← Back
Nursing home
80 RIDGE STREET
MANHATTAN · Lower East Side · BIN 1086094
💬 Discuss this project
1991Year Built
7Stories
I6Building Class
R7AZoning
121,800 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMPFDNY Report ↗
Nursing home · Owner of record: 80-92 RIDGE ST HDFC,INC · 17,400 sf lot · 7 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1850 SECOND AVE SERVICES COPR307/08/2026
SKYLINE SCAFFOLDING GROUP707/08/2026
80-92 RIDGE ST HDFC903/22/2026
80-92 RIDGE STMDFC INC103/22/2026
80-92 RIDGE ST NOUS DEV103/22/2026
BELLET CONSTRUCTION CO IN303/22/2026
80-92 RIDGE ST HSQ DEV FUND503/21/2026
80-92 RIDGE ST HOUSING DEVEL FUN503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VINCENT J. LIOTTA P.E.106/16/2026
PAUL PERDEK, PROF. ENG. PLLC304/23/2026
MVN ARCHITECT LLC107/22/2025
JOEL PHAGOO P.E. PLLC108/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
SOMMA DESIGN CONSULTING203/21/2026
TRADITIONAL WATERPROOFING & RESTORA203/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor807/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor307/08/2026
JOSEPH SORTINOElectrical103/21/2026
IDEAL FLOW MECHANICAL CO*General Contractor107/01/2026
SKYLINE RESTORATION INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974106/16/2026
SONI ENGINEERING CONSULTI9819102/19/2026
CROSSCHECK INSPECTION SER544107/22/2025
MVN ARCHITECT LLC5226107/22/2025
Building Lifecycle
All (102)Filed (8)Permit Issued (11)Signed Off (3)Facade (FISP) (13)Violation (48)Objection (4)Special Inspection (15)
07/17/2026
Signed off — Alteration
REPLACMENT OF SPLIT SYSTEM ON THE GROUND FLOOR AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01398022-I1
06/29/2026
Permit issued — Mechanical Systems
M01398022-I1-MS
06/16/2026
Filed — Alteration
REPLACMENT OF SPLIT SYSTEM ON THE GROUND FLOOR AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01398022-I1
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/16/2026
Special inspection requirement — Maintenance information
Vincent Liotta
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Vincent Liotta
06/12/2026
Permit issued — Sidewalk Shed
M01367203-I1-SH
05/06/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
05/06/2026
Special inspection requirement — Final
Vincent Liotta
04/23/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01367203-P1
03/26/2026
Permit issued — Supported Scaffold
M01367204-I1-SF
03/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01367204-I1
03/17/2026
Permit issued — Sidewalk Shed
M01367203-I1-SH
03/13/2026
Permit issued — General Construction
M01258941-I1-GC
03/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01367203-I1
02/27/2026
Permit issued — Suspended Scaffold
M01342422-I1-SC
02/19/2026
Filed — Alteration
M01342422-I1
02/18/2026
Special inspection requirement — Post-installed Anchors
nayan soni
02/18/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
09/02/2025
Objection resolved — Addressed
08/07/2025
Objection raised — Energy
07/22/2025
Filed — Alteration
SCOPE OF WORK LIMITED TO REPAIRS TO FACEBRICK, BRICK RE-POINTING, BRICK STITCHING, ROOFING REPAIR, AND ROOF RAILING REPAIR, WINDOW LINTEL AND SILL REPAIR
M01258941-I1
07/21/2025
Special inspection requirement — Masonry
Michael Notaro
07/21/2025
Special inspection requirement — Final
Michael Notaro
07/21/2025
Special inspection requirement — Preliminary
Michael Notaro
07/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
07/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
07/21/2025
Special inspection requirement — Post-installed Anchors
Michael Notaro
01/21/2025
Signed off — Alteration
For observation and work.
M00988039-I1
02/15/2024
Cycle 9 facade report submitted
02/14/2024
Cycle 9 facade report signed — SWARMP
01/25/2024
Cycle 9 facade inspection completed
01/24/2024
Permit issued — Suspended Scaffold
M00988039-I1-SC
01/22/2024
Objection raised — Other
01/22/2024
Objection resolved — Addressed
01/12/2024
Filed — Alteration
For observation and work.
