Large suburban residence
80-28 LANGDALE STREET
QUEENS · Glen Oaks-Floral Park-New Hyde Park · BIN 4178351
💬 Discuss this project
1955Year Built
2.25Stories
A3Building Class
R2AZoning
3,732 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 7,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Roof1 filing · 8 docs
Attic10p · 1 filing · 20 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction17p · 3 filings · 20 docs
CellarUnder Construction14p · 2 filings · 20 docs
Site & exterior13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLARK CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2022$784K—UNLIMITED HOLDINGS INC → Private party$210/sf building
04/14/2022$590K—Private party → UNLIMITED HOLDINGS, INC.$158/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT708/11/2026
TOM PETERSEN ARCHITECT, LLC109/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLARK CONSTRUCTION CORPGeneral Contractor3007/08/2026
HUNT B CONSTRUCTION INCGeneral Contractor307/08/2026
BT'S PLUMBING AND HEATINGPlumbing207/08/2026
DENSITY H CONTRACTING CORGeneral Contractor107/08/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642808/11/2026
THOMAS PETERSEN ARCHITECT7854109/05/2025
Building Lifecycle
All (98)Filed (8)Permit Issued (18)Violation (1)Inspection (11)Objection (30)Special Inspection (30)
08/11/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURE AS PER DRAWING.
Q08052952-P1
06/24/2026
Objection resolved — Resolved
06/22/2026
Objection raised — Fire_Protection
06/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Addition and alteration of the existing one-family house as per drawings herewith filed to obtain c/o.
Q08052828-P4
06/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Structural Steel - Details
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Air barrier — testing
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
05/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Permit issued — Plumbing
Q08052952-I1-PL
01/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2025
Permit issued — Earth Work
Q08052828-I1-MS
09/11/2025
Permit issued — Solar
Q01282107-I1-SL
09/10/2025
Permit issued — Earth Work
Q08052828-I1-GC-CX
09/05/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01282107-I1
02/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/09/2025
Permit issued — Earth Work
Q08052828-I1-MS
01/09/2025
Permit issued — Foundation
Q08052828-I1-GC-CX
01/09/2025
Permit issued — Construction Fence
Q08052950-I1-FN
12/20/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Addition and alteration of the existing one-family house as per drawings herewith filed to obtain c/o.
Q08052828-P1
08/29/2024
Permit issued — Curb Cut
Q08052951-I1-CC
08/28/2024
Permit issued — Mechanical Systems
Q08052828-I1-MS
08/27/2024
Permit issued — Mechanical Systems
Q08052828-I1-GC-CX
08/27/2024
Permit issued — Construction Fence
Q08052950-I1-FN
07/30/2024
Permit issued — General Construction
Q08052828-I1-GC-CX
05/28/2024
Permit issued — Plumbing
Q08052952-I1-PL
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING02/13/2026
DOB NOWEarth WorkPermit IssuedHUNT B CONSTRUCTION INC09/12/2025
DOB NOWSolarPermit IssuedLONG ISLAND POWER SOLUTIO09/11/2025
DOB NOWEarth WorkPermit IssuedHUNT B CONSTRUCTION INC09/10/2025
DOB NOWEarth WorkPermit IssuedSKYLARK CONSTRUCTION CORP01/09/2025
DOB NOWFoundationPermit IssuedSKYLARK CONSTRUCTION CORP01/09/2025
DOB NOWConstruction FencePermit IssuedSKYLARK CONSTRUCTION CORP01/09/2025
DOB NOWCurb CutPermit IssuedSKYLARK CONSTRUCTION CORP08/29/2024
DOB NOWMechanical SystemsPermit IssuedSKYLARK CONSTRUCTION CORP08/28/2024
DOB NOWMechanical SystemsPermit IssuedSKYLARK CONSTRUCTION CORP08/27/2024
DOB NOWConstruction FencePermit IssuedSKYLARK CONSTRUCTION CORP08/27/2024
DOB NOWGeneral ConstructionPermit IssuedSKYLARK CONSTRUCTION CORP07/30/2024
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING05/28/2024
DOB NOWConstruction FencePermit IssuedSKYLARK CONSTRUCTION CORP11/27/2023
DOB NOWFoundationPermit IssuedSKYLARK CONSTRUCTION CORP11/15/2023
DOB NOWGeneral ConstructionPermit IssuedSKYLARK CONSTRUCTION CORP11/15/2023
DOB NOWStructuralPermit IssuedSKYLARK CONSTRUCTION CORP11/15/2023
DOB NOWConstruction FencePermit IssuedDENSITY H CONTRACTING COR05/10/2023
1 project · most recent 06/02/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedHUNT B CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman ASPT 49C14 5 tons · Ahu ×6
ASPT 39C14 3 tons · Ahu ×3
Heating
A.O. Smith GPVX 75L 75,000 BTU · Water Heater ×3
Ventilation
Greenheck SP-A50-90-VG-L-QD OR EQUAL 50 CFM · Exhaust Fan ×18
SP-A50-90-VG-L-QD W/ AUTOMATIC DAMPERS 100 CFM · Exhaust Fan ×3
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedBT'S PLUMBING AND HEATINGGas, Storm, Water/Sanitary
