← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
8 WEST 65 STREET
MANHATTAN · BIN 1028146
💬 Discuss this project
1983Year Built
6.5Stories
RMBuilding Class
R10AZoning
10,519 sfGross Floor Area
12Units
Rent Stabilized7 Open Violations ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 8 W 65 ST CONDOMINIUM · 2,511 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SYNOPTIC MANAGEMENT407/08/2026
468 WEST 23RD STREET307/08/2026
30 W 90TH ST CONDO807/08/2026
210 EQUITES CORP.903/22/2026
8 W 65 ST CONDOMINIUM503/22/2026
8 W 65 STREET CONDOMIN103/22/2026
8 WEST 65TH STREET CONDOMINIUN503/22/2026
321 EAST 45TH STREET OWNERS203/21/2026
METROPOLIS DEVELOPMENT603/21/2026
CANIDO BASONAS CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.104/12/2023
NEW YORK ENGINEERING ASSOC., P.C.810/18/2022
BAILEYS ENGINEERING PC111/07/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C1603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
ARCO PLBG AND HTG INCPlumbing307/08/2026
BENJAMIN DREBINElectrical203/21/2026
ACME AWNING CO. INCGeneral Contractor107/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818104/12/2023
NEW YORK ENGINEERING ASSO851810/18/2022
Building Lifecycle
All (116)Filed (10)Permit Issued (7)Signed Off (6)Violation (60)Inspection (5)Special Inspection (28)
04/29/2026
Violation issued (HPD, closed)
A
03/14/2026
Violation issued (HPD, open)
C
03/14/2026
Violation issued (HPD, open)
B
03/14/2026
Violation issued (HPD, open)
C
05/08/2025
Violation issued (HPD, open)
C
01/04/2025
Violation issued (HPD, closed)
C
01/04/2025
Violation issued (HPD, open)
C
04/01/2024
Violation issued (HPD, closed)
A
05/01/2023
Signed off — Alteration
M00851822-I1
04/25/2023
Permit issued — General Construction
M00851822-I1-GC
04/12/2023
Filed — Alteration
M00851822-I1
04/12/2023
Special inspection requirement — Final
Jose Pena
03/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/16/2023
Violation issued (HPD, closed)
A
12/06/2022
Signed off — Alteration
REFILE LAA #110564853 FOR REPLACEMENT GAS BOILER AND REGISTER DOMESTIC HOT WATER BOILER. REGISTER GAS DRYERS AND INSTALL FIRE SPRINKLER HEAD OFF EXISTING DOMESTIC WATER SUPPLY.
M00648727-I1
12/06/2022
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILER. REGISTER DOMESTIC HOT WATER BOILER AND GAS DRYERS. Filing for installation primary backflow prevention assembly to supersede LAA #140362747
M00648643-I1
12/06/2022
Signed off — Alteration
REFILE LAA #110564853 FOR REPLACEMENT GAS BOILER AND REGISTER DOMESTIC HOT WATER BOILER. REGISTER GAS DRYERS AND INSTALL FIRE SPRINKLER HEAD OFF EXISTING DOMESTIC WATER SUPPLY.
M00648727-S1
11/15/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/18/2022
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILER. REGISTER DOMESTIC HOT WATER BOILER AND GAS DRYERS. Filing for installation primary backflow prevention assembly to supersede LAA #140362747
M00648643-P3
10/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2022
Permit issued — Boiler Equipment
M00648727-S1-BE
08/11/2022
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILER. REGISTER DOMESTIC HOT WATER BOILER AND GAS DRYERS. Filing for installation primary backflow prevention assembly to supersede LAA #140362747
M00648643-P2
08/08/2022
Filed — Alteration
REFILE LAA #110564853 FOR REPLACEMENT GAS BOILER AND REGISTER DOMESTIC HOT WATER BOILER. REGISTER GAS DRYERS AND INSTALL FIRE SPRINKLER HEAD OFF EXISTING DOMESTIC WATER SUPPLY.
M00648727-S1
07/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
07/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
07/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
07/27/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
07/27/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
07/11/2022
Signed off — Alteration
INSTALL NEW CHIMNEY
M00648674-I1
06/28/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
05/19/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
04/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
04/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/26/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
04/25/2022
Filed — Alteration
REFILE LAA #110564853 FOR REPLACEMENT GAS BOILER AND REGISTER DOMESTIC HOT WATER BOILER. REGISTER GAS DRYERS AND INSTALL FIRE SPRINKLER HEAD OFF EXISTING DOMESTIC WATER SUPPLY.
