — Sidewalk Shed
M00846910-I1-SH
03/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedCasino Development Group09/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/21/2026
DOB NOWStandpipePermit IssuedDemar Plumbing09/18/2026
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold09/15/2026
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold07/29/2026
DOB NOWStructuralPermit IssuedTitanium Construction Services07/23/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCasino Development Group07/22/2026
DOB NOWGeneral ConstructionPermit IssuedTitanium Construction Services07/20/2026
DOB NOWMechanical SystemsPermit IssuedTitanium Construction Services07/17/2026
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold06/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedEcd NY06/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedEcd NY06/04/2026
DOB NOWFoundationPermit IssuedTitanium Construction Services05/13/2026
DOB NOWFoundationPermit IssuedTitanium Construction Services12/22/2025
DOB NOWSupport of ExcavationPermit IssuedTitanium Construction Services12/19/2025
DOB NOWPlumbingPermit IssuedDemar Plumbing11/12/2025
DOB NOWFoundationPermit IssuedTitanium Construction Services11/12/2025
DOB NOWSupport of ExcavationPermit IssuedTitanium Construction Services11/06/2025
DOB NOWConstruction FencePermit IssuedEcd NY08/08/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/03/2025
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY12/16/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPlatinum Services NY12/16/2024
DOB NOWGeneral ConstructionPermit IssuedNortheast Specialist Group05/10/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/04/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/29/2023
1 project · most recent 07/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Permit IssuedTitanium Construction ServicesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
York YMAE0035 66 tons · Heat Pump Outdoor ×5
— CXW-15, R513A 315,400 BTU ×1
Ventilation
Aaon RN185 8,235 CFM ×2
RN185D70 3,815 CFM ×1
Samsung AM048TXMDCH/AA 48,000 BTU · Vrf Outdoor ×1
SM048TXMDCH/AA 48,000 BTU · Vrf Outdoor ×1
1 project · most recent 07/09/2026
Water/Sanitary
FiledStatusContractorScope
07/09/2026Permit IssuedDemar PlumbingWater/Sanitary
8 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026Permit IssuedNash Electric Services—
06/25/2026Permit IssuedNash Electric Services—
02/09/2026Permit IssuedA & M Electrical Service1 meters, 1 new_meters
11/19/2025Permit IssuedA & M Electrical ServiceGeneral Wiring
12/13/2024Permit IssuedTitanium ElectricalGeneral Wiring
03/21/2023Permit IssuedIlluminous ElectricGeneral Wiring
11/19/2019Permit IssuedP&H Electric D/B/A Mage ElectricGeneral Wiring
08/22/2018Permit IssuedVerde ElectricGeneral Wiring
1 project · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedDemar Plumbing1 scope_items
1 project · most recent 09/18/2026
Fence Sidewalk Shed
FiledStatusContractorScope
09/18/2026Permit IssuedS&E Bridge & ScaffoldFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/02/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/02/2026Pass-Final PL - UndergroundPassView ↗
06/24/2026Pass-Final PL - UndergroundPassView ↗
06/09/2026Pass-Final PL - UndergroundPassView ↗
05/14/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
01/30/2026Excavations - Sheeting, Shoring, and BracingMAXIM KORNGOLDspecial
01/30/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
01/30/2026Construction Operations Influencing Adjacent StructuresMAXIM KORNGOLDspecial
01/30/2026Underpinning and alternate methods of support of buildings and adjacent propertyMAXIM KORNGOLDspecial
01/20/2026Standpipe SystemsMaxim Korngoldspecial
08/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMAXIM KORNGOLDspecial
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
10/04/2026M01436794-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
10/01/2026M01436794-I1Open ↗