ECB11/29/200850A/50B/fucton v.t. Ber, 10HP, HB44031,gas fd,1983 50(a)section of feed water incet header corroded near boiler joint.replace defective piping.50(b)partial dislocation of flue pipe.re-connect joint & secure.Nothing owed — awaiting certificate of correction
ECB05/08/200718A/18B/38/.38-introduce fresh air directly to boiler room.Nothing owed — awaiting certificate of correction
Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB06/30/2023Violation issued-failure to file 2021 internal hgh pressure inspectionAnswered on the city's records: a 2021 boiler inspection report was accepted (Jun 18, 2021)
DOB06/20/2023Violation issued-failure to file 2018 internal hgh pressure inspectionAnswered on the city's records: a 2018 boiler inspection report was accepted (Jun 25, 2018)
DOB06/20/2023Violation issued-failure to file 2019 external hgh pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB06/20/2023Violation issued-failure to file 2019 internal hgh pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB04/25/2023Violation issued-failure to file 2022 internal high pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB04/25/2023Violation issued-failure to file 2022 external high pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB03/16/2020Violation issued - failure to file 2017 internal high pressure boiler inspectionAnswered on the city's records: a 2017 boiler inspection report was accepted (Jan 11, 2017)