Two stories - detached, small or mid-size
80-10 192 STREET
QUEENS · Jamaica Estates-Holliswood · BIN 4156368
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
2,400 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: NS PLANNING TRUST, DATED APRIL 29, 2025 · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction36p · 1 filing · 20 docs
Floor 1Under Construction35p · 1 filing · 20 docs
CellarUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINSTON CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS606/08/2026
NYC SPECIAL CONTRACTORS306/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
GERALD J CALIENDO R A P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RECORD GROUP INCGeneral Contractor307/08/2026
IMPACT BUILDERS CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519806/08/2026
WORLD DESIGN ARCHITECTURE9323506/08/2026
Building Lifecycle
All (75)Filed (9)Permit Issued (5)Violation (10)Inspection (1)Objection (20)Special Inspection (30)
08/24/2026
Special inspection requirement — Mechanical Systems
William Alicea
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
08/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
08/24/2026
Special inspection requirement — Structural Wood Frame
William Alicea
08/24/2026
Special inspection requirement — Final
William Alicea
08/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
08/24/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/14/2026
Objection resolved — Addressed
07/12/2026
Objection raised — Other
06/10/2026
Objection raised — Other
06/10/2026
Objection resolved — Addressed
06/08/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P5
06/08/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P6
06/08/2026
Special inspection requirement — Insulation placement and R values
William Alicea
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
06/08/2026
Special inspection requirement — Final
William Alicea
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
06/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/08/2026
Special inspection requirement — Mechanical Systems
William Alicea
06/08/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
06/08/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
06/08/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
06/08/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
06/08/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
06/08/2026
Special inspection requirement — Structural Wood Frame
William Alicea
06/08/2026
Special inspection requirement — Exterior lighting power
William Alicea
06/08/2026
Special inspection requirement — Interior lighting power
William Alicea
05/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2026
Permit issued — Construction Fence
Q01167934-I1-FN
04/21/2026
Permit issued — Structural
Q01168005-I1-GC-CX
03/16/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P4
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/25/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P3
02/25/2026
Objection raised — Admin
02/25/2026
Objection raised — Admin
02/10/2026
Permit issued — General Construction
Q01168005-S3-GC-CX
01/07/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Zoning
12/19/2025
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P2
10/03/2025
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-S3
08/06/2025
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO ERECT INTERIOR PARTITIONS, TO OBTAIN AN LOC NO CHANGE TO USE OCC OR EGRESS.
Q01168005-P1
05/13/2025
Permit issued — Construction Fence
Q01167934-I1-FN
05/07/2025
Permit issued — Mechanical Systems
Q01168005-I1-GC-CX
03/11/2025
Objection resolved — Addressed
02/23/2025
Objection resolved — Addressed
02/23/2025
Objection resolved — Addressed
02/23/2025
Objection resolved — Addressed
02/21/2025
Objection raised — Zoning
02/04/2025
Objection resolved — Addressed
02/03/2025
Objection raised — Zoning
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedIMPACT BUILDERS CORP04/21/2026
DOB NOWStructuralPermit IssuedRECORD GROUP INC04/21/2026
DOB NOWGeneral ConstructionPermit IssuedRECORD GROUP INC02/10/2026
DOB NOWConstruction FencePermit IssuedIMPACT BUILDERS CORP05/13/2025
DOB NOWMechanical SystemsPermit IssuedRECORD GROUP INC05/07/2025
BISMHISSUEDCITISCAPE CONSTRUCTION GROUP10/20/2008
BISEQISSUEDMYNM CONSTRUCTION INC08/29/2008
BISPLISSUEDGREGG NY PLUMBING, INC04/18/2008
BISOTISSUEDWIN STON CONSTRUCTION INC03/14/2008
1 project · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedDAVRY ELECTRIC INCGeneral Wiring
1 project · most recent 06/08/2026
Wood
FiledStatusContractorScope
06/08/2026Permit IssuedRECORD GROUP INCWood
1 project · most recent 01/16/2025
Fence
FiledStatusContractorScope
01/16/2025Permit IssuedIMPACT BUILDERS CORPFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
08/24/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
08/24/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
08/24/2026Subgrade InspectionsYounes Abouyaalaspecial
08/24/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
08/24/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
08/24/2026Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
08/24/2026Mechanical SystemsWilliam Aliceaspecial
08/24/2026FinalWilliam Aliceaprogress
08/24/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
08/24/2026Structural Wood FrameWilliam Aliceaprogress
06/08/2026Interior lighting powerWilliam Aliceaenergy_progress
06/08/2026Footing and FoundationYounes Abouyaalaprogress
06/08/2026Subgrade InspectionsYounes Abouyaalaspecial
06/08/2026FinalNAVEEN KUMARprogress
06/08/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/08/2026Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
06/08/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
06/08/2026Mechanical SystemsWilliam Aliceaspecial
06/08/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
06/08/2026Subgrade InspectionsYounes Abouyaalaspecial
06/08/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
06/08/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
06/08/2026FinalWilliam Aliceaprogress
06/08/2026Structural Wood FrameWilliam Aliceaprogress
06/08/2026Exterior lighting powerWilliam Aliceaenergy_progress
Latest 25 of 67.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026Q01167934-I1Request digital key ↗
08/16/2026Q01168005-P1Request digital key ↗
08/16/2026Q01168005-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
12/14/2022401511299Open ↗
03/18/2009410050947Open ↗
11/28/2008410050947Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
10/20/2008410050947Open ↗
08/29/2008410097194Open ↗
04/18/2008410050947Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram8
08/16/2026Q01168005-I1Open ↗
08/16/2026Q01168005-P2Open ↗
08/16/2026Q01168005-S3Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026Q01168005-P5Open ↗
08/27/2026Q01168005-P2Open ↗
08/27/2026Q01168005-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026Q01168005-P5Open ↗
09/01/2026Q01168005-P5Open ↗
08/27/2026Q01168005-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026Q01167934-I1Open ↗
08/16/2026Q01168005-P6Open ↗
08/16/2026Q01168005-P5Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/26/2008410097194Open ↗
04/15/2008410097194Open ↗
01/15/2008410050947Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
03/18/2009410050947Open ↗
11/28/2008410050947Open ↗
07/11/2008410050947Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/16/2026Q01168005-P2Open ↗
08/16/2026Q01168005-P1Open ↗
08/16/2026Q01168005-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/15/2008410050947Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/15/2008410097194Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/16/2026Q01168005-I1Open ↗
08/16/2026Q01168005-P2Open ↗
08/16/2026Q01168005-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026Q01168005-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01168005-S3Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
04/15/2008410097194Open ↗
03/13/2008410050947Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/26/2008410097194Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/18/2008410050947Open ↗
03/14/2008410050947Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/15/2008410097194Open ↗
▸Other Documents24
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/16/2026Q01168005-S3Open ↗
08/16/2026Q01168005-I1Open ↗
08/16/2026Q01168005-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlot Diagram8
08/16/2026Q01168005-P1Open ↗
08/16/2026Q01168005-P2Open ↗
08/16/2026Q01168005-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/16/2026Q01168005-P2Open ↗
08/16/2026Q01168005-S3Open ↗
08/16/2026Q01168005-P1Open ↗
Showing 3 of 8 on file for this type