← Back
Miscellaneous religious facility
800 EASTERN PARKWAY
BROOKLYN · Crown Heights (South) · BIN 3033060
💬 Discuss this project
1930Year Built
2Stories
M9Building Class
R4Zoning
10,587 sfGross Floor Area
5Units
308 Open Violations ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: CROWN HTS ASSOC BETTERMENT DEVLPMT · 4,033 sf lot · 2.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
800 EASTERN LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC105/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING P C203/21/2026
Building Lifecycle
All (85)Filed (1)Violation (60)Objection (7)Special Inspection (17)
05/04/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
05/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
05/21/2024
Special inspection requirement — Lighting controls
05/21/2024
Special inspection requirement — Permanent certificate
05/21/2024
Special inspection requirement — Ventilation and air distribution system
05/21/2024
Special inspection requirement — Maintenance information
05/21/2024
Special inspection requirement — Air barrier - visual inspection
05/21/2024
Special inspection requirement — Fenestration areas
05/21/2024
Special inspection requirement — Fenestration air leakage
05/21/2024
Special inspection requirement — Interior lighting power
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection resolved — Addressed
05/20/2024
Objection resolved — Addressed
05/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
05/17/2024
Special inspection requirement — Energy Code Compliance Inspections
05/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
05/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
05/15/2024
Objection raised — Inspections
05/15/2024
Objection raised — Scope
05/15/2024
Objection raised — Scope
05/15/2024
Objection raised — Cost
05/10/2024
Filed — Alteration
THIS APPLICATION IS FILED FOR INT. RENOVATI. AT THE EXISTING 4-FAMILY DWELLING WITH CELLAR, DUE TO FIRE DAMAGE, NO CHANGE IN USE, OCCUPANCY, OR EGRESS AND TO ADDRESS THE FOLLOWING VIOLATIONS & VACATE ORDER #: V 060100C0901AP, V 052522C22-01506 VAC B182/22
B00984387-I1
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/10/2024
Violation issued (HPD, open)
A
01/02/2024
Special inspection requirement — Mechanical Systems
01/02/2024
Special inspection requirement — Final
11/20/2023
Violation issued (HPD, open)
I
03/22/2023
Violation issued (HPD, open)
A
11/07/2022
Violation issued (HPD, open)
I
05/25/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/13/2022
Violation issued (HPD, open)
B
04/13/2022
Violation issued (HPD, open)
C
04/13/2022
Violation issued (HPD, open)
B
04/13/2022
Violation issued (HPD, open)
C
04/13/2022
Violation issued (HPD, open)
A
04/13/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, closed)
C
03/22/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
B
03/22/2022
Violation issued (HPD, open)
A
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, closed)
C
03/22/2022
Violation issued (HPD, open)
C
03/22/2022
Violation issued (HPD, open)
A
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDFOREMOST CONTARCTING06/07/2000
1 project · most recent 05/10/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/10/2024——Ventilation Systems
Ventilation
Panasonic MODEL # FV-0811RQC1 EQUIPMENT EFFICIENCY BATHROOM 110 CFM AND KITCHEN 150 CFM Exhaust Fan ×8
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/21/2024Fenestration and door U-factor and product ratings—energy_progress
05/21/2024Lighting controls—energy_progress
05/21/2024Permanent certificate—energy_progress
05/21/2024Ventilation and air distribution system—energy_progress
05/21/2024Maintenance information—energy_progress
05/21/2024Air barrier - visual inspection—energy_progress
05/21/2024Fenestration areas—energy_progress
05/21/2024Fenestration air leakage—energy_progress
05/21/2024Interior lighting power—energy_progress
05/17/2024HVAC-R and service water piping design and insulation—energy_progress
05/17/2024Energy Code Compliance Inspections—progress
05/17/2024HVAC-R and service water heating equipment—energy_progress
05/17/2024HVAC-R and service water heating system controls—energy_progress
05/10/2024Fire-Resistant Penetrations and Joints—special
05/10/2024Structural Stability – Alterations of existing buildings—special
01/02/2024Mechanical Systems—special
01/02/2024Final—progress
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026B00984387-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00984387-I1Open ↗