← Back
Court house
80-25 126 STREET
QUEENS · BIN 4458616
💬 Discuss this project
1957Year Built
8Stories
Z1Building Class
C4-4Zoning
596,475 sfGross Floor Area
1Units
LL97 Covered46 Open Violations 31 unresolved · 15 paperwork only ▸FISP: No Report Filed
Court house · Owner of record: NYC DEPARTMENT OF TRANSPORTATION · 295,860 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof3p · 2 filings · 20 docs
Penthouse4p · 5 filings · 20 docs
Floor 85p · 5 filings · 20 docs
Floor 71p · 2 filings · 12 docs
Floor 64p · 5 filings · 20 docs
Floor 56p · 5 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 36p · 5 filings · 20 docs
Floor 24p · 5 filings · 20 docs
Floor 15p · 6 filings · 20 docs
Mezzanine5p · 2 filings · 12 docs
Cellar6p · 5 filings · 20 docs
1 job · most recent 06/04/2026
Storm
FiledStatusContractorScope
06/04/2026Permit IssuedACTION&A1 PLBG AND HTG COStorm
5 jobs · most recent 03/22/2023
General Wiring
FiledStatusContractorScope
03/22/2023CompleteREDGRAVE ELECTL MAINTNCE—
09/02/2022CompleteJ.A. LEE ELEC SVCS LLC—
08/11/2022CompleteJ.A. LEE ELEC SVCS LLC—
03/22/2022CompleteEGG ELECTRIC INC.General Wiring
01/08/2021Permit IssuedGREEN POWER ELECTRIC CORP—
Building Lifecycle
All (211)Filed (39)Permit Issued (35)Signed Off (17)Facade (FISP) (6)Violation (60)Inspection (8)Objection (16)Special Inspection (30)
06/22/2026
Permit issued — Plumbing
Q01323390-S1-PL
06/17/2026
Permit issued — General Construction
Q01323390-I1-GC
06/12/2026
Special inspection requirement — Subgrade Inspections
GEORGE ANDERSEN
06/12/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/04/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P1
06/02/2026
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-P2
04/24/2026
Special inspection requirement — Subgrade Inspections
GEORGE ANDERSEN
04/24/2026
Special inspection requirement — Final
GEORGE ANDERSEN
04/16/2026
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S3
03/04/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/31/2025
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-I1
12/31/2025
Filed — Alteration
GC WORK RELATED TO CIVL PLUMBING WORK TO RE-ROUTE SEWER LINE AHEAD OF CONSTRUCTION.
Q01323390-S1
12/12/2025
Signed off — Alteration
Plumbing alterations at the cellar level for proposed replacement of ex. domestic water DCVA with new backflow prevention devices/assemblies and accessories; related work as per plans. No proposed change in building use, egress, or occupancy.
Q00766227-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S2
10/23/2025
Filed — Alteration
Plumbing alterations at the cellar level for proposed replacement of ex. domestic water DCVA with new backflow prevention devices/assemblies and accessories; related work as per plans. No proposed change in building use, egress, or occupancy.
Q00766227-P1
09/08/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S4
08/21/2025
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724416-I1
08/01/2025
Signed off — Alteration
MODIFICATION OF EXISTING WET STANDPIPE SYSTEM TO A DRY PRESSURIZED SYSTEM. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724797-I1
08/01/2025
Signed off — Alteration
REMOVAL OF SPRINKLER SYSTEM FROM FLOORS CELLAR, 001-008. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
Q00724758-I1
07/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 126-02 82ND AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00440016-I1
06/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY FLOOR SHORING POSTS IN ASSOCIATION WITH FULL BUILDING DEMOLITION. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION
Q00772773-I1
06/18/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-I1
06/11/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S1
05/12/2025
Signed off — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-S5
03/17/2025
Permit issued — General Construction
Q00701267-I1-GC
01/09/2025
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P6
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Exterior lighting power
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Interior lighting power
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Air barrier - visual inspection
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
11/20/2024
Permit issued — Plumbing
Q00766227-I1-PL
10/29/2024
Signed off — Alteration
Construction of timber debris chute, to lower demolition debris from slab opening on the top of bldg to 8th flr platform. Debris will be moved from 8th flr & will use existing elevator shafts as debris chutes onto 1st flr platform and load out offsite.
