Two stories - detached, small or mid-size
80-12 212 STREET
QUEENS · BIN 4164641
💬 Discuss this project
1955Year Built
2.5Stories
A1Building Class
R2AZoning
1,929 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof13p · 1 filing · 20 docs
Floor 2Under Construction94p · 2 filings · 20 docs
Floor 1Under Construction94p · 2 filings · 20 docs
CellarUnder Construction63p · 1 filing · 20 docs
Sub-BasementUnder Construction37p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN GATE BAPAZ CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABBY SUCKLE ARCHITECT PC806/04/2026
GILSANZ MURRAY STEFICEK LLP308/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOD CONSULTANTS LLCGeneral Contractor704/09/2026
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor507/08/2026
RONEY ELECTRIC INCElectrical103/22/2026
KISHAN PLUMBING INCPlumbing106/28/2026
PLBG P & H INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191106/04/2026
Building Lifecycle
All (63)Filed (11)Permit Issued (8)Inspection (8)Objection (6)Special Inspection (30)
06/24/2026
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/24/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
06/04/2026
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P6
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
05/06/2026
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
02/20/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/17/2025
Permit issued — Plumbing
Q00567295-S1-PL
09/29/2025
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P5
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/03/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
09/03/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
06/27/2025
Permit issued — Mechanical Systems
Q00567295-I1-GC
03/28/2025
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P4
03/03/2025
Special inspection requirement — Final
NAVEEN KUMAR
03/03/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
03/03/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
03/03/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/03/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/28/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
09/04/2024
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P3
08/29/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/29/2024
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
05/13/2024
Objection raised — Scope
05/13/2024
Objection raised — Other
05/06/2024
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P2
04/16/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/16/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/16/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/16/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/16/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
03/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/11/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/14/2022
Permit issued — Mechanical Systems
Q00567295-I1-GC
11/14/2022
Permit issued — Structural
Q00574061-I1-ST
09/30/2022
Permit issued — Plumbing
Q00567295-S1-PL
09/27/2022
Objection resolved — Addressed
09/21/2022
Objection raised — Other
09/19/2022
Filed — Alteration CO
FILING HEREWITH FOR THE MODIFICATIONS OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES.
Q00567295-P1
09/09/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
09/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/07/2022
Permit issued — Structural
Q00574061-I1-ST
09/07/2022
Permit issued — Foundation
Q00574061-S1-FO
08/17/2022
Filed — Alteration
FILING HEREWITH FOR STRUCTURAL FRAMING
Q00574061-P1
08/10/2022
Permit issued — General Construction
Q00567295-I1-GC
11/04/2021
Filed — Alteration
FILING HEREWITH FOR STRUCTURAL FRAMING
Q00574061-S1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC11/17/2025
DOB NOWMechanical SystemsPermit IssuedMOD CONSULTANTS LLC06/27/2025
DOB NOWMechanical SystemsPermit IssuedMOD CONSULTANTS LLC11/14/2022
DOB NOWStructuralPermit IssuedMOD CONSULTANTS LLC11/14/2022
DOB NOWPlumbingPermit IssuedPLBG P & H INC09/30/2022
DOB NOWStructuralPermit IssuedGOLDEN GATE BAPAZ CONSTRU09/07/2022
DOB NOWFoundationPermit IssuedGOLDEN GATE BAPAZ CONSTRU09/07/2022
DOB NOWGeneral ConstructionPermit IssuedGOLDEN GATE BAPAZ CONSTRU08/10/2022
1 project · most recent 06/04/2026
Air Conditioning Systems
FiledStatusContractorScope
06/04/2026Permit IssuedMOD CONSULTANTS LLCAir Conditioning Systems
1 project · most recent 06/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/04/2026Permit IssuedKISHAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 06/29/2023
General Wiring
FiledStatusContractorScope
06/29/2023CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 08/17/2022
Steel Concrete Wood
FiledStatusContractorScope
08/17/2022Permit IssuedMOD CONSULTANTS LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/20/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/11/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
06/24/2026Post-installed AnchorsYounes Abouyaalaspecial
06/24/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/24/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
05/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
05/06/2026Post-installed AnchorsYounes Abouyaalaspecial
09/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
09/03/2025Post-installed AnchorsYounes Abouyaalaspecial
03/03/2025FinalNAVEEN KUMARprogress
03/03/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
03/03/2025Fenestration areasYounes Abouyaalaenergy_progress
03/03/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
03/03/2025Fenestration air leakageYounes Abouyaalaenergy_progress
03/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/03/2025Mechanical SystemsYounes Abouyaalaspecial
03/03/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/29/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
08/29/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/29/2024Post-installed AnchorsYounes Abouyaalaspecial
04/16/2024Fenestration air leakageYounes Abouyaalaenergy_progress
04/16/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/16/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/16/2024Mechanical SystemsYounes Abouyaalaspecial
04/16/2024FinalNAVEEN KUMARprogress
Latest 25 of 53.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00574061-S1Request digital key ↗
08/27/2026Q00574061-I1Request digital key ↗
08/27/2026Q00574061-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 16
08/16/2026Q00567295-P6Open ↗
08/13/2026Q00567295-P2Open ↗
08/13/2026Q00567295-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00567295-P4Open ↗
08/13/2026Q00567295-P2Open ↗
08/13/2026Q00567295-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026Q00574061-P1Open ↗
09/23/2026Q00574061-P1Open ↗
09/23/2026Q00574061-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026Q00574061-P1Open ↗
09/02/2026Q00567295-P4Open ↗
09/02/2026Q00567295-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00574061-I1Open ↗
08/16/2026Q00567295-P6Open ↗
08/13/2026Q00567295-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00567295-I1Open ↗
08/13/2026Q00567295-P4Open ↗
08/13/2026Q00567295-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00567295-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00574061-I1Open ↗
08/16/2026Q00567295-P6Open ↗
08/13/2026Q00574061-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00567295-I1Open ↗
▸Other Documents11
▸DOB NOWPlot Diagram4
08/13/2026Q00567295-P4Open ↗
08/13/2026Q00574061-S1Open ↗
08/13/2026Q00567295-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026Q00567295-P2Open ↗
08/13/2026Q00567295-I1Open ↗
08/13/2026Q00567295-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00567295-I1Open ↗
08/13/2026Q00567295-P4Open ↗
08/13/2026Q00567295-P2Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00567295-P1Open ↗