← Back
Public elementary, junior or senior high
P.S. 3 the Margaret Gioiosa School
80 SOUTH GOFF AVENUE · BIN 5083311
💬 Discuss this project
1958Year Built
1Stories
W1Building Class
R3XZoning
58,555 sfGross Floor Area
1Units
18 Open Violations 5 unresolved · 13 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 154,285 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 4 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3407/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE PS 3 040803/22/2026
D.O.E. P.S.003 0203/22/2026
DEPT OF EDUCATION P.S. 3103/22/2026
DEPARTMENT OF EDUCATION803/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
DOE PS 3203/22/2026
BOARD OF EDUCATION 040103/22/2026
GENERATE CAPITAL PBC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAHN ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.A.M.S. MECHANICAL INCGeneral Contractor2107/08/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
DORION NORTON ELECL CONTElectrical103/22/2026
MAESTRO CONSTRUCTION CORP.General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT230501/21/2026
JPC LOGISTICS DBA JPCL EN351204/09/2025
Building Lifecycle
All (147)Filed (12)Permit Issued (21)Signed Off (5)Violation (60)Inspection (1)Objection (18)Special Inspection (30)
04/13/2026
Violation issued (ECB, open)
Construction
04/13/2026
Violation issued (ECB, open)
Construction
04/13/2026
Violation issued (ECB, open)
Construction
03/25/2026
Violation issued (FDNY_NOV, closed)
03/25/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
01/27/2026
Objection raised — Other
01/27/2026
Objection raised — Other
01/27/2026
Objection raised — Other
01/27/2026
Objection raised — Other
01/22/2026
Filed — Alteration
Storm water management and drainage system.
S01345170-S4
01/21/2026
Filed — Alteration
Storm water management and drainage system.
S01345170-S1
01/20/2026
Filed — Alteration
Storm water management and drainage system.
S01345170-S2
01/16/2026
Filed — Alteration
Storm water management and drainage system.
S01345170-I1
01/13/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
01/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
STEPHEN LATUS
01/12/2026
Special inspection requirement — Subgrade Inspections
STEPHEN LATUS
01/12/2026
Special inspection requirement — Concrete - Precast
STEPHEN LATUS
01/12/2026
Special inspection requirement — Final
STEPHEN LATUS
01/12/2026
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
12/09/2025
Signed off — Alteration
PS 003R, INSTALLATION OF A MOBILE TEMPORARY BOILER AND A 10000 GALLON OIL TANK SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 500876554. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00576539-S1
12/03/2025
Signed off — Alteration
PS 003R, INSTALLATION OF A MOBILE TEMPORARY BOILER AND A 10000 GALLON OIL TANK SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 500876554. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00576539-I1
10/28/2025
Signed off — Alteration
PS 003R, INSTALLATION OF A MOBILE TEMPORARY BOILER AND A 10000 GALLON OIL TANK SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 500876554. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00576539-S4
10/28/2025
Signed off — Alteration
PS 003R, INSTALLATION OF A MOBILE TEMPORARY BOILER AND A 10000 GALLON OIL TANK SUBMITTING ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 500876554. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00576539-S3
10/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB JOB # 500876242
S01176569-I1
07/15/2025
Violation issued (ECB, closed)
Construction
07/15/2025
Violation issued (ECB, open)
Construction
07/15/2025
Violation issued (ECB, open)
Construction
06/09/2025
Violation issued (FDNY_ORDER, closed)
05/06/2025
Objection resolved — Addressed
05/05/2025
Objection resolved — Addressed
05/01/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Plumbing
04/22/2025
Objection raised — Mechanical
04/22/2025
Objection raised — Admin
04/22/2025
Objection raised — Zoning
04/22/2025
Objection raised — Fire_Protection
04/17/2025
Permit issued — Supported Scaffold
S00576539-S1-SF
04/09/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE AUDITORIUM AND CAFETERIA.
S01185767-I1
04/09/2025
Violation issued (ECB, open)
Construction
03/27/2025
Permit issued — Construction Fence
S00576539-I1-FN
03/27/2025
Permit issued — Mechanical Systems
S00576539-S3-MS
03/25/2025
Permit issued — Construction Fence
S01176569-I1-FN
03/21/2025
Objection resolved — Addressed
02/25/2025
Violation issued (FDNY_NOV, closed)
02/25/2025
Violation issued (FDNY_NOV, closed)
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
02/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
02/25/2025
Special inspection requirement — Maintenance information
Asma Hashmi
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
02/24/2025
Special inspection requirement — Final
Asma Hashmi
02/24/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
02/24/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
02/21/2025
Objection raised — Other
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC04/17/2025
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC03/27/2025
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/27/2025
DOB NOWConstruction FenceSigned-offMAESTRO CONSTRUCTION CORP.03/25/2025
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC05/31/2024
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC03/29/2024
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC03/29/2024
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC03/09/2023
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/09/2023
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC03/07/2023
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC03/07/2023
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC03/29/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/28/2022
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC03/28/2022
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC03/07/2022
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC02/01/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC12/10/2021
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/09/2021
DOB NOWSupported ScaffoldSigned-offR.A.M.S. MECHANICAL INC11/15/2021
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC10/14/2021
DOB NOWConstruction FenceSigned-offR.A.M.S. MECHANICAL INC08/27/2021
BISOTISSUEDMAESTRO CONSTRUCTION CORP.07/15/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/28/2025
