← Back
BuildNYC
Two stories - detached, small or mid-size
80-54 192ND STREET
QUEENS · BIN 4156379
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,996 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar Pro renewable energy14p · 2 filings · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
Site & exterior8p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2022$1.1M—Private party → Private party$551/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA Building & Inspection Service410/13/2026
RMM Design Studio108/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dmconsulting6860603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yafe MeodGeneral Contractor603/21/2026
Yafe MeodScaffold404/09/2026
Webstar Electrical ContractorsElectrical103/22/2026
Solar ProGeneral Contractor104/09/2026
Flow State ElectricElectrical103/22/2026
Horbridge Plumbing & HeatingPlumbing106/28/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519310/13/2026
World Design Architecture9323108/25/2025
Building Lifecycle
All (43)Filed (5)Permit Issued (6)Signed Off (2)Violation (3)Inspection (1)Objection (6)Special Inspection (20)
10/13/2026
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-P1
09/23/2026
Violation issued (ECB, open)
Zoning
07/06/2026
Signed off — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-I1
07/03/2026
Signed off — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-S2
11/10/2025
Permit issued — Structural
Q01037878-I1-GC-CX
11/10/2025
Permit issued — Construction Fence
Q01037878-S2-FN
08/25/2025
Filed — Alteration
Q01277230-I1
07/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2025
Violation issued (ECB, closed)
Construction
03/19/2025
Permit issued — Plumbing
Q01037878-S1-PL
11/07/2024
Permit issued — Mechanical Systems
Q01037878-I1-GC-CX
11/07/2024
Permit issued — Construction Fence
Q01037878-S2-FN
10/30/2024
Permit issued — Plumbing
Q01037878-S1-PL
10/16/2024
Objection resolved — Addressed
10/02/2024
Objection resolved — Addressed
09/26/2024
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-S2
07/12/2024
Objection resolved — Addressed
07/01/2024
Objection raised — Admin
06/28/2024
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-S1
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/28/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/28/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
06/25/2024
Objection raised — Admin
05/08/2024
Objection raised — Zoning
05/01/2024
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR VERTICAL EXTENSION TO AN EXISTING TWO-STORY witONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, ADDRESS VIO # VIO24. AND TO OBTAIN LOC. NO CHANGE TO THE USE, OCCUP, OR EGRESS
Q01037878-I1
04/18/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/18/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/18/2024
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
04/18/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/18/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
04/18/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/18/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/18/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/18/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/19/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offYafe Meod11/10/2025
DOB NOWConstruction FenceSigned-offYafe Meod11/10/2025
DOB NOWPlumbingPermit IssuedHorbridge Plumbing & Heating03/19/2025
DOB NOWMechanical SystemsSigned-offYafe Meod11/07/2024
DOB NOWConstruction FenceSigned-offYafe Meod11/07/2024
DOB NOWPlumbingPermit IssuedJVR Plumbing and Heating10/30/2024
1 project · most recent 10/13/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/13/2026Signed-offYafe MeodVentilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
1 project · most recent 10/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/13/2026Permit IssuedHorbridge Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 08/22/2025
FiledStatusContractorScope
08/22/2025Permit IssuedFlow State Electric—
12/01/2024Permit IssuedWebstar Electrical Contractors1 meters, 1 new_meters
1 project · most recent 10/13/2026
Wood
FiledStatusContractorScope
10/13/2026Signed-offYafe MeodWood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/28/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/28/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/28/2024Permanent certificateYounes Abouyaalaenergy_progress
06/28/2024Maintenance informationYounes Abouyaalaenergy_progress
04/18/2024Mechanical SystemsYounes Abouyaalaspecial
04/18/2024FinalNAVEEN KUMARprogress
04/18/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/18/2024Structural Wood FrameYounes Abouyaalaprogress
04/18/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/18/2024Exterior lighting powerYounes Abouyaalaenergy_progress
04/18/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/18/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/18/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/18/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/18/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/18/2024Interior lighting powerYounes Abouyaalaenergy_progress
04/18/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/18/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/18/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/18/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01037878-I1Request digital key ↗
08/21/2026Q01037878-S2Request digital key ↗
08/21/2026Q01037878-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01037878-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature5
10/06/2026Q01037878-I1Open ↗
10/06/2026Q01037878-I1Open ↗
10/06/2026Q01037878-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/06/2026Q01037878-I1Open ↗
10/06/2026Q01037878-I1Open ↗
08/25/2026Q01037878-S1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01037878-I1Open ↗
08/13/2026Q01037878-S1Open ↗
08/13/2026Q01037878-S2Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01037878-S1Open ↗
08/13/2026Q01037878-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01037878-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01037878-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01037878-I1Open ↗