← Back
Two family frame
80 NICHOLS AVENUE
BROOKLYN · BIN 3091209
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R5Zoning
1,820 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 1,800 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 11 docs
Floor 11p · 1 filing · 11 docs
Cellar1p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/23/2014$600K—— → —$330/sf building
05/08/2014$11K—Private party → 4MB FUND THIRD REALTY, INC.$6/sf building
05/08/2014$11K—Private party → 4MB FUND THIRD REALTY, INC.$6/sf building
05/08/2014$23K—Private party → 4MB FUND THIRD REALTY, INC.$12/sf building
05/08/2014$195K—Private party → 4MB FUND THIRD REALTY, INC.$107/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP210/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIANGLE ELECTRIC INC.Electrical103/22/2026
TRINCHESE CONSTRUCTION INGeneral Contractor107/08/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573210/13/2023
Building Lifecycle
All (30)Filed (2)Permit Issued (2)Signed Off (2)Violation (2)Inspection (3)Objection (8)Special Inspection (11)
10/23/2024
Signed off — Alteration
Proposed fire repairs of the existing 2-family, attached, frame building with brick filled party walls. There in no change to occupancy, use or egress
B00943659-I1
10/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/16/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/29/2024
Signed off — Alteration
Proposed fire repairs of the existing 2-family, attached, frame building with brick filled party walls. There in no change to occupancy, use or egress
B00943659-S1
04/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/11/2024
Permit issued — Plumbing
B00943659-S1-PL
11/16/2023
Permit issued — Structural
B00943659-I1-GC-CX
11/15/2023
Objection resolved — Addressed
11/15/2023
Objection resolved — Addressed
11/08/2023
Objection raised — Cost
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
10/19/2023
Objection raised — Scope
10/19/2023
Objection raised — Fire_Protection
10/19/2023
Objection raised — Scope
10/13/2023
Filed — Alteration
Proposed fire repairs of the existing 2-family, attached, frame building with brick filled party walls. There in no change to occupancy, use or egress
B00943659-S1
10/12/2023
Filed — Alteration
Proposed fire repairs of the existing 2-family, attached, frame building with brick filled party walls. There in no change to occupancy, use or egress
B00943659-I1
10/12/2023
Special inspection requirement — Insulation placement and R values
Nat Costanza
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
10/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
10/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
10/12/2023
Special inspection requirement — Fenestration areas
Nat Costanza
10/12/2023
Special inspection requirement — Air barrier - visual inspection
Nat Costanza
10/12/2023
Special inspection requirement — Fenestration air leakage
Nat Costanza
10/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
10/12/2023
Special inspection requirement — Lighting in dwelling units
Nat Costanza
10/12/2023
Special inspection requirement — Permanent certificate
Nat Costanza
10/04/2023
Special inspection requirement — Final
Nat Costanza
07/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING04/11/2024
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN11/16/2023
BISOTISSUEDSUSTEN CORP01/09/2018
1 project · most recent 01/24/2024
FiledStatusContractorScope
01/24/2024Permit IssuedTRIANGLE ELECTRIC INC.2 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/12/2023Insulation placement and R valuesNat Costanzaenergy_progress
10/12/2023Fire-Resistant Penetrations and JointsNat Costanzaspecial
10/12/2023Energy Code Compliance InspectionsNat Costanzaprogress
10/12/2023Fire-Resistance Rated ConstructionNat Costanzaprogress
10/12/2023Fenestration areasNat Costanzaenergy_progress
10/12/2023Air barrier - visual inspectionNat Costanzaenergy_progress
10/12/2023Fenestration air leakageNat Costanzaenergy_progress
10/12/2023Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
10/12/2023Lighting in dwelling unitsNat Costanzaenergy_progress
10/12/2023Permanent certificateNat Costanzaenergy_progress
10/04/2023FinalNat Costanzaprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00943659-S1Request digital key ↗
08/26/2026B00943659-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
01/09/2018340536110Open ↗
10/05/2017340536110Open ↗
08/11/2016340411593Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00943659-S1Open ↗
08/13/2026B00943659-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00943659-I1Open ↗
08/26/2026B00943659-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B00943659-I1Open ↗
08/31/2026B00943659-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/11/2016340411593Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/11/2016340411593Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/18/2017340536110Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/11/2016340411593Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026B00943659-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00943659-I1Open ↗
08/26/2026B00943659-S1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/15/2018340536110Open ↗
10/04/2017340536110Open ↗
08/11/2016340411593Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)2
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/15/2018340536110Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/11/2016340411593Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/15/2018340536110Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/15/2018340536110Open ↗
10/04/2017340536110Open ↗
08/11/2016340411593Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/15/2018340536110Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/15/2018340536110Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/15/2018340536110Open ↗
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
09/18/2017340536110Open ↗
08/11/2016340411593Open ↗
▸BISADDITIONAL INFORMATION1
07/13/2017340411593Open ↗