M00648727-P1
04/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
04/14/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
04/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/14/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/24/2022
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILER. REGISTER DOMESTIC HOT WATER BOILER AND GAS DRYERS. Filing for installation primary backflow prevention assembly to supersede LAA #140362747
M00648643-P1
02/16/2022
Violation issued (HPD, closed)
A
02/09/2022
Permit issued — Plumbing
M00648643-I1-PL
02/09/2022
Permit issued — Mechanical Systems
M00648674-I1-MS
02/09/2022
Permit issued — Boiler Equipment
M00648727-I1-BE
02/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
01/24/2022
Filed — Alteration
REFILE LAA #110564853 FOR REPLACEMENT GAS BOILER AND REGISTER DOMESTIC HOT WATER BOILER. REGISTER GAS DRYERS AND INSTALL FIRE SPRINKLER HEAD OFF EXISTING DOMESTIC WATER SUPPLY.
M00648727-I1
01/24/2022
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILER. REGISTER DOMESTIC HOT WATER BOILER AND GAS DRYERS. Filing for installation primary backflow prevention assembly to supersede LAA #140362747
M00648643-I1
01/24/2022
Filed — Alteration
INSTALL NEW CHIMNEY
M00648674-I1
12/15/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
12/15/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
12/15/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offACME AWNING CO. INC04/25/2023
DOB NOWBoiler EquipmentSigned-offARCO PLBG AND HTG INC08/15/2022
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC02/09/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME02/09/2022
DOB NOWBoiler EquipmentSigned-offARCO PLBG AND HTG INC02/09/2022
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/21/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/08/2017
BISPLISSUEDGLENNS PLUMBING SVCS INC03/23/2022
BISEQISSUEDEVEREST SCAFFOLDING INC11/08/2017
BISEQISSUEDCANIDO BASONAS CONSTRUCTI05/02/2017
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/11/2017
BISEQISSUEDEVEREST SCAFFOLDING INC11/17/2016
BISPLISSUEDPLUMBING & HTG DOCTOR INC02/19/2016
BIS—ISSUEDAMG DESIGN AND CONTRACTIN02/11/2016
BISEQISSUEDEVEREST SCAFFOLDING INC11/17/2015
BISOTISSUEDPREFEERED RENOVATION CORP01/28/2015
BISPLISSUEDPLBG P & H INC12/16/2014
BISOTISSUEDPREFEERED RENOVATION CORP11/10/2014
BISPLISSUEDPP COUSIN INC08/14/2014
BISOTISSUEDONE WORLD BUILDERS LLC08/07/2014
BISOTISSUEDSKYLINE RESTORATION INC05/29/2007
BISEQISSUEDCOLGATE SCAFFOLDING EQUIPMENT CO03/18/2005
BISEQISSUEDCOLGATE SCAFFOLDING AND EQUIP CO03/18/2005
BISOTISSUEDEPIC BUILDING RESTORATION09/16/2004
BISEQISSUEDCOLGATE SCAFFOLDING AND EQUIP CO04/07/2004
BISOTISSUEDEPIC BUILDING RESTORATION12/15/2003
BISEQISSUEDCOLGATE SCAFFOLDING AND EQUIP CO05/16/2003
BISEQISSUEDCOLGATE SCAFFOLDING EQUIPMENT CO04/18/2003
BISOTISSUEDEPIC RESTORATION AND RENOVATION06/23/2000
BISPLISSUEDBAY RIDGE MECHANICAL CORP.07/15/1998
BISOTISSUEDT & L GENERAL CONTRACTING INC06/25/1998
2 projects · most recent 06/21/2023
General Wiring
FiledStatusContractorScope
06/21/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
05/10/2023CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/19/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/12/2023FinalJose Penaprogress
03/29/2023Tenant Protection Plan ComplianceNORMAN LOKspecial
10/19/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
07/27/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/27/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/27/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/27/2022Maintenance informationLOUIS ARENAenergy_progress
07/27/2022Heating SystemsLOUIS ARENAspecial
06/28/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
04/26/2022Maintenance informationLOUIS ARENAenergy_progress
04/26/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/26/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/26/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
04/26/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/26/2022Heating SystemsLOUIS ARENAspecial
04/14/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/14/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
04/14/2022Heating SystemsLOUIS ARENAspecial
04/14/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/14/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/14/2022Maintenance informationLOUIS ARENAenergy_progress
02/09/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
12/15/2021Heating SystemsLOUIS ARENAspecial
12/15/2021Mechanical SystemsLOUIS ARENAspecial
12/15/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
Latest 25 of 28.
