| Owner | Filings | Most Recent |
|---|---|---|
| HUGH GRANT CIRCLE PLAZA | 16 | 03/21/2026 |
| TUCKAHOE REALTY | 4 | 03/21/2026 |
| CHICKENFEST INC | 1 | 03/22/2026 |
| TUKAHOE REALTY | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 05/23/2023 | $6.3M | — | TUCKAHOE REALTY LLC → HUGH GRANT CIRCLE PLAZA LLC | $606/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| MEP ENGINEERING, P.C. | 2 | 02/09/2026 |
| RICHARD JIMENEZ ARCHITECTURE | 2 | 01/27/2026 |
| WRG ENGINEERING, P.C. | 2 | 01/27/2026 |
| COMPREHENSIVE ENGINEERING | 1 | 07/22/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| A&A BUILDING CONSULTANTS INC. | 12 | 03/21/2026 |
| FRANK BUENO EXPEDITING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| METROPOLITAN PLBG AND HTG | Plumbing | 2 | 03/22/2026 |
| EVANS, DWAYNE | Electrical | 1 | 03/21/2026 |
| HERNANDEZ, L | Electrical | 1 | 03/21/2026 |
| MAGUIRE, SHAWN | Electrical | 1 | 03/21/2026 |
| CORE ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| NICHOLAS GABRIEL | Electrical | 1 | 03/21/2026 |
| PAUL LEFKOWITZ | Electrical | 1 | 03/21/2026 |
| WEISS, NORMAN | Electrical | 1 | 03/21/2026 |
| M&L SIGNS INC | Electrical | 1 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | PL | ISSUED | METROPOLITAN PLBG AND HTG | 10/11/2016 |
| BIS | PL | ISSUED | METROPOLITAN PLBG AND HTG | 06/30/2016 |
| BIS | OT | ISSUED | E & D GENERAL CONTRACTOR | 12/12/2011 |
| BIS | PL | ISSUED | SEAN COAKLEY P & H INC | 03/05/2007 |
| BIS | PL | ISSUED | GT PLG & HTG | 02/12/2001 |
| BIS | OT | ISSUED | KORMAN DESIGN & BUILD | 01/06/2000 |
| BIS | PL | ISSUED | ROBERT DUJAT PLB | 01/26/1998 |
| BIS | — | ISSUED | MAPP CONSTRUCTION CO., INC. | 12/09/1997 |
| BIS | FP | ISSUED | IDEAL FIRE CONTROL | 09/20/1994 |
| BIS | PL | ISSUED | A P PLUMBING&HEATING INC | 08/16/1994 |
| BIS | EQ | ISSUED | VERY FINE INC. | 07/29/1994 |
| BIS | MH | ISSUED | VERY FINE INC. | 07/29/1994 |
| BIS | PL | ISSUED | WATERWAYS MECHANICAL | 12/03/1991 |
| BIS | FP | ISSUED | MASTER FIRE PREVENTION SYSTEMS | 12/02/1991 |
| BIS | — | ISSUED | JMA & ASSOCIATES | 10/08/1991 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/09/2026 | — | — | Generators, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Lennox Lennox LHT060H5E 57,000 BTU · Heat Pump Outdoor ×3 Lennox LEX036txmdch 42,000 BTU · Vrf Outdoor ×1 Lennox LEX053txmdch 61,000 BTU · Split System ×1 Lennox LEX060MXMDCH 66,000 BTU · Split System ×1 Lennox LHT 240H5M 226,000 BTU · Heat Pump Outdoor ×1 Lennox LHT048H5E 44,000 BTU · Heat Pump Outdoor ×1 Lennox LHT072H5E 66,000 BTU · Heat Pump Outdoor ×1 Ventilation Captiveaire A1-16Z 1,105 CFM · Makeup Air ×1 CAS-HVAC3-E1002-24-30T-DOAS 4,073 CFM · Heat Pump Outdoor ×1 Captive Air A2-20D 3,730 CFM · Makeup Air ×1 Captive Air CAS-HVAC1-E302-15-6T-EOAS 900 CFM · Heat Pump Outdoor ×1 KB10 1,228 CFM · Exhaust Fan ×1 USBI24DD-RM 4,144 CFM · Kitchen Exhaust ×1 Greenheck GRSR-10 300 CFM ×2 Loren Cook ACE-D-VF 640 CFM · Exhaust Fan ×1 Renewaire EV Premium X 390 CFM · Erv ×1 Generators Generac Generac Model RG15090 150 kW · Generator ×1 Refrigeration Hussmann LAV23310 215,352 CFM · Refrigeration Unit ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/24/2018 | Complete | CORE ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/09/2026 | — | — | Steel |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/13/2026 | Post-installed Anchors | — | special |
| 05/13/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/13/2026 | Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components | — | special |
| 05/13/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/13/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/13/2026 | Energy Code Compliance Inspections | — | progress |
| 05/13/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/13/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/13/2026 | Maintenance information | — | energy_progress |
| 10/03/2025 | Structural Steel - Details | — | special |
| 09/10/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 09/10/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 09/10/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/10/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/09/2025 | Mechanical Systems | — | special |
| 09/09/2025 | Final | — | progress |
| 08/27/2025 | Air barrier — testing | — | energy_progress |
| 08/27/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 07/16/2025 | Masonry | — | special |
| 07/16/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 07/16/2025 | Underpinning | — | special |
| 07/16/2025 | Energy Code Compliance Inspections | — | progress |
| 07/16/2025 | Fire-Resistance Rated Construction | — | progress |
| 07/16/2025 | Air barrier - visual inspection | — | energy_progress |
| 07/16/2025 | Fenestration air leakage | — | energy_progress |