← Back
Two stories - detached, small or mid-size
80 NICOLE LOOP
STATEN ISLAND · BIN 5150889
💬 Discuss this project
1997Year Built
2Stories
A1Building Class
R3-2Zoning
2,800 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,361 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY D. SACHS, PE102/27/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157102/27/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/16/2024
Signed off — Alteration
S01008585-I1
04/08/2024
Permit issued — Solar
S01008585-I1-SL
02/27/2024
Filed — Alteration
S01008585-I1
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
02/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
02/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
02/21/2024
Special inspection requirement — Final
Ralph Pacifico
02/21/2024
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offGREGORY D. SACHS, PE04/08/2024
1 project · most recent 02/23/2024
FiledStatusContractorScope
02/23/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/21/2024Fire-Resistant Penetrations and JointsRalph Pacificospecial
02/21/2024Structural Stability – Alterations of existing buildingsRalph Pacificospecial
02/21/2024Energy Code Compliance InspectionsRalph Pacificoprogress
02/21/2024FinalRalph Pacificoprogress
02/21/2024Air barrier - visual inspectionRalph Pacificoenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01008585-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S01008585-I1Open ↗
08/26/2026S01008585-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01008585-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026S01008585-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01008585-I1Open ↗