M00988039-I1
04/01/2021
Violation issued (HPD, closed)
A
06/21/2020
Violation issued (HPD, closed)
B
05/12/2020
Signed off — Alteration
M00075384-I1
04/17/2020
Cycle 8 facade report signed — SAFE
04/10/2020
Cycle 8 facade inspection completed
03/09/2020
Violation issued (ECB, closed)
Local Law
02/19/2020
Cycle 8 facade report submitted
12/02/2019
Permit issued — Sidewalk Shed
M00075384-I1-SH
05/15/2019
Permit issued — Sidewalk Shed
M00075384-I1-SH
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2018
Permit issued — Sidewalk Shed
M00075384-I1-SH
08/31/2018
Permit issued — Sidewalk Shed
M00075384-I1-SH
08/30/2018
Filed — Alteration
M00075384-I1
06/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/25/2016
Violation issued (HPD, closed)
B
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/01/2013
Cycle 7 facade report submitted
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offIDEAL FLOW MECHANICAL CO*06/29/2026
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOLDING06/12/2026
DOB NOWSupported ScaffoldPermit IssuedPOWERS BRIDGING & SCAFFOL03/26/2026
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL03/17/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC03/13/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/27/2026
DOB NOWSuspended ScaffoldSigned-offTRADITIONAL WATER AND RES01/24/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/02/2019
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/15/2019
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP12/10/2018
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP08/31/2018
BISOTISSUEDWKR CONSTRUCTION, INC06/18/2020
BISOTISSUEDWKR CONSTRUCTION, INC04/08/2020
BISOTISSUEDWKR CONSTRUCTION, INC04/16/2019
BISOTISSUEDWKR CONSTRUCTION, INC09/12/2018
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/06/2010
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/22/2008
BISOTISSUEDCASE CONSTRUCTION03/31/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/09/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/18/2007
BIS—ISSUEDKREISLER BORG FLORMAN GEN CONST03/29/1994
BIS—ISSUEDKREISLER BORG FLORMAN GEN CONST03/30/1993
BIS—ISSUEDKREISLER BORG FLORMAN GEN CONST04/02/1992
BISEQISSUEDKREISLER BORG FLORMAN GEN CONST03/27/1992
BISEQISSUEDKRUGMAN & FOX CONST. CORP.03/10/1992
BISEQISSUEDKREISLER BORG FLORMAN GEN CONST01/06/1992
BIS—ISSUEDKREISLER BORG FLORMAN GEN CONST12/27/1991
BISEQISSUEDKREISLER BORG FLORMAN GEN CONST12/13/1991
BISPLISSUEDCARDOZA-WINER CORP10/28/1991
BIS—ISSUEDKREISLER BORG FLORMAN GEN CONST09/27/1991
1 project · most recent 06/16/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/16/2026Signed-offIDEAL FLOW MECHANICAL CO*Air Conditioning Systems
Cooling
Mitsubishi Electric PLFY-L15NFMU-A 15,000 BTU · Vrf Indoor ×2
MXZ-SM48NL-U1 48,000 BTU · Condensing Unit ×1
PEFY-L18MAU-A 18,000 BTU · Vrf Indoor ×1
3 projects · most recent 03/16/2026
FiledStatusContractorScope
03/16/2026Permit IssuedJTE ELECTRICAL SERVICES—
03/15/2026Permit IssuedOPTIMAL ELECTRIC, INC—
08/30/2018CompleteTOP SHELF ELECTRIC CORP—
2 projects · most recent 04/23/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/23/2026Permit IssuedPOWERS BRIDGING & SCAFFOLSidewalk Shed
03/24/2026Permit IssuedPOWERS BRIDGING & SCAFFOLScaffold
1 project · most recent 07/22/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/22/2025Permit IssuedSKYLINE RESTORATION INCTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/16/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
06/16/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/16/2026Maintenance informationVincent Liottaenergy_progress
06/16/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/16/2026Tenant Protection Plan ComplianceVincent Liottaspecial
05/06/2026Mechanical SystemsVincent Liottaspecial
05/06/2026FinalVincent Liottaprogress
02/18/2026Post-installed Anchorsnayan sonispecial
02/18/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
07/21/2025MasonryMichael Notarospecial
07/21/2025FinalMichael Notaroprogress
07/21/2025PreliminaryMichael Notaroprogress
07/21/2025Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
07/21/2025Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/21/2025Post-installed AnchorsMichael Notarospecial
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/06/2026M00075384-I1Request digital key ↗
08/22/2026M01258941-I1Request digital key ↗
08/19/2026M01342422-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION4
06/18/2020140907981Open ↗
06/12/2020140907981Open ↗
04/16/2019140763779Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/09/2020140907981Open ↗
07/06/2018140763779Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/12/2018140763779Open ↗
09/12/2018140763779Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M01258941-I1Open ↗
09/02/2026M01258941-I1Open ↗
08/26/2026M01398022-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00075384-I1Open ↗
08/18/2026M01367204-I1Open ↗
08/17/2026M01367203-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/29/2020140763779Open ↗
04/29/2020140763779Open ↗
04/29/2020140763779Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026M01258941-I1Open ↗
08/26/2026M01398022-I1Open ↗
08/26/2026M01398022-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
06/09/2020140907981Open ↗
05/08/2018140763779Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
06/09/2020140907981Open ↗
07/06/2018140763779Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/10/2021140907981Open ↗
06/18/2020140907981Open ↗
06/16/2020140907981Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/29/2020140763779Open ↗
04/29/2020140763779Open ↗
04/29/2020140763779Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/29/2020140763779Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/10/2021140907981Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/10/2021140907981Open ↗
06/18/2020140907981Open ↗
06/12/2020140907981Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/06/2026M00075384-I1Open ↗
08/16/2026M01398022-I1Open ↗
08/13/2026M01367203-P1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/10/2021140907981Open ↗
04/29/2020140763779Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
06/09/2020140907981Open ↗
04/29/2020140763779Open ↗
07/06/2018140763779Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/10/2021140907981Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
06/09/2020140907981Open ↗
05/08/2018140763779Open ↗
▸BISADDITIONAL INFORMATION2
07/20/2018140763779Open ↗
07/06/2018140763779Open ↗
▸BISBOROUGH INTAKE FORM1
04/29/2020140763779Open ↗
▸Other Documents6
▸DOB NOWCalculations2
08/13/2026M00988039-I1Open ↗
08/13/2026M01342422-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M00988039-I1Open ↗
08/13/2026M01342422-I1Open ↗
▸BISSupporting Document: Fee Exempt1
06/09/2020140907981Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/20/2018140763779Open ↗