← Back
BuildNYC
Elevator apt, luxury type
800 5TH AVENUE
MANHATTAN · BIN 1078315
💬 Discuss this project
1979Year Built
33Stories
D8Building Class
R10Zoning
355,978 sfGross Floor Area
234Units
LL97 CoveredRent Stabilized52 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, luxury type · Owner of record: 800 Fifth Ave Property Owner · 28,235 sf lot · 12.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNaftali GroupUnder Construction2 filings
RoofRose Associates1p · 1 filing · 6 docs
Floor 5Fixture relocation and removal3p · 3 filings
Floor 4
Floor 3Doctors office mechanical system alteration2 filings
Floor 2Medical office fit out with new plumbing fixtures1 filing
Floor 1Rose Associates5p · 9 filings
CellarRose Associates7p · 7 filings
Sub-CellarRose Associates3p · 1 filing
Site & exteriorRose Associates2 filings · 5 docs
Filed — no permit issuedNaftali Group1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
615 Building Company6403/21/2026
Spitzer Entrerprises4207/08/2026
615 Company1203/21/2026
Naftali Group610/13/2026
Tribute203/21/2026
800 Fifth Ave Property Owner103/22/2026
NY Developers103/21/2026
Rizzuto103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2025$810.0M—800 FIFTH AVENUE ASSOCIATES LLC → 800 FIFTH AVE PROPERTY OWNER LLC$2,275/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ancora Engineering210/08/2026
SLCE Architects109/24/2026
Ecc508/25/2026
Mihai Radu Architects502/13/2025
Richard Kornblau1101/05/2025
Vincent J. Liotta P.E110/31/2024
Stone208/29/2024
AR Consulting Engineer101/11/2022
IP Group401/07/2022
Diversified Design Associates-Architects101/06/2022
FL&M Engineering Design & Inspection112/21/2021
E4P Consulting Engineering212/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants1103/21/2026
J A Expediting1003/21/2026
Stone403/21/2026
PS Engineers203/21/2026
Code403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vino ConstructionGeneral Contractor807/08/2026
Core Four ConstructionGeneral Contractor507/08/2026
Millenium Cent ContractingGeneral Contractor407/08/2026
Metro Fire ControlPlumbing303/22/2026
Spring ScaffoldingScaffold303/21/2026
Mega PlumbingPlumbing307/08/2026
HF Group Plumbing & SpnklerFire Protection207/08/2026
Centennial Elevator IndustriesElectrical203/21/2026
Metflow Fire ControlFire Protection207/08/2026
SKH MechanicalFire Protection207/08/2026
Tribute Restorationspecialty_contractor203/21/2026
Aqua Plumbing & HeatingPlumbing207/08/2026
Mac Elect'l ContractingElectrical103/22/2026
Zatos Plumbing and HeatingPlumbing107/08/2026
J.r.best ElectricElectrical103/21/2026
Affiliated ElectricalElectrical103/21/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
First Quality ElectricElectrical103/21/2026
Afgo Mechanical Servicesspecialty_contractor107/08/2026
Prodigy ConstructionGeneral Contractor107/08/2026
Superior HVACspecialty_contractor107/08/2026
Volk Industrial ServicesGeneral Contractor104/10/2026
Tribute RestorationScaffold107/08/2026
ApecPlumbing107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843308/25/2026
Ancora Engineering6818106/15/2026
Alan Margolin & Associates423402/13/2025
Richard B. Kornblau, AIA3208601/05/2025
Richard H. Balser Engineering3028301/05/2025
Vincent J. Liotta P. E1974110/31/2024
Metric Consulting and Ins1803208/29/2024
AR Consulting Engineer P4054101/11/2022
IP Group2542301/07/2022
Diversified Design Associates3403301/07/2022
HT Engineering6274212/06/2019
Building Lifecycle
All (210)Filed (36)Permit Issued (29)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (9)Objection (19)Special Inspection (30)
10/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Partial demolition of structure from floors 6 -33, using hand held and mechamical means to assist.
M01457046-S2
09/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Partial demolition of structure from floors 6 -33, using hand held and mechamical means to assist.
