← Back
BuildNYC
Two stories - detached, small or mid-size
80-39 90TH AVENUE
QUEENS · Woodhaven · BIN 4623961
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3-1Zoning
1,488 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 7,300 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
StructuralEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Plumbing and appliance upgrades, cellar to 2nd floors1 filing · 2 docs
Floor 1Plumbing and appliance upgrades, cellar to 2nd floors2 filings · 11 docs
CellarPlumbing and appliance upgrades, cellar to 2nd floors1 filing · 2 docs
Filed — no permit issuedTemporary wood fence installation3p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2019$625K—Private party → Private party$420/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates409/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM Engineering Services603/21/2026
RP Development Group203/21/2026
Building Lifecycle
All (38)Filed (4)Objection (4)Special Inspection (30)
09/26/2022
Filed — New Building
New 2 stories 2 family dwelling. Cellar to be used as an accessory area to first floor dwelling with three piece bathroom.
Q00598586-S1
05/12/2022
Objection raised — Inspections
05/12/2022
Objection resolved — Addressed
05/11/2022
Filed — Alteration
INSTALLATION OF TEMPORARY WOOD FENCE ALONG PROPERTY 273LF
Q00733498-I1
04/08/2022
Objection raised — Admin
04/08/2022
Objection resolved — Addressed
03/30/2022
Filed — Alteration
FILED TO PROP. (1) SLOP SINK, (1) TUB, (1) TOILET, (1) LAVATORY, (1) WASHINE MACHINE, (1) GAS DRYER, (2) BOILERS, (2) HWHs, (1)AREA DRAIN, (2) FLOOR DRAIN AT CELLAR, (1) KITCHEN SINK, (2)TUBS, (2) LAVATORIES, (2)WATER CLOSETS & (1) RANGE AT 1ST& 2ND FLOOR
Q00628641-I1
03/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/11/2022
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
11/08/2021
Special inspection requirement — Electrical motors and elevators
11/02/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
11/02/2021
Special inspection requirement — Insulation placement and R values
11/02/2021
Special inspection requirement — Maintenance information
11/02/2021
Special inspection requirement — Metering
11/02/2021
Special inspection requirement — Interior lighting power
11/02/2021
Special inspection requirement — Fenestration air leakage
11/02/2021
Special inspection requirement — Permanent certificate
11/02/2021
Special inspection requirement — Lighting controls
11/02/2021
Special inspection requirement — Protection of exposed foundation insulation
11/02/2021
Special inspection requirement — Lighting in dwelling units
11/02/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
11/02/2021
Special inspection requirement — Fenestration areas
11/02/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
09/23/2021
Filed — New Building
New 2 stories 2 family dwelling. Cellar to be used as an accessory area to first floor dwelling with three piece bathroom.
Q00598586-I1
09/22/2021
Special inspection requirement — Air barrier continuity plan testing
09/22/2021
Special inspection requirement — Air barrier - visual inspection
09/22/2021
Special inspection requirement — Electric vehicle service equipment requirements
09/22/2021
Special inspection requirement — Exterior lighting power
09/22/2021
Special inspection requirement — Air barrier — testing
09/22/2021
Special inspection requirement — Concrete - Cast-In-Place
09/22/2021
Special inspection requirement — Concrete - Precast
09/22/2021
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/22/2021
Special inspection requirement — Masonry
09/22/2021
Special inspection requirement — Subgrade Inspections
09/22/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
09/22/2021
Special inspection requirement — Final
09/22/2021
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 03/30/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/30/2022——Gas, Storm, Water/Sanitary
1 project · most recent 09/26/2022
Wood
FiledStatusContractorScope
09/26/2022——Wood
1 project · most recent 05/11/2022
Fence
FiledStatusContractorScope
05/11/2022——Fence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/16/2022Fire-Resistant Penetrations and Joints—special
03/11/2022Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems—special
11/08/2021Electrical motors and elevators—energy_progress
11/02/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/02/2021Insulation placement and R values—energy_progress
11/02/2021Maintenance information—energy_progress
11/02/2021Metering—energy_progress
11/02/2021Interior lighting power—energy_progress
11/02/2021Fenestration air leakage—energy_progress
11/02/2021Permanent certificate—energy_progress
11/02/2021Lighting controls—energy_progress
11/02/2021Protection of exposed foundation insulation—energy_progress
11/02/2021Lighting in dwelling units—energy_progress
11/02/2021Fenestration and door U-factor and product ratings—energy_progress
11/02/2021Fenestration areas—energy_progress
11/02/2021HVAC-R and service water piping design and insulation—energy_progress
09/22/2021Air barrier continuity plan testing—energy_progress
09/22/2021Air barrier - visual inspection—energy_progress
09/22/2021Electric vehicle service equipment requirements—energy_progress
09/22/2021Exterior lighting power—energy_progress
09/22/2021Air barrier — testing —energy_progress
09/22/2021Concrete - Cast-In-Place—special
09/22/2021Concrete - Precast—special
09/22/2021Excavations - Sheeting, Shoring, and Bracing—special
09/22/2021Fire-Resistant Penetrations and Joints—special
Latest 25 of 33.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026Q00598586-S1Request digital key ↗
08/25/2026Q00598586-I1Request digital key ↗
08/15/2026Q00733498-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
12/06/2022440740619Open ↗
10/26/2022440740619Open ↗
09/23/2022440740619Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00598586-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026Q00598586-S1Open ↗
08/25/2026Q00598586-I1Open ↗
08/13/2026Q00628641-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/06/2022440740619Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/06/2022440740619Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
09/15/2022440740619Open ↗
▸DOB NOWStreet Tree Checklist1
08/25/2026Q00598586-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q00598586-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/06/2022440740619Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/06/2022440740619Open ↗
▸Other Documents4
▸BISBPP - SUPPORTING DOCUMENTATION2
09/15/2022440740619Open ↗
09/15/2022440740619Open ↗
▸DOB NOWProperty Ownership Certification1
08/25/2026Q00598586-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00598586-I1Open ↗