Q00753157-I1
10/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2024
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P5
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
Q00763025-I1
06/13/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGES IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Q00762519-I1
04/11/2024
Permit issued — Mechanical Systems
Q00701267-S2-MS
04/11/2024
Permit issued — General Construction
Q00701267-I1-GC
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2024
Signed off — Alteration
Q00762507-I1
01/05/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CONSTRUCTION HOIST TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
Q00762193-I1
01/05/2024
Violation issued (ECB, closed)
Unknown
01/05/2024
Violation issued (ECB, closed)
Construction
11/16/2023
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33
Q00763025-P1
11/14/2023
Permit issued — Plumbing
Q00766227-I1-PL
10/24/2023
Filed — Alteration
Site restoration, grading, and soil work at the ground floor for proposed construction of vehicular sally port. No change in building use, egress, or occupancy; existing street tress to remain and be protected.
Q00701267-P4
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/03/2023
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
10/03/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
Latest 60 of 211 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DCAS407/08/2026
NYC DEPARTMENT OF DESIGN CONSTR7307/08/2026
NYC DEPARTMENT OF CORRECTION907/08/2026
DEPARTMENT OF CORRECTIONS1703/22/2026
DEPT OF CORRECTIONS 0103/22/2026
STARR INDUSTRIES203/22/2026
DOC 60 0 0203/22/2026
QUEENS COUNTY COURT 0303/22/2026
DOC 60 0103/22/2026
DEPT.OF GENERAL SERVICE903/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC1603/21/2026
EXPEDITE DEM403/21/2026
ARCHETYPE CONSULTANTS2803/21/2026
ECC1803/21/2026
A1 EXPEDITING SERVICE CORP.303/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STARR INDUSTRIES LLCGeneral Contractor1307/08/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor1107/08/2026
PAL ENVIRONMENTAL SAFETYGeneral Contractor607/08/2026
PRIMA PAVING CORPGeneral Contractor607/08/2026
MANENGEERING BUREAU INCFire Protection407/08/2026
ALLIANCE PLUMBING CORPPlumbing207/08/2026
CARDOZA PLUMBING CORPPlumbing207/08/2026
VIALVA, JOSEPHElectrical103/21/2026
LEON D. DEMATTEIS CONSTGeneral Contractor107/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing106/28/2026
BECKER, CHARLESElectrical103/21/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
CARL WEISSElectrical103/21/2026
DEYI LINGElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
GERALD DALEYElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL1290206/04/2026
TECTONIC ENGINEERING CONS1061901/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC06/22/2026
DOB NOWGeneral ConstructionPermit IssuedLEON D. DEMATTEIS CONST06/17/2026
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION03/17/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE11/20/2024
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION04/11/2024
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION04/11/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE11/14/2023
DOB NOWStandpipeSigned-offMANENGEERING BUREAU INC08/16/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU INC08/16/2023
DOB NOWSidewalk ShedSigned-offSTARR INDUSTRIES LLC06/23/2023
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC06/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offSTARR INDUSTRIES LLC06/21/2023
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION05/01/2023
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION05/01/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP03/20/2023
DOB NOWStructuralSigned-offPAL ENVIRONMENTAL SAFETY02/15/2023
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY02/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offPAL ENVIRONMENTAL SAFETY12/02/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP08/29/2022
DOB NOWSprinklersSigned-offMANENGEERING BUREAU INC08/23/2022
DOB NOWStandpipeSigned-offMANENGEERING BUREAU INC08/23/2022
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP08/05/2022
DOB NOWGeneral ConstructionSigned-offPAL ENVIRONMENTAL SAFETY07/26/2022
DOB NOWSupport of ExcavationSigned-offPRIMA PAVING CORP07/12/2022
DOB NOWSupported ScaffoldSigned-offSTARR INDUSTRIES LLC06/30/2022
DOB NOWSidewalk ShedSigned-offSTARR INDUSTRIES LLC06/30/2022
DOB NOWProtection and Mechanical MethodsSigned-offSTARR INDUSTRIES LLC06/29/2022
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC06/29/2022
DOB NOWStructuralSigned-offPRIMA PAVING CORP06/03/2022
DOB NOWStructuralSigned-offPRIMA PAVING CORP06/03/2022
DOB NOWFoundationSigned-offHUNTER ROBERTS CONSTRUCTION06/02/2022
DOB NOWEarth WorkSigned-offPRIMA PAVING CORP05/23/2022
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION05/06/2022
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION04/25/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP12/24/2020
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY12/14/2023
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY11/28/2023
BIS—ISSUEDPAL ENVIRONMENTAL SAFETY04/24/2023
BISEQISSUEDPAL ENVIRONMENTAL SAFETY04/24/2023
BISOTISSUEDLANMARK GROUP INC10/21/2015
+ 45 more permits on file
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/04/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/28/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
06/12/2026Subgrade InspectionsGEORGE ANDERSENspecial
06/12/2026FinalGEORGE ANDERSENprogress
04/24/2026Subgrade InspectionsGEORGE ANDERSENspecial
04/24/2026FinalGEORGE ANDERSENprogress
01/09/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
01/09/2025FinalGEORGE GHEBRYALprogress
01/09/2025Exterior lighting powerGEORGE GHEBRYALenergy_progress
01/09/2025Maintenance informationGEORGE GHEBRYALenergy_progress
01/09/2025Interior lighting powerGEORGE GHEBRYALenergy_progress
01/09/2025Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
01/09/2025Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
01/09/2025Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
01/09/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/03/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/03/2023Mechanical SystemsGEORGE GHEBRYALspecial
10/03/2023Post-installed AnchorsGEORGE GHEBRYALspecial
10/03/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
10/03/2023FinalGEORGE GHEBRYALprogress
10/03/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
10/03/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
10/03/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
01/30/2023FinalKIRK CESARETTIprogress
01/25/2023Post-installed AnchorsGEORGE GHEBRYALspecial
11/02/2022Post-installed Anchors—special
11/02/2022Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
Latest 25 of 46.
