← Back
BuildNYC
Walk-up apt, over six families with stores
80 DELANCEY STREET
MANHATTAN · Lower East Side · BIN 1005508
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
C6-2AZoning
25,071 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized1 Active Violation ▸
Walk-up apt, over six families with stores · Owner of record: 80 Delancey · 5,820 sf lot · 4.31 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 21 filing
Floor 14 filings
Cellar2 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
80 Delancey Realty4503/21/2026
Vintage Group4407/08/2026
80 Delancey4103/22/2026
Era Realty2203/21/2026
Aka 99 Cents Fresh Pizza103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York Design Architects301/09/2025
SY Engineering203/09/2023
Ashraf102/28/2022
Romit Gajjar102/24/2022
Billah Engineering205/24/2021
Sustainable Design Engineering102/05/2021
NS Engineers112/15/2020
KMB Design Group102/13/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York Design Architect603/21/2026
Nexus Consulting NYC203/21/2026
Youber Design803/21/2026
K M DOB Consulting403/21/2026
An Tong Fan203/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marte ConstructionGeneral Contractor707/08/2026
Ideal Kitchen & Ventilatispecialty_contractor303/21/2026
Site EnterGeneral Contractor303/21/2026
Daven ElectricElectrical203/22/2026
Mauceri Sign Systemsspecialty_contractor203/21/2026
Squan Construction ServicesGeneral Contractor203/21/2026
American Jersey ImproveScaffold104/09/2026
Doval Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957201/09/2025
SY Engineering5149203/09/2023
Poly Engineer6110102/28/2022
Billah Engineering5838105/24/2021
KMB Design Group513102/13/2018
Building Lifecycle
07/24/2026
Boiler inspection report filed
Initial · no defects · Accepted
03/04/2026
Signed off — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE FOR THE INSTALLATION OF THE STOREFRONT. STOREFRONT WORK FILED UNDER SEPARATE APPLICATION.
M01157871-I1
09/11/2025
Boiler inspection report filed
Initial · no defects · Accepted
01/28/2025
Permit issued — Construction Fence
M01157871-I1-FN
01/09/2025
Filed — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE FOR THE INSTALLATION OF THE STOREFRONT. STOREFRONT WORK FILED UNDER SEPARATE APPLICATION.
M01157871-I1
103 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
822 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account