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/06/2026M00001087-I1Request digital key ↗
09/03/2026M00648674-I1Request digital key ↗
09/02/2026M00648643-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION26
08/29/2023122512487Open ↗
03/17/2023122512487Open ↗
10/25/2022104782530Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION12
03/23/2022121712129Open ↗
11/09/2017140429025Open ↗
05/09/2017123089834Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/18/2016122512487Open ↗
▸Seals & Professional Certifications61
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
07/23/2018103456788Open ↗
07/23/2018103251570Open ↗
05/25/2018140429025Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00648727-S1Open ↗
09/23/2026M00648727-I1Open ↗
09/23/2026M00648727-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M00648727-S1Open ↗
09/23/2026M00648727-I1Open ↗
09/23/2026M00648727-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/02/2026M00648643-I1Open ↗
09/02/2026M00648643-P1Open ↗
09/02/2026M00648643-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/05/2017123089834Open ↗
11/12/2014122191270Open ↗
06/16/2009120072090Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/05/2017123089834Open ↗
11/13/2015140429025Open ↗
11/12/2014122191270Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/13/2015140429025Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/13/2015140429025Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/16/2009120072090Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/11/2015122512487Open ↗
01/16/2015122191270Open ↗
11/12/2014122191270Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/25/2015121712129Open ↗
01/30/2015122191270Open ↗
▸BISSCHEDULE B - PLUMBING2
01/19/2022121712129Open ↗
08/01/2014121712129Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/13/2023122512487Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
05/05/2017123089834Open ↗
03/08/2017123038818Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/18/2016122512487Open ↗
▸BISSTREET TREE CHECKLIST1
09/11/2015122512487Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/02/2026M00648643-I1Open ↗
09/02/2026M00648643-P1Open ↗
09/02/2026M00648643-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/08/2017123038818Open ↗
09/11/2015122512487Open ↗
11/12/2014122191270Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/16/2009120072090Open ↗
05/21/2008110174472Open ↗
▸Energy Compliance24
▸BISAS-BUILT ENERGY ANALYSIS5
05/08/2023122512487Open ↗
05/10/2018123038818Open ↗
09/15/2017122512487Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/10/2018123038818Open ↗
03/08/2017123038818Open ↗
05/24/2016122191270Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/19/2022121712129Open ↗
01/05/2022121712129Open ↗
12/23/2021121712129Open ↗
▸BISINTERIOR LIGHTING POWER2
06/30/2022121712129Open ↗
06/30/2022121712129Open ↗
▸BISTR8: Energy Code Progress Inspections2
11/12/2014122191270Open ↗
08/01/2014121712129Open ↗
▸BISLIGHTING CONTROLS2
06/30/2022121712129Open ↗
06/30/2022121712129Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00648727-S1Open ↗
08/13/2026M00648727-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/30/2022121712129Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/13/2015140429025Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00648727-S1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/19/2022121712129Open ↗
01/05/2022121712129Open ↗
12/23/2021121712129Open ↗
Showing 3 of 4 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
10/14/2022104782530Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/30/2022121712129Open ↗
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
10/24/2022104782530Open ↗
07/05/2022121712129Open ↗
01/19/2021122512487Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
08/29/2023122512487Open ↗
08/27/2018122512487Open ↗
08/27/2018122512487Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/09/2017140429025Open ↗
11/09/2017140429025Open ↗
12/05/2016140429025Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/16/2009120072090Open ↗
05/21/2008110174472Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
05/10/2018123038818Open ↗
▸BISSUPERSEDING LETTER1
03/23/2022121712129Open ↗
▸BISFINAL1
06/30/2022121712129Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
05/08/2023122512487Open ↗
01/18/2023122512487Open ↗
03/08/2017123038818Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/14/2022104782530Open ↗
06/30/2022121712129Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
02/18/2016122512487Open ↗
▸Filing & Intake Forms36
▸BISBOROUGH INTAKE FORM25
03/23/2022121712129Open ↗
03/19/2020122512487Open ↗
03/06/2020122512487Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET7
05/05/2017123089834Open ↗
03/08/2017123038818Open ↗
09/11/2015122512487Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
08/04/2017123089834Open ↗
07/13/2017123089834Open ↗
02/18/2016122512487Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/13/2015140429025Open ↗
▸Other Documents2
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
11/13/2015140429025Open ↗
▸BISPLOT DIAGRAM1
09/11/2015122512487Open ↗