M01457046-I1
09/18/2026
Special inspection requirement — Final
08/25/2026
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS AND MECHANICAL EQUIPMENT. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
M01364355-P3
08/20/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/13/2026
Violation issued (ECB, open)
Site Safety
08/13/2026
Violation issued (ECB, open)
Unknown
08/13/2026
Violation issued (ECB, closed)
Unknown
08/05/2026
Objection raised — Admin
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
08/04/2026
Violation issued (HPD, open)
C
07/15/2026
Objection resolved — Addressed
07/14/2026
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS AND MECHANICAL EQUIPMENT. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
M01364355-P1
07/14/2026
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS AND MECHANICAL EQUIPMENT. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
M01364355-P2
07/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2026
Objection raised — Admin
06/15/2026
Filed — Full Demolition
Removing floors 6-33, using hand held and mechanical to assist from within. Elements to remain sub-cellar through 5.
M01414585-I1
06/09/2026
Special inspection requirement — Demolition
Gregory Moormann
06/09/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Gregory Moormann
05/19/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
05/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/19/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/08/2026
Permit issued — General Construction
M01364355-I1-GC-CX
03/30/2026
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS AND MECHANICAL EQUIPMENT. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
M01364355-S1
03/30/2026
Filed — Alteration
REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS AND MECHANICAL EQUIPMENT. THERE IS NO CHANGE TO USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
M01364355-I1
03/07/2025
Signed off — Alteration
Installation of sprinkler heads as per plans filed herewith.
M00370913-I1
03/04/2025
Signed off — Alteration
New interior partitions, light fixtures, appliances, plumbing fixtures and life safety equipment. Work inside suite 205 only.
M00858583-I1
02/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2025
Filed — Alteration
New interior partitions, light fixtures, appliances, plumbing fixtures and life safety equipment. Work inside suite 205 only.
M00858583-P3
02/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/11/2025
Special inspection requirement — Mechanical Systems
Young Suh
02/11/2025
Special inspection requirement — Final
Young Suh
01/21/2025
Signed off — Alteration
REPLACEMENT OF 2 COOLING TOWERS ON ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01106026-I1
01/14/2025
Signed off — Alteration
New interior partitions, light fixtures, appliances, plumbing fixtures and life safety equipment. Work inside suite 205 only.
M00858583-S1
01/09/2025
Permit issued — Sprinklers
M00370913-I1-EW-SP
01/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVolk Industrial Services04/08/2026
DOB NOWSprinklersSigned-offMetflow Fire Control01/09/2025
DOB NOWGeneral ConstructionSigned-offCore Four Construction12/30/2024
DOB NOWMechanical SystemsSigned-offCore Four Construction12/16/2024
DOB NOWMechanical SystemsSigned-offAfgo Mechanical Services11/15/2024
DOB NOWPlumbingSigned-offMega Plumbing09/25/2024
DOB NOWStructuralPermit IssuedTribute Restoration09/04/2024
DOB NOWPlumbingSigned-offMega Plumbing08/10/2023
DOB NOWGeneral ConstructionSigned-offCore Four Construction08/01/2023
DOB NOWSprinklersSigned-offMetflow Fire Control05/10/2023
DOB NOWSprinklersPermit IssuedSKH Mechanical07/15/2022
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler04/06/2022
DOB NOWPlumbingSigned-offZatos Plumbing and Heating02/10/2022
DOB NOWMechanical SystemsSigned-offSuperior HVAC02/09/2022
