← Back
BuildNYC
BRONX
800 CONCOURSE VILLAGE WEST
BRONX · BIN 2101572
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized459 Active Violations 447 unresolved · 12 paperwork only 6 old, status unconfirmed ▸FISP: SAFE
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Concourse Village2403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cornerstone207/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Northeast Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S E Bridge ScaffoldGeneral Contractor203/21/2026
AM G WaterproofingGeneral Contractor203/21/2026
Proto Restoration ConstructionGeneral Contractor107/08/2026
Rockledge ScaffoldGeneral Contractor103/21/2026
S E MaintenanceGeneral Contractor103/21/2026
Summit DevelopmentGeneral Contractor103/21/2026
Xinos ConstructionGeneral Contractor103/21/2026
Controlled PlumbingGeneral Contractor105/11/2004
Controlled PlumbingPlumbing105/11/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481207/11/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
10/26/2026
Owner responsibility:diagonal cracks and missing stirrups were found in podium beams.remedy:immediately shore questionable beams at public…
DOB violation · open
10/26/2026
Owner responsibility: pile caps supporting the residential buildings and podium structure above are in a state of disrepair.remedy:complete all…
DOB violation · open
08/31/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY
HPD violation · open
08/31/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SLOP SINK AT COMPACTOR CLOSET, 2nd STORY
HPD violation · open
221 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Proto Restoration Construction—
BIS—Rockledge Scaffold—
BIS—Rockledge Scaffold—
BIS—Rockledge Scaffold—
BIS—Rockledge Scaffold—
BIS—Rockledge Scaffold—
BIS—Xinos Construction—
BIS—Xinos Construction—
BIS—Rockledge Scaffold—
BIS—Summit Development—
BIS—Rockledge Scaffold—
BIS—Summit Development—
BIS—Rockledge Scaffold—
BIS—AM&G Waterproofing—
BIS—S&E Bridge & Scaffold—
BIS—AM&G Waterproofing—
BIS—S&E Bridge & Scaffold—
BIS—S&E Maintenance—
BIS—Controlled Plumbing—
BIS—G.bassolino Plumbing—
Nothing on file for this building.
Nothing on file for this building.
123 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account