BISSPISSUEDVITAL PLUMBING, INC04/18/2025
BISOTISSUEDR.A.M.S. MECHANICAL INC04/04/2025
BISOTISSUEDR.A.M.S. MECHANICAL INC04/04/2025
BISOTISSUEDR.A.M.S. MECHANICAL INC04/04/2025
BISMHISSUEDR.A.M.S. MECHANICAL INC04/04/2025
BISPLISSUEDVITAL PLUMBING, INC03/26/2025
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/26/2025
BISOTISSUEDMAESTRO CONSTRUCTION CORP.03/26/2025
BISMHISSUEDR.A.M.S. MECHANICAL INC04/15/2024
BISOTISSUEDR.A.M.S. MECHANICAL INC04/15/2024
BISOTISSUEDR.A.M.S. MECHANICAL INC04/15/2024
BISOTISSUEDR.A.M.S. MECHANICAL INC04/15/2024
BISPLISSUEDMAR-SAL PLBG & HTG, INC01/18/2024
BISOTISSUEDR.A.M.S. MECHANICAL INC04/05/2023
BISOTISSUEDR.A.M.S. MECHANICAL INC04/05/2023
BISMHISSUEDR.A.M.S. MECHANICAL INC04/05/2023
BISOTISSUEDR.A.M.S. MECHANICAL INC04/05/2023
+ 31 more permits on file
2 projects · most recent 04/09/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/09/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×14
FUJITSU - AOU120RLAVL 120,000 BTU · Vrf Outdoor ×4
FUJITSU AOU72RLAV 72,000 BTU · Vrf Outdoor ×1
08/12/2024——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×6
AOU96RLAVL 96,000 BTU · Condensing Unit ×2
1 project · most recent 01/22/2026
Storm
FiledStatusContractorScope
01/22/2026——Storm
13 projects · most recent 02/02/2026
General Wiring Lighting
FiledStatusContractorScope
02/02/2026CompleteOHM'S ELECTRICAL CORPLighting
06/26/2025CompleteEVEREST ELECTRIC CORP—
04/23/2025CompleteEVEREST ELECTRIC CORP—
04/02/2025CompleteURBAN ELECTRICAL CORPGeneral Wiring
01/29/2024CompleteSUNKEEPER SOLAR LLC—
11/13/2023CompleteGEMINI ELECTRIC CO., INC.—
05/08/2023CompleteDYNAMO ELECTRICAL CORPGeneral Wiring
04/07/2023CompleteFALCON ELEC'L CONTR'G CORGeneral Wiring
09/23/2021CompleteFALCON ELEC'L CONTR'G COR—
11/27/2018CompleteDORION NORTON ELECL CONTGeneral Wiring
09/28/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
07/30/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
05/08/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 01/22/2026
FiledStatusContractorScope
01/22/2026——1 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/02/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/13/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
01/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/12/2026Subsurface Conditions – Fill Placement & In-Place DensitySTEPHEN LATUSspecial
01/12/2026Subgrade InspectionsSTEPHEN LATUSspecial
01/12/2026Concrete - PrecastSTEPHEN LATUSspecial
01/12/2026FinalSTEPHEN LATUSprogress
01/12/2026Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
02/25/2025Energy Code Compliance InspectionsAsma Hashmiprogress
02/25/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
02/25/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
02/25/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
02/25/2025Maintenance informationAsma Hashmienergy_progress
02/24/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
02/24/2025FinalAsma Hashmiprogress
02/24/2025Mechanical SystemsAsma Hashmispecial
02/24/2025Post-installed AnchorsAsma Hashmispecial
08/12/2024Energy Code Compliance InspectionsAsma Hashmiprogress
08/12/2024Maintenance informationAsma Hashmienergy_progress
08/08/2024Mechanical SystemsAsma Hashmispecial
08/08/2024Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/08/2024Post-installed AnchorsAsma Hashmispecial
08/08/2024FinalAsma Hashmiprogress
08/08/2024HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
08/08/2024HVAC-R and service water heating system controlsAsma Hashmienergy_progress
08/08/2024HVAC-R and service water heating equipmentAsma Hashmienergy_progress
Latest 25 of 33.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026S00576539-S3Request digital key ↗
08/25/2026S00576539-S4Request digital key ↗
08/25/2026S00576539-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
11/30/2023540261508Open ↗
09/07/2022500876554Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/26/2023540261508Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026S00576539-S1Open ↗
08/25/2026S00576539-S3Open ↗
08/25/2026S00576539-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026S00576539-S1Open ↗
08/28/2026S00576539-S3Open ↗
08/24/2026S00576539-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00576539-S3Open ↗
08/28/2026S00576539-S3Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/26/2023540261508Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/26/2023540261508Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/26/2023540261508Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026S01176569-I1Open ↗
08/13/2026S00576539-I1Open ↗
08/13/2026S00576539-S1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/26/2023540261508Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026S00576539-S3Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/11/2024540261508Open ↗
11/26/2023540261508Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/11/2024540261508Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/26/2023540261508Open ↗
▸BISNYCECC ANALYSIS1
11/26/2023540261508Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00576539-S3Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/11/2024540261508Open ↗
06/11/2024540261508Open ↗
11/26/2023540261508Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT1
08/13/2026S01345170-S4Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/25/2026S00576539-S3Open ↗
08/25/2026S00576539-P1Open ↗
08/25/2026S00576539-S4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/15/2026S01345170-S4Open ↗
08/15/2026S01345170-S2Open ↗
08/15/2026S01345170-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026S01176569-I1Open ↗
08/13/2026S00576539-I1Open ↗
08/13/2026S00576539-S1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/24/2024540261508Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/11/2024540261508Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
11/26/2023540261508Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/11/2024540261508Open ↗
11/26/2023540261508Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/26/2023540261508Open ↗
▸Other Documents21
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal15
08/15/2026S01345170-S4Open ↗
08/15/2026S01345170-S2Open ↗
08/15/2026S01345170-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/13/2026S00576539-I1Open ↗
08/13/2026S00576539-S1Open ↗
08/13/2026S01176569-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/24/2024540261508Open ↗