← Back
Two stories - detached, small or mid-size
80-47 212 STREET
QUEENS · BIN 4164660
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,500 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction21p · 1 filing · 20 docs
Floor 1Under Construction21p · 1 filing · 20 docs
1 job · most recent 06/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedWING LEE CONTRACTOR INCHeating and Air Conditioning Systems
Heat / Cool
1 job · most recent 05/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/19/2025Signed-offCATMAN PLUMBING INCStorm, Water/Sanitary
1 job · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
1 job · most recent 06/18/2026
Wood
FiledStatusContractorScope
06/18/2026Permit IssuedWING LEE CONTRACTOR INCWood
1 job · most recent 05/19/2025
Fence
FiledStatusContractorScope
05/19/2025Permit IssuedWING LEE CONTRACTOR INCFence
1 job · most recent 06/18/2026
Earthwork
FiledStatusContractorScope
06/18/2026Permit IssuedWING LEE CONTRACTOR INCEarthwork
Building Lifecycle
All (50)Filed (5)Permit Issued (8)Inspection (1)Objection (6)Special Inspection (30)
08/24/2026
Permit issued — Plumbing
Q01215863-I1-PL
07/29/2026
Permit issued — General Construction
Q01215708-I1-GC-CX
07/29/2026
Permit issued — Construction Fence
Q01215858-I1-FN
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Objection resolved — Open
07/09/2026
Objection raised — Other
06/18/2026
Filed — Alteration
application filed to enlarge at rear, exterior & interior walls; to remain 1 family
Q01215708-P2
04/27/2026
Permit issued — Plumbing
Q01215863-I1-PL
03/24/2026
Permit issued — General Construction
Q01215708-I1-GC-CX
03/24/2026
Permit issued — Construction Fence
Q01215858-I1-FN
12/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
12/21/2025
Special inspection requirement — Concrete - Cast-In-Place
James Wai
12/21/2025
Special inspection requirement — Heating Systems
James Wai
12/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
James Wai
12/21/2025
Special inspection requirement — Subgrade Inspections
James Wai
12/21/2025
Special inspection requirement — Aluminum Construction
12/21/2025
Special inspection requirement — Mechanical Systems
James Wai
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
12/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Wai
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
12/21/2025
Special inspection requirement — Footing and Foundation
James Wai
12/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
James Wai
12/21/2025
Special inspection requirement — Final
James Wai
12/21/2025
Special inspection requirement — Structural Wood Frame
James Wai
12/21/2025
Special inspection requirement — Air barrier - visual inspection
James Wai
12/21/2025
Special inspection requirement — Insulation placement and R values
James Wai
12/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Wai
12/21/2025
Special inspection requirement — Fenestration areas
James Wai
12/21/2025
Special inspection requirement — Fenestration air leakage
James Wai
11/05/2025
Filed — Alteration
application filed to enlarge at rear, exterior & interior walls; to remain 1 family
Q01215708-P1
11/05/2025
Special inspection requirement — Aluminum Construction
11/05/2025
Special inspection requirement — Concrete - Cast-In-Place
James Wai
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
11/05/2025
Special inspection requirement — Heating Systems
James Wai
11/05/2025
Special inspection requirement — Mechanical Systems
James Wai
11/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
James Wai
11/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Wai
11/05/2025
Special inspection requirement — Subgrade Inspections
James Wai
11/05/2025
Special inspection requirement — Air barrier - visual inspection
James Wai
11/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
James Wai
11/05/2025
Special inspection requirement — Fenestration air leakage
James Wai
11/03/2025
Permit issued — Mechanical Systems
Q01215708-I1-GC-CX
11/03/2025
Permit issued — Construction Fence
Q01215858-I1-FN
08/08/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Energy
06/02/2025
Objection raised — Scope
05/19/2025
Filed — Alteration
PLUMBING
Q01215863-I1
05/19/2025
Filed — Alteration
TEMP CONSTR. FENCE; 8' HIGH AT LOT LINES
Q01215858-I1
05/19/2025
Filed — Alteration
application filed to enlarge at rear, exterior & interior walls; to remain 1 family
Q01215708-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/12/2015$768K—— → —$512/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT506/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WING LEE CONTRACTOR INCGeneral Contractor607/30/2026
CATMAN PLUMBING INCPlumbing108/25/2026
S & L PLUMBING INCPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKW ENGINEERING, P.C.1856406/18/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC08/24/2026
DOB NOWGeneral ConstructionPermit IssuedWING LEE CONTRACTOR INC07/29/2026
DOB NOWConstruction FencePermit IssuedWING LEE CONTRACTOR INC07/29/2026
DOB NOWPlumbingSigned-offS & L PLUMBING INC04/27/2026
DOB NOWGeneral ConstructionPermit IssuedWING LEE CONTRACTOR INC03/24/2026
DOB NOWConstruction FencePermit IssuedWING LEE CONTRACTOR INC03/24/2026
DOB NOWMechanical SystemsPermit IssuedWING LEE CONTRACTOR INC11/03/2025
DOB NOWConstruction FencePermit IssuedWING LEE CONTRACTOR INC11/03/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
12/21/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
12/21/2025Concrete - Cast-In-PlaceJames Waispecial
12/21/2025Heating SystemsJames Waispecial
12/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJames Waispecial
12/21/2025Subgrade InspectionsJames Waispecial
12/21/2025Aluminum Construction—special
12/21/2025Mechanical SystemsJames Waispecial
12/21/2025Fire-Resistant Penetrations and JointsJames Waispecial
12/21/2025Structural Stability – Alterations of existing buildingsJames Waispecial
12/21/2025Energy Code Compliance InspectionsJames Waiprogress
12/21/2025Footing and FoundationJames Waiprogress
12/21/2025Fire-Resistance Rated ConstructionJames Waiprogress
12/21/2025FinalJames Waiprogress
12/21/2025Structural Wood FrameJames Waiprogress
12/21/2025Air barrier - visual inspectionJames Waienergy_progress
12/21/2025Insulation placement and R valuesJames Waienergy_progress
12/21/2025Fenestration and door U-factor and product ratingsJames Waienergy_progress
12/21/2025Fenestration areasJames Waienergy_progress
12/21/2025Fenestration air leakageJames Waienergy_progress
11/05/2025Aluminum Construction—special
11/05/2025Concrete - Cast-In-PlaceJames Waispecial
11/05/2025Fire-Resistant Penetrations and JointsJames Waispecial
11/05/2025Heating SystemsJames Waispecial
11/05/2025Mechanical SystemsJames Waispecial
11/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJames Waispecial
Latest 25 of 38.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026Q01215863-I1Request digital key ↗
08/20/2026Q01215858-I1Request digital key ↗
08/18/2026Q01215708-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
08/13/2026Q01215708-P1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01215863-I1Open ↗
08/18/2026Q01215708-P2Open ↗
08/18/2026Q01215708-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01215708-P1Open ↗
09/01/2026Q01215708-P1Open ↗
09/01/2026Q01215708-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q01215708-P1Open ↗
09/01/2026Q01215708-P1Open ↗
09/01/2026Q01215708-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q01215863-I1Open ↗
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
08/13/2026Q01215708-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01215708-I1Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
08/13/2026Q01215708-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
08/13/2026Q01215708-P1Open ↗
▸DOB NOWPlot Diagram3
08/18/2026Q01215708-I1Open ↗
08/15/2026Q01215708-P2Open ↗
08/13/2026Q01215708-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01215708-I1Open ↗