4 projects · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025CompleteCATIZONE ELECTRICAL INC—
10/03/2025Permit IssuedJD ELECTRICAL ENTERPRISESGeneral Wiring
09/03/2025CancelledCATIZONE ELECTRICAL INC—
05/15/2024Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 06/02/2026
Concrete Wood
FiledStatusContractorScope
06/02/2026Permit IssuedHUNT B CONSTRUCTION INCConcrete, Wood
1 project · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025Permit IssuedLONG ISLAND POWER SOLUTIO28 panels, 12.88 kw, 2,722 roof_area_sqft
1 project · most recent 06/02/2026
Earthwork
FiledStatusContractorScope
06/02/2026Permit IssuedHUNT B CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
06/02/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/02/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
06/02/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
06/02/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
06/01/2026MasonryMUZAFFAR JAMALspecial
06/01/2026Mechanical SystemsMUZAFFAR JAMALspecial
06/01/2026Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
06/01/2026Structural Steel - DetailsMUZAFFAR JAMALspecial
06/01/2026Subgrade InspectionsMUZAFFAR JAMALspecial
06/01/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/01/2026FinalTARIQ SIDDIQUIprogress
06/01/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
06/01/2026Footing and FoundationMUZAFFAR JAMALprogress
06/01/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
06/01/2026MeteringMUZAFFAR JAMALenergy_progress
06/01/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
06/01/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
06/01/2026Fenestration areasMUZAFFAR JAMALenergy_progress
06/01/2026Fenestration air leakageMUZAFFAR JAMALenergy_progress
06/01/2026Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
06/01/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
06/01/2026Permanent certificateMUZAFFAR JAMALenergy_progress
06/01/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
Latest 25 of 131.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q08052950-I1Request digital key ↗
08/23/2026Q08052951-I1Request digital key ↗
08/23/2026Q08052952-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
05/23/2024440814022Open ↗
05/21/2024440814022Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/14/2023440814022Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026Q08052828-P4Open ↗
08/13/2026Q08052828-I1Open ↗
08/13/2026Q08052828-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08052828-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026Q08052828-P4Open ↗
09/02/2026Q08052828-P4Open ↗
09/02/2026Q08052828-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026Q08052828-P4Open ↗
09/02/2026Q08052828-P4Open ↗
09/02/2026Q08052828-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q08052950-I1Open ↗
08/23/2026Q08052952-P1Open ↗
08/23/2026Q08052952-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/14/2023440814022Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2023440814022Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/15/2026Q08052828-P4Open ↗
08/13/2026Q08052828-P1Open ↗
08/13/2026Q08052828-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
05/23/2024440814022Open ↗
▸BISSTREET TREE CHECKLIST1
05/21/2024440814022Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08052828-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08052828-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/23/2026Q08052952-I1Open ↗
08/14/2026Q08052828-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01282107-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q08052828-P1Open ↗
08/13/2026Q08052828-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/14/2023440814022Open ↗
▸Approvals, Objections & Sign-offs1
▸BISDOB APPROVAL FOR NEW CC1
05/21/2024440814022Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/14/2023440814022Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/14/2023440814022Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026Q08052828-P4Open ↗
08/13/2026Q08052828-I1Open ↗
08/13/2026Q08052828-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q08052828-P1Open ↗
08/15/2026Q08052828-P4Open ↗
08/14/2026Q08052828-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/15/2026Q08052828-P4Open ↗
08/13/2026Q08052828-I1Open ↗
08/13/2026Q08052828-P1Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
05/21/2024440814022Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/21/2024440814022Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/21/2024440814022Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/14/2023440814022Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q08052828-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08052828-I1Open ↗