← Back
One story retail building
80 HUGH J GRANT CIRCLE
BRONX · Castle Hill-Unionport · BIN 2025961
💬 Discuss this project
1928Year Built
1Stories
K1Building Class
R6Zoning
10,392 sfGross Floor Area
5Units
1 Open Violation ▸
One story retail building · Owner of record: HUGH GRANT CIRCLE PLAZA LLC · 10,650 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Filed — no permit issued136p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUGH GRANT CIRCLE PLAZA1603/21/2026
TUCKAHOE REALTY403/21/2026
CHICKENFEST INC103/22/2026
TUKAHOE REALTY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2023$6.3M—TUCKAHOE REALTY LLC → HUGH GRANT CIRCLE PLAZA LLC$606/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEP ENGINEERING, P.C.202/09/2026
RICHARD JIMENEZ ARCHITECTURE201/27/2026
WRG ENGINEERING, P.C.201/27/2026
COMPREHENSIVE ENGINEERING107/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1203/21/2026
FRANK BUENO EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METROPOLITAN PLBG AND HTGPlumbing203/22/2026
EVANS, DWAYNEElectrical103/21/2026
HERNANDEZ, LElectrical103/21/2026
MAGUIRE, SHAWNElectrical103/21/2026
CORE ELECTRICAL CORPElectrical103/22/2026
NICHOLAS GABRIELElectrical103/21/2026
PAUL LEFKOWITZElectrical103/21/2026
WEISS, NORMANElectrical103/21/2026
M&L SIGNS INCElectrical103/21/2026
Building Lifecycle
All (135)Filed (7)Violation (20)Objection (78)Special Inspection (30)
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Resolved
07/06/2026
Objection raised — Other
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/22/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
05/18/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/13/2026
Special inspection requirement — Post-installed Anchors
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/13/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
05/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
05/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/13/2026
Special inspection requirement — Maintenance information
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/09/2026
Objection resolved — Resolved
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/20/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Plumbing
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
02/20/2026
Objection raised — Fire_Protection
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDMETROPOLITAN PLBG AND HTG10/11/2016
BISPLISSUEDMETROPOLITAN PLBG AND HTG06/30/2016
BISOTISSUEDE & D GENERAL CONTRACTOR12/12/2011
BISPLISSUEDSEAN COAKLEY P & H INC03/05/2007
BISPLISSUEDGT PLG & HTG02/12/2001
BISOTISSUEDKORMAN DESIGN & BUILD01/06/2000
BISPLISSUEDROBERT DUJAT PLB01/26/1998
BIS—ISSUEDMAPP CONSTRUCTION CO., INC.12/09/1997
BISFPISSUEDIDEAL FIRE CONTROL09/20/1994
BISPLISSUEDA P PLUMBING&HEATING INC08/16/1994
BISEQISSUEDVERY FINE INC.07/29/1994
BISMHISSUEDVERY FINE INC.07/29/1994
BISPLISSUEDWATERWAYS MECHANICAL12/03/1991
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS12/02/1991
BIS—ISSUEDJMA & ASSOCIATES10/08/1991
1 project · most recent 02/09/2026
Generators Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/09/2026——Generators, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Lennox Lennox LHT060H5E 57,000 BTU · Heat Pump Outdoor ×3
Lennox LEX036txmdch 42,000 BTU · Vrf Outdoor ×1
Lennox LEX053txmdch 61,000 BTU · Split System ×1
Lennox LEX060MXMDCH 66,000 BTU · Split System ×1
Lennox LHT 240H5M 226,000 BTU · Heat Pump Outdoor ×1
Lennox LHT048H5E 44,000 BTU · Heat Pump Outdoor ×1
Lennox LHT072H5E 66,000 BTU · Heat Pump Outdoor ×1
Ventilation
Captiveaire A1-16Z 1,105 CFM · Makeup Air ×1
CAS-HVAC3-E1002-24-30T-DOAS 4,073 CFM · Heat Pump Outdoor ×1
Captive Air A2-20D 3,730 CFM · Makeup Air ×1
Captive Air CAS-HVAC1-E302-15-6T-EOAS 900 CFM · Heat Pump Outdoor ×1
KB10 1,228 CFM · Exhaust Fan ×1
USBI24DD-RM 4,144 CFM · Kitchen Exhaust ×1
Greenheck GRSR-10 300 CFM ×2
Loren Cook ACE-D-VF 640 CFM · Exhaust Fan ×1
Renewaire EV Premium X 390 CFM · Erv ×1
Generators
Generac Generac Model RG15090 150 kW · Generator ×1
Refrigeration
Hussmann LAV23310 215,352 CFM · Refrigeration Unit ×2
1 project · most recent 04/24/2018
FiledStatusContractorScope
04/24/2018CompleteCORE ELECTRICAL CORP—
1 project · most recent 02/09/2026
Steel
FiledStatusContractorScope
02/09/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
05/13/2026Post-installed Anchors—special
05/13/2026Fire-Resistant Penetrations and Joints—special
05/13/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
05/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/13/2026HVAC-R and service water heating equipment—energy_progress
