Office with commercial, 7-19 stories
Bryant Park Studios
1054 AVENUE OF THE AMER · BIN 1016060
💬 Discuss this project
1901Year Built
10Stories
O6Building Class
C6-4.5Zoning
61,304 sfGross Floor Area
30Units
LL97 Covered9 Open Violations 6 unresolved · 3 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 80 WEST STREET ASSOCIATES LLC · 5,950 sf lot · 10.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 4 filings · 20 docs
Floor 8Under Construction1 filing · 7 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Under Construction42p · 4 filings · 20 docs
Floor 2Under Construction1 filing · 7 docs
Floor 1
2 jobs · most recent 08/28/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2026Permit IssuedGOLDEN HVAC INCAir Conditioning Systems
Cooling
Mitsubishi Electric SUZ-AK60NL 5 tons · Condensing Unit ×2
SVZ-AP60NL 5 tons · Ahu ×2
10/12/2025Permit IssuedKING ROSE OF NY, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane NTXMSM48A182BA 48,000 BTU · Condensing Unit ×1
NTXMSM60A182BA 60,000 BTU · Condensing Unit ×1
PLFY-P24NBMU-ER2 24,000 BTU · Vrf Indoor ×1
TPEFYP054MA144A 54,000 BTU · Vrf Indoor ×1
TPLFYP005FM140A 5,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck SQ-80-VG 250 CFM · Exhaust Fan ×1
2 jobs · most recent 10/12/2025
Sprinkler System
FiledStatusContractorScope
10/12/2025Permit IssuedFIREQUEST CORPSprinkler System
05/12/2021Permit IssuedFULL CAPACITY FIRE CORP78 heads
2 jobs · most recent 10/12/2025
Water/Sanitary
FiledStatusContractorScope
10/12/2025Permit IssuedACCESS PLUMBING CORPWater/Sanitary
05/12/2021Signed-offEXPRESS PLBG SEWR AND WTRWater/Sanitary
4 jobs · most recent 01/23/2026
General Wiring Lighting
FiledStatusContractorScope
01/23/2026Permit IssuedALDONA FIRE PROTECTION INGeneral Wiring
08/30/2024Permit IssuedELECTL CONTG SOLUTIONS COGeneral Wiring, Lighting
12/06/2021CompleteARGON ELECTRICAL CORPGeneral Wiring
05/01/2019Permit IssuedPHILIP A. ROBINSONGeneral Wiring
1 job · most recent 08/11/2021
Scaffold
FiledStatusContractorScope
08/11/2021Permit IssuedSTEEL SYSTEMS LLCScaffold
Building Lifecycle
All (167)Filed (21)Permit Issued (20)Signed Off (11)Facade (FISP) (13)Violation (60)Inspection (12)Special Inspection (30)
09/21/2026
Permit issued — Mechanical Systems
M01371770-I1-MS
08/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/28/2026
Filed — Alteration
INSTALLATION OF SPLIT SYSTEMS ON FLOORS 002, 005, PENTHOUSE, AND THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01371770-I1
08/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Special inspection requirement — Maintenance information
Vincent Liotta
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
03/13/2026
Special inspection requirement — Final
Vincent Liotta
03/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/26/2025
Permit issued — Plumbing
M01266461-S1-PL
11/26/2025
Permit issued — Sprinklers
M01266461-S3-EW-SP
11/25/2025
Permit issued — General Construction
M01266461-I1-GC
11/25/2025
Permit issued — Mechanical Systems
M01266461-S2-MS
10/12/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy.
M01266461-S1
10/12/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy.
M01266461-S2
10/12/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy.
M01266461-S3
10/10/2025
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy.
