ECB11/26/2014PLANTING REQUIREMENT AT FRONT YARD. NOTED: AT TIME OF INSPECTION THE ENTIRE FRONT YARD WAS CONCRETE PAVED OF AN APPRX AREA OF 350 SQFT ELIMINATING THE PLANTING AREA. RMDY: PROVIDE PLANTING AREA AT FRONT YARDNothing owed — awaiting certificate of correction
Two family converted from one family · 2,500 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.