| Owner | Filings | Most Recent |
|---|---|---|
| DRM CONSTRUCTION | 3 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/18/2020 | $850K | — | Private party → Private party | $257/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| GEORGIOS G GEORGOPOULOS, R.A. | 7 | 03/05/2025 |
| NY BUILDING ASSOCIATES INC | 1 | 09/17/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| S R SOLAR DESIGN | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| DRM CONSTRUCTION CORP | General Contractor | 15 | 03/21/2026 |
| JENOCA CONSTRUCTION INC | General Contractor | 3 | 03/21/2026 |
| LONG ISLAND POWER SOLUTIO | General Contractor | 2 | 03/21/2026 |
| HORBRIDGE PLUMBING & HEATING | Plumbing | 1 | 07/08/2026 |
| M & M PIPING AND HEATING | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| GEORGIOS G. GEORGOPOULOS, | 1192 | 7 | 03/05/2025 |
| H2 CONSULTING PE PC | 835 | 2 | 03/05/2025 |
| NKM ENGINEERING PLLC | 6244 | 1 | 09/17/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Foundation | Signed-off | JENOCA CONSTRUCTION INC | 01/24/2025 |
| DOB NOW | Solar | Signed-off | LONG ISLAND POWER SOLUTIO | 10/07/2024 |
| DOB NOW | Plumbing | Signed-off | M & M PIPING AND HEATING | 08/01/2024 |
| DOB NOW | Construction Fence | Signed-off | DRM CONSTRUCTION CORP | 01/10/2023 |
| DOB NOW | General Construction | Signed-off | DRM CONSTRUCTION CORP | 09/23/2022 |
| DOB NOW | Construction Fence | Signed-off | DRM CONSTRUCTION CORP | 09/01/2022 |
| DOB NOW | Plumbing | Signed-off | HORBRIDGE PLUMBING & HEAT | 05/04/2022 |
| DOB NOW | Construction Fence | Signed-off | DRM CONSTRUCTION CORP | 02/21/2022 |
| DOB NOW | Mechanical Systems | Signed-off | DRM CONSTRUCTION CORP | 02/15/2022 |
| BIS | OT | ISSUED | LONG ISLAND POWER SOLUTIO | 04/19/2023 |
| BIS | PL | ISSUED | M & J PLBGG. & MECHAN. | 06/13/2000 |
| BIS | — | ISSUED | COMPETITIVE GENERAL CONTRACTING | 04/14/2000 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/05/2025 | Signed-off | JENOCA CONSTRUCTION INC | Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Comfort Aire AHG48-0A 48,000 BTU · Ahu ×2 Heating Navien NCB-250/150H (NG) 138,000 BTU · Boiler ×2 Ventilation Samsung NK36N7000US 390 CFM · Vrf Outdoor ×2 Ducts & Piping N/A N/A 465 CFM · Ductwork ×52 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/23/2025 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 06/07/2025 | Complete | TRIPLE I ELEC'L CONTR'G I | General Wiring |
| 11/07/2024 | Complete | CATIZONE ELECTRICAL INC | — |
| 10/28/2022 | Complete | CATIZONE ELECTRICAL INC | — |
| 07/06/2022 | Complete | RICHARD NEU | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/05/2025 | Signed-off | JENOCA CONSTRUCTION INC | Wood |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/16/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/02/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/27/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/27/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/28/2022 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/28/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/28/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 12/11/2024 | Concrete - Cast-In-Place | Georgios Georgopoulos | special |
| 12/11/2024 | Fire-Resistant Penetrations and Joints | Georgios Georgopoulos | special |
| 12/11/2024 | Masonry | Georgios Georgopoulos | special |
| 12/11/2024 | Mechanical Systems | Georgios Georgopoulos | special |
| 12/11/2024 | Structural Stability – Alterations of existing buildings | Harry Hong | special |
| 12/11/2024 | Subsurface Investigations (Borings/Test Pits) | MICHAEL KARANTINIDIS, P.E. | special |
| 12/11/2024 | Wood – Prefabricated I-Joists | Georgios Georgopoulos | special |
| 12/11/2024 | Energy Code Compliance Inspections | Georgios Georgopoulos | progress |
| 12/11/2024 | Final | Georgios Georgopoulos | progress |
| 12/11/2024 | Fire-Resistance Rated Construction | Georgios Georgopoulos | progress |
| 12/11/2024 | Footing and Foundation | Georgios Georgopoulos | progress |
| 12/11/2024 | Duct leakage testing, insulation and design | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Fenestration air leakage | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Air barrier - visual inspection | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Fenestration and door U-factor and product ratings | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Fenestration areas | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Insulation placement and R values | Georgios Georgopoulos | energy_progress |
| 12/11/2024 | Interior lighting power | Georgios Georgopoulos | energy_progress |
| 11/27/2024 | Fire-Resistant Penetrations and Joints | Georgios Georgopoulos | special |
| 11/15/2024 | Fire-Resistant Penetrations and Joints | Georgios Georgopoulos | special |
| 06/06/2024 | Structural Stability – Alterations of existing buildings | NARESH MAHANGU | special |
| 06/06/2024 | Energy Code Compliance Inspections | NARESH MAHANGU | progress |
| 06/06/2024 | Air barrier - visual inspection | NARESH MAHANGU | energy_progress |
| 06/06/2024 | Final | NARESH MAHANGU | progress |
| 06/06/2024 | Fire-Resistant Penetrations and Joints | NARESH MAHANGU | special |