← Back
Walk-up apt, over six families with stores
80 WEST 82 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031157
💬 Discuss this project
1891Year Built
5Stories
C7Building Class
C1-8AZoning
12,780 sfGross Floor Area
12Units
Rent Stabilized22 Open Violations 19 unresolved · 3 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: WALBER 82ND ST ASSOCTES · 3,065 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivil
Floor 511p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 13p · 1 filing · 4 docs
Site & exterior9p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALBER 82ND STREET ASSOCIATES803/22/2026
PLATINUM SERVICES NY707/08/2026
ABC REALTY707/08/2026
155 PERRY ST CONDOMINIUM303/22/2026
ABC MANAGEMENT303/21/2026
WALKBR303/21/2026
WALTER & SAMUELS INC103/21/2026
WALBER 82 ST ASSOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC305/30/2024
LANE ENGINEERING CONSULTING, P.C.105/23/2023
ASHRAF CORP204/13/2023
GUARDIA ARCHITECTS107/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO403/21/2026
CITY WIDE EXPEDITING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
POLCON CONSTRUCTION AND RGeneral Contractor203/21/2026
EXECUTIVE BUILDINGGeneral Contractor107/08/2026
HERMAN LAMBEYElectrical103/21/2026
BLAZE PLUMBING & HEATINGPlumbing107/08/2026
JOHN VALENCIAElectrical103/21/2026
M&T ELECTRICAL LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422210/31/2023
LANE ENGINEERING CONSULTI2967105/23/2023
Building Lifecycle
All (94)Filed (7)Permit Issued (6)Signed Off (3)Violation (56)Inspection (5)Special Inspection (17)
08/26/2026
Violation issued (HPD, open)
C
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
04/16/2026
Violation issued (HPD, open)
A
12/28/2025
Violation issued (HPD, open)
C
12/28/2025
Violation issued (HPD, open)
C
08/06/2025
Violation issued (HPD, open)
B
08/06/2025
Violation issued (HPD, closed)
C
08/06/2025
Violation issued (HPD, open)
B
06/11/2025
Violation issued (HPD, open)
B
06/11/2025
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
B
06/11/2025
Violation issued (HPD, open)
B
06/11/2025
Violation issued (HPD, open)
B
06/11/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, closed)
A
05/28/2025
Violation issued (HPD, open)
C
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
B
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5C ON FIFTH FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00951805-I1
05/31/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
05/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
05/31/2024
Special inspection requirement — Final
SERDAR CEYLAN
05/31/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
05/30/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5C ON FIFTH FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00951805-P1
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/28/2024
Special inspection requirement — Final
SERDAR CEYLAN
05/28/2024
Special inspection requirement — Interior lighting power
SERDAR CEYLAN
05/28/2024
Special inspection requirement — Lighting controls
SERDAR CEYLAN
05/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2024
Permit issued — Plumbing
M00951817-I1-PL
12/14/2023
Permit issued — General Construction
M00951805-I1-GC
12/01/2023
Signed off — Alteration
M00852163-I1
12/01/2023
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND SHORING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08042088-I1
11/15/2023
Violation issued (HPD, closed)
I
10/31/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5C ON FIFTH FLOOR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00951805-I1
10/31/2023
Filed — Alteration
PLUMBING WORK TYPE IS FILED IN CONJUNCTION WITH #M00951805-I1 AS PER PLANS SUBMITTED. NO CHAGE IN USE, EGRESS OR OCCUPANCY.