M01266461-I1
08/13/2025
Special inspection requirement — Post-installed Anchors
Young Suh
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/13/2025
Special inspection requirement — Post-installed Anchors
Young Suh
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/13/2025
Special inspection requirement — Post-installed Anchors
Young Suh
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/08/2025
Special inspection requirement — Mechanical Systems
Young Suh
08/08/2025
Special inspection requirement — Sprinkler Systems
Young Suh
08/08/2025
Special inspection requirement — Final
Young Suh
08/06/2025
Signed off — Alteration
INSTALLATION OF 20 TON CAPACITY SPLIT SYSTEM ON FLOORS 008, 010, AND THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01149629-I1
08/05/2025
Special inspection requirement — Final
Young Suh
07/03/2025
Permit issued — Mechanical Systems
M01149629-I1-MS
06/30/2025
Filed — Alteration
INSTALLATION OF 20 TON CAPACITY SPLIT SYSTEM ON FLOORS 008, 010, AND THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01149629-I1
12/02/2024
Special inspection requirement — Mechanical Systems
Vincent Liotta
12/02/2024
Special inspection requirement — Final
Vincent Liotta
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2023
Signed off — Alteration
M00738224-I1
03/30/2023
Permit issued — Antenna
M00738224-I1-AN
09/23/2022
Filed — Alteration
M00738224-I1
05/25/2022
Cycle 9 facade report signed — SAFE
04/01/2022
Cycle 9 facade report submitted
03/21/2022
Cycle 9 facade inspection completed
02/02/2022
Signed off — Alteration
INTERIOR RENOVATION ON 3RD FLOOR. NEW PARTITIONS, GWB, TRIM & COSMETIC FINISHES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00480827-I1
02/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/02/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/26/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2021
Signed off — Alteration
MISC MECHANICAL WORK ON 3RD FLOOR. UPDATE EXISTING HVAC , REMOVE EXISTING DUCTWORK, RELOCATE EXISTING AIR HANDLING UNITS, NEW DUCTWORK & AIR TERMINAL, TIE-IN TO EXISITNG CONDENSORS. TO CHANGE TO EGRESS,OCCUPANCY OR USE
M00481385-I1
10/06/2021
Permit issued — Mechanical Systems
M00481385-I1-MS
09/22/2021
Filed — Alteration
MISC MECHANICAL WORK ON 3RD FLOOR. UPDATE EXISTING HVAC , REMOVE EXISTING DUCTWORK, RELOCATE EXISTING AIR HANDLING UNITS, NEW DUCTWORK & AIR TERMINAL, TIE-IN TO EXISITNG CONDENSORS. TO CHANGE TO EGRESS,OCCUPANCY OR USE
M00481385-P1
09/19/2021
Special inspection requirement — Maintenance information
Simon Schwartz
09/19/2021
Special inspection requirement — Mechanical Systems
Simon Schwartz
Latest 60 of 167 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOUNTAIN DEVELOPEMENT3309/22/2026
T-MOBILE307/08/2026
IDRISS DERMATOLOGY907/08/2026
STEEL SYSTEMS LLC703/22/2026
80 WEST STREET ASSOCIATES LLC703/22/2026
UNION SQUARE ASSOCIATES L103/22/2026
80 WEST 40TH STREET7903/22/2026
80 WEST 40 STREET3203/22/2026
GRAHAM RESTORATION CO.103/22/2026
80 WEST 40 ST ACCOC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
Rigid Structural Design, LLC203/21/2026
DVA Advisors303/21/2026
WILLIAM VITACCO ASSOCIATES203/21/2026
NEW YORK DESIGN ARHICTECTS1003/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRINCIPAL BUILDERS SOLUTIGeneral Contractor507/08/2026
FIVE TOWN NEON SIGN CO INScaffold407/08/2026
STEEL SYSTEMS LLCGeneral Contractor303/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor307/08/2026
KING ROSE OF NY, INCGeneral Contractor204/09/2026
GOLDEN HVAC INCGeneral Contractor209/22/2026
PALUMBO, LAWRENCEElectrical103/21/2026
SABRINO GIORLANDOElectrical103/21/2026
STEPHEN KOPECElectrical103/21/2026
WEISS, NORMANElectrical103/21/2026
FIREQUEST CORPFire Protection107/08/2026
DEAVER, WILLIAMElectrical103/21/2026
A. BONADUCE, INCGeneral Contractor107/08/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor107/08/2026
ACCESS PLUMBING CORPPlumbing107/08/2026
