Large suburban residence
80-16 166 STREET
QUEENS · Pomonok-Electchester-Hillcrest · BIN 4152055
💬 Discuss this project
1970Year Built
2Stories
A3Building Class
R2AZoning
3,638 sfGross Floor Area
1Units
Large suburban residence · 5,340 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR111/13/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281111/13/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (4)
03/23/2026
Signed off — Alteration
installation of solar panels, rooftop, railed, grid-tied, 14 modules, 6.16 KW, 100 AMP FEEDER REPLACEMENT REQUIRED, (DC ): 6.16 KW SYSTEM SIZE (AC ): 4.06 KVA 14 MODULES: AXITEC-AC-440TGB (SAFE HARBOR MODULE: 0) 14 INVERTERS: ENPHASE IQ8PLUS-72-2-US
Q01318702-I1
11/21/2025
Permit issued — Solar
Q01318702-I1-SL
11/13/2025
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 14 modules, 6.16 KW, 100 AMP FEEDER REPLACEMENT REQUIRED, (DC ): 6.16 KW SYSTEM SIZE (AC ): 4.06 KVA 14 MODULES: AXITEC-AC-440TGB (SAFE HARBOR MODULE: 0) 14 INVERTERS: ENPHASE IQ8PLUS-72-2-US
Q01318702-I1
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
11/13/2025
Special inspection requirement — Final
Mina Makar
11/13/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR11/21/2025
1 project · most recent 12/18/2025
FiledStatusContractorScope
12/18/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/13/2025Fire-Resistant Penetrations and JointsMina Makarspecial
11/13/2025Energy Code Compliance InspectionsMina Makarprogress
11/13/2025FinalMina Makarprogress
11/13/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01318702-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01318702-I1Open ↗
08/31/2026Q01318702-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01318702-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026Q01318702-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01318702-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01318702-I1Open ↗