← Back
Miscellaneous two family
8 WEST 83 STREET
MANHATTAN · BIN 1031184
💬 Discuss this project
1882Year Built
3Stories
B9Building Class
R8BZoning
3,600 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,533 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 317p · 1 filing · 12 docs
Floor 215p · 1 filing · 12 docs
Floor 115p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOURCE CONSTRUCTION MANAGEMENT503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2016$562K—Private party → Private party$156/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STARTECH ENGINEERING P.C.109/30/2024
MJ ENGINEERING & DESIGN102/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOURCE CONSTRUCTION MANAGGeneral Contractor303/21/2026
F & F ELECTRICAL CORP.Electrical103/22/2026
PATH MECHANICAL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STARTECH ENGINEERING P.C.1041109/30/2024
MJ ENGINEERING & DESIGN5546102/24/2023
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (1)Violation (3)Special Inspection (6)
10/01/2024
Permit issued — Mechanical Systems
M01101342-I1-MS
09/30/2024
Filed — Alteration
Installation of AC units.
M01101342-I1
08/23/2024
Special inspection requirement — Mechanical Systems
FLORENTIN POPESCU
08/23/2024
Special inspection requirement — Final
FLORENTIN POPESCU
10/27/2023
Signed off — Alteration
REMOVE THE REAR DOOR AND REPLACE IT WITH A NEW DOOR AND WINDOW, THE OPENING AT THE REAR FACADE AT THE BASEMENT LEVEL.
M00814786-I1
03/06/2023
Permit issued — General Construction
M00814786-I1-GC
02/24/2023
Filed — Alteration
REMOVE THE REAR DOOR AND REPLACE IT WITH A NEW DOOR AND WINDOW, THE OPENING AT THE REAR FACADE AT THE BASEMENT LEVEL.
M00814786-I1
02/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
Magdy Youssef
02/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
02/07/2023
Special inspection requirement — Final
Magdy Youssef
01/19/2023
Special inspection requirement — Masonry
Magdy Youssef
12/08/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/08/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/08/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPATH MECHANICAL CORP10/01/2024
DOB NOWGeneral ConstructionSigned-offSOURCE CONSTRUCTION MANAG03/06/2023
1 project · most recent 09/30/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/30/2024Permit IssuedPATH MECHANICAL CORPAir Conditioning Systems
Cooling
Lg ARNU153CEU4, ARNU243NJA4, 39,000 BTU · Vrf Indoor ×4
ARNU153SJS4, ARNU153MAA4 30,000 BTU · Vrf Indoor ×4
ARNU183MAA4, ARNU183MAA4 36,000 BTU · Vrf Indoor ×4
ARUN060GSS4, ARUN060GSS4 60,000 BTU · Vrf Outdoor ×4
ARNU183V1A4 18,300 BTU · Vrf Indoor ×2
2 projects · most recent 01/22/2025
General Wiring
FiledStatusContractorScope
01/22/2025CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
05/06/2024CompleteF & F ELECTRICAL CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/23/2024Mechanical SystemsFLORENTIN POPESCUspecial
08/23/2024FinalFLORENTIN POPESCUprogress
02/17/2023Tenant Protection Plan ComplianceMagdy Youssefspecial
02/07/2023Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
02/07/2023FinalMagdy Youssefprogress
01/19/2023MasonryMagdy Youssefspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026M00814786-I1Request digital key ↗
08/26/2026M01101342-P1Request digital key ↗
08/26/2026M01101342-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M01101342-I1Open ↗
08/13/2026M01101342-P1Open ↗
08/13/2026M00814786-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/10/2026M00814786-I1Open ↗
08/27/2026M01101342-I1Open ↗
08/25/2026M01101342-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026M00814786-I1Open ↗
08/13/2026M01101342-P1Open ↗
08/13/2026M01101342-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/10/2026M00814786-I1Open ↗
08/27/2026M01101342-I1Open ↗
08/25/2026M01101342-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00814786-I1Open ↗
08/13/2026M01101342-P1Open ↗
08/13/2026M01101342-I1Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026M00814786-I1Open ↗