M00951817-I1
10/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
10/30/2023
Special inspection requirement — Tenant Protection Plan Compliance
SERDAR CEYLAN
06/12/2023
Permit issued — General Construction
M00859182-I1-GC
05/23/2023
Filed — Alteration
M00859182-I1
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
05/23/2023
Special inspection requirement — Masonry
Douglas Lane
05/23/2023
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
05/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
04/14/2023
Permit issued — Supported Scaffold
M00852163-I1-SF
04/13/2023
Filed — Alteration
M00852163-I1
04/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Douglas Lane
04/13/2023
Special inspection requirement — Final
Douglas Lane
03/16/2023
Violation issued (HPD, closed)
A
12/15/2022
Permit issued — Sidewalk Shed
M08042088-I1-SH
12/14/2022
Filed — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AND SHORING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08042088-I1
11/02/2022
Violation issued (HPD, closed)
I
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING03/04/2024
DOB NOWGeneral ConstructionSigned-offMKNK WASTE REMOVAL INC12/14/2023
DOB NOWGeneral ConstructionPermit IssuedEXECUTIVE BUILDING06/12/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/14/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/15/2022
DOB NOWGeneral ConstructionSigned-offPOLCON CONSTRUCTION AND R06/10/2022
BISPLISSUEDALL HOUR SEWER SERVICE CO.04/18/2019
BISOTISSUEDOZ BOSPH CONSTRUCTION COR04/10/2019
BISOTISSUEDDUAL FUEL COMPANY LLC01/11/2018
BISBLISSUEDDUAL FUEL PLUBING & HTING08/09/2017
BISPLISSUEDDUAL FUEL PLUBING & HTING08/09/2017
BISOTISSUEDJERRICK ASSOCIATES INC07/31/2008
BISEQISSUEDCSC OF NY08/09/2007
BISFSISSUEDC C CONTROLLED COMBUSTION01/11/2005
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC02/26/1996
BISOTISSUEDR.D. MORTMAN CO.02/26/1996
BIS—ISSUEDVINCENT CASCONE CONT.11/08/1990
1 project · most recent 10/31/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/31/2023Permit IssuedBLAZE PLUMBING & HEATINGGas, Water/Sanitary
3 projects · most recent 05/20/2024
General Wiring
FiledStatusContractorScope
05/20/2024CompleteM&T ELECTRICAL LLCGeneral Wiring
11/28/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
04/26/2019Permit IssuedL&B ELEC'L INTERNATIONALGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/31/2024Lighting controlsSERDAR CEYLANenergy_progress
05/31/2024Tenant Protection Plan ComplianceSERDAR CEYLANspecial
05/31/2024FinalSERDAR CEYLANprogress
05/31/2024Interior lighting powerSERDAR CEYLANenergy_progress
05/29/2024Tenant Protection Plan Compliance—special
05/28/2024FinalSERDAR CEYLANprogress
05/28/2024Interior lighting powerSERDAR CEYLANenergy_progress
05/28/2024Lighting controlsSERDAR CEYLANenergy_progress
10/31/2023HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
10/31/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
10/30/2023Tenant Protection Plan ComplianceSERDAR CEYLANspecial
05/23/2023Energy Code Compliance InspectionsDouglas Laneprogress
05/23/2023MasonryDouglas Lanespecial
05/23/2023Air barrier - visual inspectionDouglas Laneenergy_progress
05/23/2023Structural Stability – Alterations of existing buildingsDouglas Lanespecial
04/13/2023Tenant Protection Plan ComplianceDouglas Lanespecial
04/13/2023FinalDouglas Laneprogress
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00557091-I1Request digital key ↗
09/01/2026M08042088-I1Request digital key ↗
08/31/2026M00852163-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION7
04/19/2019123708327Open ↗
04/10/2019123708327Open ↗
01/10/2018140729996Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00951817-P1Open ↗
08/13/2026M00859182-I1Open ↗
08/13/2026M00951817-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
04/10/2019123708327Open ↗
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature9
09/29/2026M00859182-I1Open ↗
09/29/2026M00859182-I1Open ↗
09/29/2026M00859182-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/10/2019123708327Open ↗
04/11/2018140678693Open ↗
04/11/2018140678693Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00557091-I1Open ↗
08/31/2026M00859182-I1Open ↗
08/28/2026M00951817-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/29/2026M00859182-I1Open ↗
09/29/2026M00859182-I1Open ↗
09/29/2026M00859182-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/10/2019123708327Open ↗
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/10/2019123708327Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/08/2017140678693Open ↗
▸BISSCHEDULE B - PLUMBING1
08/08/2017140678693Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/10/2019123708327Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES3
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
04/10/2019123708327Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
04/10/2019123708327Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00557091-I1Open ↗
08/31/2026M00859182-I1Open ↗
08/28/2026M00951817-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/10/2019123708327Open ↗
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/02/2009110464845Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/21/2008110210245Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/10/2019123708327Open ↗
04/11/2018140729996Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/11/2018140678693Open ↗
04/11/2018140729996Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/11/2018140678693Open ↗
04/11/2018140678693Open ↗
04/11/2018140729996Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/11/2018140678693Open ↗
04/11/2018140729996Open ↗
▸BISLANDMARKS APPROVAL2
04/10/2019123708327Open ↗
04/11/2018140729996Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/02/2009110464845Open ↗
07/21/2008110210245Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
04/10/2019123708327Open ↗
04/11/2018140678693Open ↗
04/11/2018140729996Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
04/30/2009110464845Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET2
01/10/2018140729996Open ↗
08/08/2017140678693Open ↗
▸BISBOROUGH INTAKE FORM2
04/11/2018140678693Open ↗
04/11/2018140729996Open ↗
▸BISEFILING COVER SHEET2
04/10/2019123708327Open ↗
03/02/2009110464845Open ↗