← Back
Two stories - detached, small or mid-size
80-23 189 STREET
QUEENS · BIN 4156360
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R2AZoning
1,951 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPMENT JC BROTHERS303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2022$1.1M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC1407/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68602003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JC BROTHERS DEVELOPMENTGeneral Contractor907/08/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor707/08/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
SB RENOVATION & MODELINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161307/16/2025
Building Lifecycle
All (127)Filed (14)Permit Issued (11)Signed Off (5)Violation (3)Inspection (12)Objection (52)Special Inspection (30)
09/12/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/12/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/12/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/12/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/12/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/12/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/12/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/12/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/12/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
09/12/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/12/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/12/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
09/12/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
09/12/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
09/12/2025
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/03/2025
Objection resolved — Addressed
08/27/2025
Objection raised — Other
08/27/2025
Objection raised — Other
08/27/2025
Objection resolved — Addressed
07/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A9
07/16/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/16/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/16/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/16/2025
Special inspection requirement — Air barrier — testing
Younes Abouyaala
07/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/27/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A8
04/11/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A7
04/10/2025
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-S1
03/13/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A6
03/06/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/30/2025
Permit issued — Plumbing
Q08054561-S1-PL
01/07/2025
Signed off — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q08053919-I1
11/08/2024
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-S4
10/23/2024
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-S3
10/03/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A5
10/03/2024
Filed — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-A4
06/06/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/14/2024
Permit issued — General Construction
Q08054561-I1-GC
02/14/2024
Permit issued — Construction Fence
Q08053919-I1-FN
02/14/2024
Permit issued — General Construction
Q08054561-I1-GC
01/26/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2023
Signed off — Alteration CO
HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING. TO DO INTERIOR RENOVATIONS. FOUNDATION AND STRUCTURAL WORK TYPE PART OF THIS APPLICATION, AND TO OBTAIN A NEW C OF O
Q08054561-S2
12/07/2023
Permit issued — Plumbing
Q08054561-S1-PL
08/29/2023
Violation issued (ECB, closed)
Construction
08/24/2023
Violation issued (ECB, closed)
Construction
08/24/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP01/30/2025
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP03/14/2024
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP02/14/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP02/14/2024
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP12/07/2023
DOB NOWSupport of ExcavationSigned-offJC BROTHERS DEVELOPMENT07/21/2023
DOB NOWStructuralSigned-offJC BROTHERS DEVELOPMENT07/21/2023
DOB NOWFoundationSigned-offJC BROTHERS DEVELOPMENT07/21/2023
DOB NOWGeneral ConstructionPermit IssuedJC BROTHERS DEVELOPMENT06/12/2023
DOB NOWConstruction FenceSigned-offJC BROTHERS DEVELOPMENT06/05/2023
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING04/19/2023
1 project · most recent 07/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/16/2025Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 01/03/2024
General Wiring
FiledStatusContractorScope
01/03/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 07/16/2025
Steel Concrete
FiledStatusContractorScope
07/16/2025Signed-offFOUR POINTS P & H CORPSteel, Concrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/06/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/06/2024Pass-Final PL - UndergroundPassView ↗
05/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2024Pass-Final PL - UndergroundPassView ↗
01/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
09/12/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/12/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/12/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/12/2025Subgrade InspectionsFAHAD FATEHspecial
09/12/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
09/12/2025Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
09/12/2025Permanent certificateFAHAD FATEHenergy_progress
09/12/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/12/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
09/12/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/12/2025Maintenance informationFAHAD FATEHenergy_progress
09/12/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/12/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/12/2025Air barrier — testing Younes Abouyaalaenergy_progress
09/12/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/12/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/12/2025Exterior lighting powerFAHAD FATEHenergy_progress
09/12/2025Interior lighting powerFAHAD FATEHenergy_progress
09/12/2025Fenestration areasFAHAD FATEHenergy_progress
09/12/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/12/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/12/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
09/12/2025Lighting controlsFAHAD FATEHenergy_progress
07/16/2025Interior lighting powerFAHAD FATEHenergy_progress
07/16/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
Latest 25 of 138.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/25/2026Q08053919-I1Request digital key ↗
08/24/2026Q08054561-A4Request digital key ↗
08/24/2026Q08054561-A5Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q08054561-A9Open ↗
08/13/2026Q08054561-A7Open ↗
08/13/2026Q08054561-A8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08054561-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature19
09/28/2026Q08054561-A8Open ↗
09/28/2026Q08054561-A8Open ↗
08/31/2026Q08054561-A7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/28/2026Q08054561-A8Open ↗
09/28/2026Q08054561-A8Open ↗
08/31/2026Q08054561-A7Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/25/2026Q08053919-I1Open ↗
08/24/2026Q08054561-A4Open ↗
08/24/2026Q08054561-A5Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026Q08054561-A7Open ↗
08/13/2026Q08054561-A9Open ↗
08/13/2026Q08054561-A5Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/24/2026Q08054561-A4Open ↗
08/24/2026Q08054561-A5Open ↗
08/24/2026Q08054561-A6Open ↗
Showing 3 of 13 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q08054561-S2Open ↗
08/13/2026Q08054561-S4Open ↗
▸Other Documents26
▸DOB NOWSite Survey: Initial7
08/13/2026Q08054561-I1Open ↗
08/13/2026Q08054561-I1Open ↗
08/13/2026Q08054561-A9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
08/13/2026Q08054561-A7Open ↗
08/13/2026Q08054561-I1Open ↗
08/13/2026Q08054561-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q08054561-I1Open ↗
08/13/2026Q08054561-A5Open ↗
08/13/2026Q08054561-A8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026Q08054561-A5Open ↗
08/24/2026Q08054561-A8Open ↗
08/24/2026Q08054561-A7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q08054561-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08054561-S2Open ↗