EXPRESS PLBG SEWR AND WTRPlumbing107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
DOUGHERTY, EDWARDElectrical103/21/2026
HILTON, TYRONEElectrical103/21/2026
KEMRAJ, DEVANANDElectrical103/21/2026
MAGUIRE, SHAWNElectrical103/21/2026
NORTON, DORIONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974208/28/2026
ALAN MARGOLIN & ASSOC423410/12/2025
R MARSAC CONSULTING LLC329109/23/2022
SIMON SCHWARTZ, P.E.2598309/22/2021
OPERA STUDIO ARCHITECTURE5970103/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGOLDEN HVAC INC09/21/2026
DOB NOWPlumbingPermit IssuedACCESS PLUMBING CORP11/26/2025
DOB NOWSprinklersPermit IssuedFIREQUEST CORP11/26/2025
DOB NOWGeneral ConstructionPermit IssuedKING ROSE OF NY, INC11/25/2025
DOB NOWMechanical SystemsPermit IssuedKING ROSE OF NY, INC11/25/2025
DOB NOWMechanical SystemsSigned-offGOLDEN HVAC INC07/03/2025
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC03/30/2023
DOB NOWMechanical SystemsSigned-offPRINCIPAL BUILDERS SOLUTI10/06/2021
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI09/17/2021
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC07/13/2021
DOB NOWSprinklersSigned-offEXPRESS PLBG SEWR AND WTR05/18/2021
DOB NOWSprinklersPermit IssuedFULL CAPACITY FIRE CORP05/17/2021
DOB NOWGeneral ConstructionSigned-offPRINCIPAL BUILDERS SOLUTI04/02/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC08/18/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC06/29/2020
DOB NOWSignSigned-offENRICO PASSARO07/30/2019
DOB NOWSignSigned-offENRICO PASSARO07/30/2019
DOB NOWSignSigned-offENRICO PASSARO07/29/2019
DOB NOWSignSigned-offENRICO PASSARO07/29/2019
DOB NOWConstruction FenceSigned-offA. BONADUCE, INC07/05/2019
BISOTISSUEDRICONDA MAINTENANCE INC02/04/2021
BISEQISSUEDEVEREST SCAFFOLDING INC09/21/2020
BISEQISSUEDEVEREST SCAFFOLDING INC09/15/2020
BISOTISSUEDA. BONADUCE, INC07/16/2020
BISOTISSUEDRICONDA MAINTENANCE INC02/03/2020
BISEQISSUEDRICONDA MAINTENANCE INC11/12/2019
BISEQISSUEDEVEREST SCAFFOLDING INC09/24/2019
BISOTISSUEDRICONDA MAINTENANCE INC06/21/2019
BISSPISSUEDPLUMBING NYC, INC06/03/2019
BISMHISSUEDA. BONADUCE, INC05/02/2019
BISPLISSUEDTRISTAR PLBG & HTG INC05/01/2019
BISOTISSUEDRICONDA MAINTENANCE INC03/28/2019
BISSPISSUEDBIG APPLE FIRE SPRKL CO I03/26/2019
BISOTISSUEDA. BONADUCE, INC12/19/2018
BISEQISSUEDRICONDA MAINTENANCE INC11/26/2018
BISEQISSUEDEVEREST SCAFFOLDING INC10/03/2018
BISEQISSUEDEVEREST SCAFFOLDING INC10/01/2018
BISMHISSUEDSKYLINE DEVELOPERS CONSTR09/21/2018
BISMHISSUEDSKYLINE DEVELOPERS CONSTR09/11/2018
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.08/07/2018
+ 30 more permits on file
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
07/20/2026Maintenance informationVincent Liottaenergy_progress
07/20/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
07/20/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
07/20/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
03/13/2026Mechanical SystemsVincent Liottaspecial
03/13/2026FinalVincent Liottaprogress
08/13/2025Post-installed AnchorsYoung Suhspecial
08/13/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2025Post-installed AnchorsYoung Suhspecial
08/13/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/13/2025Post-installed AnchorsYoung Suhspecial
08/13/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
08/08/2025Mechanical SystemsYoung Suhspecial
08/08/2025Sprinkler SystemsYoung Suhspecial
08/08/2025FinalYoung Suhprogress
08/05/2025FinalYoung Suhprogress
12/02/2024Mechanical SystemsVincent Liottaspecial
12/02/2024FinalVincent Liottaprogress
09/19/2021Maintenance informationSimon Schwartzenergy_progress
09/19/2021Mechanical SystemsSimon Schwartzspecial
09/19/2021Energy Code Compliance InspectionsSimon Schwartzprogress
09/19/2021FinalSimon Schwartzprogress
09/19/2021HVAC-R and service water heating equipmentSimon Schwartzenergy_progress
09/19/2021HVAC-R and service water heating system controlsSimon Schwartzenergy_progress
Latest 25 of 38.
