← Back
Cape Cod
80-41 248 STREET
QUEENS · BIN 4174431
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2AZoning
1,125 sfGross Floor Area
1Units
Cape Cod · 3,900 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
General
Roof1p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLANKI ENGINEERING, PC301/04/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLANKI ENGINEERING, P.C.8451201/04/2024
Building Lifecycle
All (34)Filed (3)Objection (1)Special Inspection (30)
01/19/2024
Objection raised — Other
01/04/2024
Filed — Alteration CO
SUBSEQUENT FILING FOR THE INSTALLATION OF PLUMBING FIXTURES THROUGHOUT DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00973232-S2
01/04/2024
Filed — Alteration CO
SUBSEQUENT FILING FOR THE INSTALLATION OF PLUMBING FIXTURES THROUGHOUT DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00973232-I1
01/04/2024
Filed — Alteration CO
SUBSEQUENT FILING FOR THE INSTALLATION OF PLUMBING FIXTURES THROUGHOUT DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00973232-S1
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
12/08/2023
Special inspection requirement — Maintenance information
Ashray Solanki
12/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ashray Solanki
12/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashray Solanki
12/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ashray Solanki
12/07/2023
Special inspection requirement — Masonry
Ashray Solanki
12/07/2023
Special inspection requirement — Subgrade Inspections
Ashray Solanki
12/07/2023
Special inspection requirement — Structural Steel - Welding
Ashray Solanki
12/07/2023
Special inspection requirement — Structural Cold-Formed Steel
Ashray Solanki
12/07/2023
Special inspection requirement — Final
Ashray Solanki
12/07/2023
Special inspection requirement — Footing and Foundation
Ashray Solanki
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Ashray Solanki
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ashray Solanki
12/07/2023
Special inspection requirement — Structural Wood Frame
Ashray Solanki
12/07/2023
Special inspection requirement — Air barrier - visual inspection
Ashray Solanki
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ashray Solanki
12/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashray Solanki
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ashray Solanki
12/07/2023
Special inspection requirement — Insulation placement and R values
Ashray Solanki
12/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
Ashray Solanki
12/07/2023
Special inspection requirement — Fenestration air leakage
Ashray Solanki
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashray Solanki
12/07/2023
Special inspection requirement — Interior lighting power
Ashray Solanki
12/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ashray Solanki
12/07/2023
Special inspection requirement — Metering
Ashray Solanki
12/07/2023
Special inspection requirement — Maintenance information
Ashray Solanki
12/07/2023
Special inspection requirement — Fenestration areas
Ashray Solanki
12/07/2023
Special inspection requirement — Permanent certificate
Ashray Solanki
12/07/2023
Special inspection requirement — Duct leakage testing, insulation and design
Ashray Solanki
12/07/2023
Special inspection requirement — Mechanical Systems
Ashray Solanki
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDN/A02/02/2001
1 project · most recent 01/04/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/04/2024——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-4C36NA2 36,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NA2 18,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 01/04/2024
Gas Water/Sanitary
FiledStatusContractorScope
01/04/2024——Gas, Water/Sanitary
1 project · most recent 01/04/2024
Wood
FiledStatusContractorScope
01/04/2024——Wood
1 project · most recent 01/04/2024
Fence
FiledStatusContractorScope
01/04/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
12/08/2023Fire-Resistant Penetrations and JointsAshray Solankispecial
12/08/2023Maintenance informationAshray Solankienergy_progress
12/08/2023HVAC-R and service water heating system controlsAshray Solankienergy_progress
12/08/2023HVAC-R and service water piping design and insulationAshray Solankienergy_progress
12/08/2023HVAC-R and service water heating equipmentAshray Solankienergy_progress
12/07/2023MasonryAshray Solankispecial
12/07/2023Subgrade InspectionsAshray Solankispecial
12/07/2023Structural Steel - WeldingAshray Solankispecial
12/07/2023Structural Cold-Formed SteelAshray Solankispecial
12/07/2023FinalAshray Solankiprogress
12/07/2023Footing and FoundationAshray Solankiprogress
12/07/2023Energy Code Compliance InspectionsAshray Solankiprogress
12/07/2023Fire-Resistance Rated ConstructionAshray Solankiprogress
12/07/2023Structural Wood FrameAshray Solankiprogress
12/07/2023Air barrier - visual inspectionAshray Solankienergy_progress
12/07/2023HVAC-R and service water heating equipmentAshray Solankienergy_progress
12/07/2023Structural Stability – Alterations of existing buildingsAshray Solankispecial
12/07/2023HVAC-R and service water heating system controlsAshray Solankienergy_progress
12/07/2023Insulation placement and R valuesAshray Solankienergy_progress
12/07/2023Electric vehicle service equipment requirementsAshray Solankienergy_progress
12/07/2023Fenestration air leakageAshray Solankienergy_progress
12/07/2023HVAC-R and service water piping design and insulationAshray Solankienergy_progress
12/07/2023Interior lighting powerAshray Solankienergy_progress
12/07/2023Fenestration and door U-factor and product ratingsAshray Solankienergy_progress
12/07/2023MeteringAshray Solankienergy_progress
Latest 25 of 33.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026Q00973232-S2Request digital key ↗
08/23/2026Q00973232-S1Request digital key ↗
08/23/2026Q00973232-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00973232-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00973232-I1Open ↗
08/25/2026Q00973232-I1Open ↗
08/24/2026Q00973232-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026Q00973232-S2Open ↗
08/23/2026Q00973232-S1Open ↗
08/23/2026Q00973232-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00973232-I1Open ↗
08/24/2026Q00973232-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00973232-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00973232-S1Open ↗
08/23/2026Q00973232-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q00973232-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026Q00973232-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00973232-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00973232-I1Open ↗