05/13/2026Energy Code Compliance Inspections—progress
05/13/2026HVAC-R and service water heating system controls—energy_progress
05/13/2026HVAC-R and service water piping design and insulation—energy_progress
05/13/2026Maintenance information—energy_progress
10/03/2025Structural Steel - Details—special
09/10/2025Structural Stability – Alterations of existing buildings—special
09/10/2025HVAC-R and service water heating system controls—energy_progress
09/10/2025HVAC-R and service water piping design and insulation—energy_progress
09/10/2025HVAC-R and service water heating equipment—energy_progress
09/09/2025Mechanical Systems—special
09/09/2025Final—progress
08/27/2025Air barrier — testing —energy_progress
08/27/2025Protection of exposed foundation insulation—energy_progress
07/16/2025Masonry—special
07/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/16/2025Underpinning—special
07/16/2025Energy Code Compliance Inspections—progress
07/16/2025Fire-Resistance Rated Construction—progress
07/16/2025Air barrier - visual inspection—energy_progress
07/16/2025Fenestration air leakage—energy_progress
Latest 25 of 44.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/17/2026X01186778-S3Request digital key ↗
08/17/2026X01186778-S5Request digital key ↗
08/17/2026X01186778-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00372817-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
08/06/2020200112680Open ↗
03/07/2016220158969Open ↗
02/24/2016220516760Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY3
04/08/2014220013125Open ↗
10/26/2011220013125Open ↗
05/22/2009220013125Open ↗
▸BISWORK PERMIT APPLICATION2
10/11/2016220516760Open ↗
06/30/2016220516751Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
07/31/2009220013125Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01186778-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X01186778-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026X01186778-I1Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/15/2017220158969Open ↗
09/15/2017220158969Open ↗
02/24/2017220516760Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026X00372817-I1Open ↗
08/13/2026X01186778-S2Open ↗
08/13/2026X01186778-S5Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/07/2016220158969Open ↗
01/26/2012220158969Open ↗
12/05/2011220158969Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026X00372817-I1Open ↗
08/29/2026X00372817-I1Open ↗
08/29/2026X00372817-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/05/2011220158969Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/07/2016220158969Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/24/2016220516760Open ↗
02/24/2016220516751Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X01186778-I1Open ↗
08/13/2026X01186778-S2Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026X01186778-I1Open ↗
08/13/2026X01186778-S2Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/29/2016220516760Open ↗
06/29/2016220516751Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/05/2011220158969Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/22/2009220013125Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
02/24/2017220516760Open ↗
02/24/2017220516760Open ↗
12/21/2016220516751Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/24/2017220516760Open ↗
12/21/2016220516751Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/05/2011220158969Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026X01186778-S5Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/15/2017220158969Open ↗
02/24/2017220516760Open ↗
12/21/2016220516751Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/05/2011220158969Open ↗
05/22/2009220013125Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/28/2011220013125Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
09/15/2017220158969Open ↗
02/24/2017220516760Open ↗
12/21/2016220516751Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
03/07/2016220158969Open ↗
03/07/2016220158969Open ↗
01/26/2012220158969Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
02/24/2016220516760Open ↗
02/24/2016220516751Open ↗
12/05/2011220158969Open ↗
▸BISBOROUGH INTAKE FORM2
08/06/2020200112680Open ↗
09/15/2017220158969Open ↗
▸Other Documents8
▸DOB NOWPlot Diagram3
08/13/2026X01186778-I1Open ↗
08/13/2026X01186778-S2Open ↗
08/13/2026X01186778-S5Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026X01186778-S2Open ↗
08/13/2026X01186778-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X01186778-I1Open ↗
08/13/2026X01186778-S2Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026X01186778-I1Open ↗