▾Documents — 797 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch14
09/06/2026M00066169-I1Request digital key ↗
09/04/2026M00480827-I1Request digital key ↗
09/03/2026M00481435-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/05/2026M00196688-I1Request digital key ↗
09/05/2026M00196592-I1Request digital key ↗
09/05/2026M00196623-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00335256-I1Request digital key ↗
09/04/2026M00386122-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00146881-I1Request digital key ↗
▸Applications & Permits141
▸BISPLAN / WORK APPROVAL APPLICATION68
05/17/2022104611029Open ↗
02/26/2020123738125Open ↗
12/11/2019123844849Open ↗
Showing 3 of 68 on file for this type
▸BISWORK PERMIT APPLICATION58
06/09/2021123683745Open ↗
09/16/2020140704619Open ↗
09/24/2019140704619Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWLPC Approval/Permit14
09/03/2026M00481385-I1Open ↗
09/01/2026M01371770-I1Open ↗
08/13/2026M01149629-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT IV: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION107
01/06/2020123546966Open ↗
01/06/2020123546966Open ↗
12/11/2019123844849Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00146881-I1Open ↗
09/05/2026M00196592-I1Open ↗
09/04/2026M00335256-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M01371770-I1Open ↗
09/23/2026M01371770-I1Open ↗
09/23/2026M01266461-S2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
02/20/2019123683745Open ↗
12/06/2018123594351Open ↗
09/05/2018123546966Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
02/20/2019123683745Open ↗
12/06/2018123594351Open ↗
11/20/2018140819096Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M01371770-I1Open ↗
09/23/2026M01266461-S2Open ↗
09/23/2026M01149629-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
11/20/2018140819096Open ↗
10/11/2017140705903Open ↗
10/08/2017140704619Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
11/20/2018140819096Open ↗
10/11/2017140705903Open ↗
10/08/2017140704619Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISEQUIPMENT USE PERMITS11
10/07/2020123594351Open ↗
10/01/2020123594351Open ↗
Showing 2 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
10/07/2020123594351Open ↗
10/01/2020123594351Open ↗
Showing 2 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/29/2019123546966Open ↗
10/25/2019123546966Open ↗
04/03/2019123594351Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
02/06/2024123738125Open ↗
Showing 1 of 4 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos51
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
12/12/2019123844849Open ↗
04/23/2019123738125Open ↗
12/06/2018123594351Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00481385-I1Open ↗
09/01/2026M00738224-I1Open ↗
09/01/2026M01371770-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0298MN191
03/30/2022123683745Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
12/11/2019123844849Open ↗
04/22/2019123295344Open ↗
02/20/2019123683745Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
03/31/2022123683745Open ↗
03/29/2022123683745Open ↗
10/01/2020123594351Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/29/2022123683745Open ↗
10/01/2020123594351Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00481385-I1Open ↗
08/13/2026M00480827-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/08/2017140704619Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY18
05/12/2022104611029Open ↗
04/04/2022123683745Open ↗
03/31/2022123683745Open ↗
Showing 3 of 18 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/12/2022104611029Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
08/27/2019123594351Open ↗
▸Approvals, Objections & Sign-offs107
▸BISLANDMARKS APPROVAL45
07/23/2019123594351Open ↗
02/20/2019123683745Open ↗
12/06/2018123594351Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
04/07/2022123683745Open ↗
09/03/2021140705903Open ↗
09/03/2021140704619Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/16/2020140704619Open ↗
09/16/2020140704619Open ↗
09/24/2019140704619Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS SIGNOFF5
04/07/2022123683745Open ↗
09/03/2021140705903Open ↗
09/03/2021140704619Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
06/09/2021123683745Open ↗
▸Cost, Insurance & Ownership58
▸BISCOST AFFIDAVIT57
03/31/2022123683745Open ↗
03/29/2022123683745Open ↗
01/06/2020123546966Open ↗
Showing 3 of 57 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/12/2022104611029Open ↗
▸Filing & Intake Forms77
▸BISEFILING COVER SHEET31
12/11/2019123844849Open ↗
04/23/2019123738125Open ↗
02/20/2019123683745Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION24
08/07/2020123594351Open ↗
10/29/2019123546966Open ↗
07/23/2019123594351Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM14
06/09/2021123683745Open ↗
09/16/2020140704619Open ↗
01/06/2020123546966Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
11/20/2018140819096Open ↗
10/11/2017140705903Open ↗
10/08/2017140704619Open ↗
Showing 3 of 8 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
10/04/2018140704619Open ↗
Showing 1 of 6 on file for this type
▸BISPHOTOLUMINESCENT EXIT PATH MARKINGS3
09/16/2020140704619Open ↗
09/16/2020140704619Open ↗
09/16/2020140704619Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M01266461-I1Open ↗