DOB NOWGeneral ConstructionSigned-offProdigy Construction01/27/2022
DOB NOWSupported ScaffoldPermit IssuedTribute Restoration01/12/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/23/2021
DOB NOWMechanical SystemsSigned-offVino Construction07/06/2021
DOB NOWGeneral ConstructionSigned-offVino Construction07/06/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating04/30/2021
DOB NOWPlumbingSigned-offSmart Plumbing & Heating03/08/2021
DOB NOWSprinklersSigned-offHF Group Plumbing & Spnkler03/08/2021
DOB NOWMechanical SystemsSigned-offVino Construction02/19/2021
DOB NOWGeneral ConstructionSigned-offVino Construction02/18/2021
DOB NOWSprinklersPermit IssuedSKH Mechanical01/25/2021
DOB NOWMechanical SystemsSigned-offMillenium Cent Contracting01/06/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating01/05/2021
DOB NOWPlumbingSigned-offApec01/27/2020
DOB NOWMechanical SystemsSigned-offMillenium Cent Contracting01/06/2020
BISOTISSUEDPrecision Worldwide01/04/2021
BISOTISSUEDPrecision Worldwide12/03/2020
BISOTISSUEDPrecision Worldwide11/30/2020
BISOTISSUEDLumitech Contracting10/26/2020
BISOTISSUEDLumitech Contracting10/19/2020
BISOTISSUEDPrecision Worldwide09/18/2020
BISOTISSUEDMillenium Cent Contracting05/14/2020
BISOTISSUEDMillenium Cent Contracting11/12/2019
BISEQISSUEDSpring Scaffolding08/17/2017
BISOTISSUEDTribute Restoration08/11/2017
BISEQISSUEDTribute Restoration08/04/2017
+ 39 more permits on file
2 projects · most recent 08/25/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026Permit IssuedVolk Industrial ServicesHeating and Air Conditioning Systems
Heat / Cool
General Electric GE Zoneline PTAC 12,000 BTU · Ptac ×1,462
08/19/2020——Air Conditioning Systems
Cooling
Florida Heat Pump CA015 13,000 BTU · Wshp ×1
LV030 26,000 BTU · Wshp ×1
1 project · most recent 08/25/2026
Water/Sanitary
FiledStatusContractorScope
08/25/2026——Water/Sanitary
9 projects · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024Permit IssuedCentennial Elevator IndustriesGeneral Wiring
07/28/2023CompleteTM Select ElectricGeneral Wiring
12/22/2021CompleteTop Shelf Electric—
08/02/2021Permit IssuedRobert Chimenti2 meters, 1 new_meters
06/01/2021CompleteMLS ElectricGeneral Wiring
03/02/2021CompleteMac Elect'l ContractingGeneral Wiring
01/05/2021Permit IssuedControl Spec Electrical SystemGeneral Wiring
11/24/2020CompleteA&E Electrical Systems CoGeneral Wiring
03/01/2019CompleteResponse ElectricGeneral Wiring
2 projects · most recent 10/08/2026
Concrete
FiledStatusContractorScope
10/08/2026——1 scope_items
08/29/2024Permit IssuedTribute RestorationConcrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
09/18/2026Final—progress
08/20/2026Mechanical SystemsJOHN MCMONAGLEspecial
08/20/2026Tenant Protection Plan Compliance—special
08/20/2026FinalJOHN MCMONAGLEprogress
07/14/2026Tenant Protection Plan Compliance—special
06/09/2026DemolitionGregory Moormannspecial
06/09/2026Structural Stability – Alterations of existing BuildingsGregory Moormannspecial
05/19/2026Tenant Protection Plan Compliance—special
05/19/2026FinalJOHN MCMONAGLEprogress
05/19/2026Mechanical SystemsJOHN MCMONAGLEspecial
02/11/2025Mechanical SystemsYoung Suhspecial
02/11/2025FinalYoung Suhprogress
11/14/2024Mechanical SystemsYoung Suhspecial
11/14/2024FinalYoung Suhprogress
10/30/2024HVAC-R and service water heating equipmentVincent Liottaenergy_progress
10/30/2024Maintenance informationVincent Liottaenergy_progress
10/30/2024HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
10/30/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
09/04/2024FinalVincent Liottaprogress
09/04/2024Mechanical SystemsVincent Liottaspecial
09/03/2024FinalEvan Petkanasprogress
09/03/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/03/2024Post-installed AnchorsSAMI HAJJAR P.Especial
09/03/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/28/2024Post-installed AnchorsSAMI HAJJAR P.Especial
Latest 25 of 64.