▾Documents — 338 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch38
08/26/2026Q00701267-I1Request digital key ↗
08/26/2026Q00701267-S3Request digital key ↗
08/26/2026Q00701267-S4Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00440016-I1Request digital key ↗
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION19
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
07/19/2022421791449Open ↗
11/30/2020440603651Open ↗
09/12/2014420888971Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications107
▸DOB NOWDPL-1: Design Professional Seal & Signature39
08/26/2026Q00724758-P1Open ↗
08/26/2026Q00724758-P2Open ↗
08/26/2026Q00724758-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/18/2026Q00772773-I1Open ↗
09/01/2026Q00820669-I1Open ↗
09/01/2026Q01323390-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/18/2026Q00772773-I1Open ↗
09/01/2026Q00724758-P2Open ↗
09/01/2026Q01323390-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/22/2023421791449Open ↗
08/22/2023421791449Open ↗
11/18/2014420590088Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/25/2013420888971Open ↗
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
12/10/2008410202640Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/30/2020440603651Open ↗
09/25/2013420888971Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/30/2020440603651Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
09/25/2013420888971Open ↗
07/07/2012420590088Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
02/13/2014420590088Open ↗
11/13/2013420590088Open ↗
▸BISGAS CUT-OFF1
08/22/2023421791449Open ↗
▸BISSEWER CUT-OFF1
08/22/2023421791449Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/07/2012420590088Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/22/2023421791449Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/22/2023421791449Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
03/26/2014420888971Open ↗
11/10/2012420781130Open ↗
11/10/2012420781130Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026Q00724758-I1Open ↗
08/18/2026Q00766227-I1Open ↗
08/13/2026Q00724416-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/11/2010420139175Open ↗
12/30/2009420124118Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/22/2008410111720Open ↗
▸BISASBESTOS INSPECTION REPORT1
12/10/2008410202640Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/18/2014420590088Open ↗
01/14/2013420590088Open ↗
07/07/2012420590088Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00701267-I1Open ↗
08/13/2026Q00701267-S2Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISNYCECC ANALYSIS1
11/30/2020440603651Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/30/2020440603651Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00701267-S2Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/30/2020440603651Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
07/09/2012420590088Open ↗
▸Approvals, Objections & Sign-offs87
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter39
08/26/2026Q00724758-I1Open ↗
08/26/2026Q00724758-P1Open ↗
08/26/2026Q00724758-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/13/2026Q00766227-P1Open ↗
08/13/2026Q00766227-I1Open ↗
08/13/2026Q00701267-P1Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/29/2025421791449Open ↗
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
07/07/2012420590088Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026Q00766227-I1Open ↗
08/13/2026Q00701267-S3Open ↗
08/13/2026Q00701267-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/26/2026Q00724758-I1Open ↗
08/13/2026Q00724416-I1Open ↗
08/13/2026Q00724797-I1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/30/2020440603651Open ↗
▸BISSUPERSEDING LETTER1
04/23/2025421791449Open ↗
▸BISSHED LETTER1
09/18/2012420124118Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/22/2010410202640Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT7
11/30/2020440603651Open ↗
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
▸BISDEPT OF FINANCE VERIFICATION3
04/29/2025421791449Open ↗
08/22/2023421791449Open ↗
08/22/2023421791449Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET7
07/19/2022421791449Open ↗
09/25/2013420888971Open ↗
11/10/2012420781130Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
04/29/2025421791449Open ↗
04/23/2025421791449Open ↗
08/22/2023421791449Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/30/2020440603651Open ↗
▸Other Documents4
▸DOB NOWWaiver Document3
08/13/2026Q00724758-I1Open ↗
08/13/2026Q00724797-I1Open ↗
08/13/2026Q00724416-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
11/30/2020440603651Open ↗