▾Documents — 856 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch18
09/03/2026M00651429-I1Request digital key ↗
09/03/2026M00590531-I1Request digital key ↗
09/03/2026M00590536-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00256417-I1Request digital key ↗
09/03/2026M00369605-I1Request digital key ↗
09/02/2026M00453929-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/04/2026M00375966-I1Request digital key ↗
09/04/2026M00453934-I1Request digital key ↗
08/25/2026M00370913-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00256458-I1Request digital key ↗
09/04/2026M00453909-I1Request digital key ↗
08/15/2026M00375965-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00453904-P1Request digital key ↗
09/04/2026M00453904-I1Request digital key ↗
▸Applications & Permits158
▸BISWORK PERMIT APPLICATION68
11/30/2020123739491Open ↗
10/19/2020140935656Open ↗
09/18/2020140953029Open ↗
Showing 3 of 68 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION62
11/25/2024140953029Open ↗
09/16/2020140953029Open ↗
08/07/2020140935656Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWLPC Approval/Permit28
10/04/2026M01457046-S2Open ↗
09/10/2026M01364355-P3Open ↗
09/05/2026M00256458-I1Open ↗
Showing 3 of 28 on file for this type
▸Seals & Professional Certifications191
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION82
11/07/2019123739491Open ↗
07/23/2018123118483Open ↗
06/22/2018140640938Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
10/04/2026M01457046-S2Open ↗
10/04/2026M01457046-I1Open ↗
09/10/2026M01364355-P3Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/18/2026M00590536-I1Open ↗
10/18/2026M00590536-I1Open ↗
09/23/2026M01364355-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
10/18/2026M00590536-I1Open ↗
09/23/2026M01364355-P3Open ↗
09/02/2026M01062332-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
09/16/2020140953029Open ↗
11/07/2019123739491Open ↗
08/21/2017123118483Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/07/2019123739491Open ↗
08/21/2017123118483Open ↗
03/24/2017123055638Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/16/2020140953029Open ↗
08/07/2020140935656Open ↗
05/11/2017140640938Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/16/2020140953029Open ↗
05/11/2017140640938Open ↗
03/07/2017140613254Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2020140935656Open ↗
▸Trade Schedules & Equipment61
▸BISSELF-CERT PLUMBING NOTICE27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/24/2017122674374Open ↗
01/20/2017122674374Open ↗
04/20/2016122674374Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/13/2018122604672Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection16
▸DOB NOWTenant Protection Plan9
09/05/2026M00256458-I1Open ↗
08/25/2026M00370913-I1Open ↗
08/13/2026M00375966-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES7
09/16/2020140953029Open ↗
08/07/2020140935656Open ↗
05/11/2017140640938Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos55
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/10/2026M01364355-P3Open ↗
09/05/2026M00256458-I1Open ↗
09/04/2026M00453904-P1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
09/16/2020140953029Open ↗
11/07/2019123739491Open ↗
08/21/2017123118483Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00858583-I1Open ↗
08/13/2026M00858583-S1Open ↗
▸Energy Compliance84
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
05/08/2018122866513Open ↗
05/01/2018122604672Open ↗
05/01/2018122604672Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS21
03/25/2025140953029Open ↗
03/24/2025140953029Open ↗
03/07/2025140953029Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/25/2025140953029Open ↗
03/24/2025140953029Open ↗
03/07/2025140953029Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00590536-I1Open ↗
08/14/2026M00590527-I1Open ↗
08/13/2026M00453904-I1Open ↗
Showing 3 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
03/07/2017140613254Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/16/2020140953029Open ↗
08/07/2020140935656Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/25/2025140953029Open ↗
03/24/2025140953029Open ↗
03/07/2025140953029Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
11/30/2016122674374Open ↗
▸Approvals, Objections & Sign-offs95
▸BISLANDMARKS APPROVAL39
09/16/2020140953029Open ↗
08/31/2020140935656Open ↗
11/08/2019123739491Open ↗
Showing 3 of 39 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
03/26/2025140953029Open ↗
08/23/2022123739491Open ↗
10/28/2021140935656Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/08/2018122866513Open ↗
08/21/2017123118483Open ↗
08/10/2017140640938Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
08/23/2022123739491Open ↗
10/19/2020140935656Open ↗
▸BISLANDMARKS SIGNOFF1
08/23/2022123739491Open ↗
▸BISSUPERSEDING LETTER1
08/24/2017122866513Open ↗
▸DOB NOWLandmark Approval1
08/14/2026M01414585-I1Open ↗
▸Cost, Insurance & Ownership71
▸BISCOST AFFIDAVIT67
03/25/2025140953029Open ↗
03/24/2025140953029Open ↗
03/07/2025140953029Open ↗
Showing 3 of 67 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/22/2022123739491Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/07/2020140935656Open ↗
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET26
11/07/2019123739491Open ↗
08/21/2017123118483Open ↗
03/24/2017123055638Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION22
11/07/2019123739491Open ↗
08/21/2017123055638Open ↗
05/12/2017123055638Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM9
08/01/2018122674374Open ↗
07/23/2018123118483Open ↗
06/22/2018140640938Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/16/2020140953029Open ↗
08/07/2020140935656Open ↗
05/11/2017140640938Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/31/2020140935656Open ↗
04/13/2018122604672Open ↗
▸DOB NOWSite Survey: Initial2
10/04/2026M01457046-I1Open ↗
10/04/2026M01457046-S2Open ↗
▸DOB NOWDHCR Document2
09/04/2026M00453934-I1Open ↗
08/13/2026M00369605-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructure Photographs1
08/14/2026M01414585-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026M01414585-I1Open ↗