Elevator cooperative
800 GRAND CONCOURSE
BRONX · BIN 2002791
💬 Discuss this project
1955Year Built
6Stories
D4Building Class
R8Zoning
252,105 sfGross Floor Area
260Units
LL97 CoveredRent Stabilized78 Open Violations 76 unresolved · 2 paperwork only ▸FISP: SWARMP
Elevator cooperative · 55,219 sf lot · 4.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 3 filings · 20 docs
Floor 53p · 1 filing · 6 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarUnder Construction3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION2007/08/2026
800 GRAND CONCOURSE OWNERS2003/22/2026
OWNERS, INC. 800 CONCOURS103/22/2026
CHARLES H GREENTHAL MANAGEMENT703/22/2026
800 GRAND CONCOURSE1003/22/2026
CHARLES H GREENTHAL503/22/2026
CONCOURSE PARKING CORP103/22/2026
DVM INDUSTRIES LLC103/22/2026
NYNEX103/21/2026
XXX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC1003/21/2026
EAST COAST ENGINEERING P C403/21/2026
XINOS CONSTRUCTION403/21/2026
zenesis group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM RESTORATIONGeneral Contractor1707/08/2026
XINOS CONSTRUCTION CORPGeneral Contractor1107/08/2026
VASILIOS MATSIKASElectrical203/21/2026
MATSIKAS VASILIOSElectrical203/21/2026
SAHARA CONTRACTING CORPGeneral Contractor203/21/2026
JOE MIDDLETONElectrical103/21/2026
AMP ELECTRICElectrical103/22/2026
SPEZIALE, JOSEPHElectrical103/21/2026
TRANSCANADAElectrical103/21/2026
WINSER, KEVINElectrical103/21/2026
PIOTR RADZIKElectrical103/21/2026
BECKWITH, BRUCEElectrical103/21/2026
DONALD RICHARDSElectrical103/21/2026
DVM ELECTRICAL SERVICES LElectrical103/22/2026
HOLNESS, GEORGEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRAMEWORK ENGINEERING PC8217111/26/2025
URBAN INTEGRATIONS LLC7993511/26/2025
AMR ENGINEERING CONSULTAN7449109/17/2024
ZENESIS ENGINEERING/ARCHI1473103/13/2023
Building Lifecycle
All (111)Filed (12)Permit Issued (19)Signed Off (7)Facade (FISP) (13)Violation (60)
06/22/2026
Signed off — Alteration
FACADE RESTORATION AND ROOF REPLACEMENT AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01061318-I1
04/06/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01060645-I1
02/19/2026
Permit issued — Protection and Mechanical Methods
X01182385-I1-PMM
01/07/2026
Permit issued — Structural
X01295390-I1-ST
12/03/2025
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
X01076243-I1
12/02/2025
Signed off — Alteration
X01037291-I1
11/26/2025
Filed — Alteration
GARAGE REPAIRS INCLUDING INSTALLATION OF TEMPORARY SHORING AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01295390-I1
08/25/2025
Permit issued — General Construction
X01061318-I1-GC
08/18/2025
Permit issued — Suspended Scaffold
X01076243-I1-SC
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
A
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
C
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
B
08/01/2025
Violation issued (HPD, open)
B
06/10/2025
Permit issued — Supported Scaffold
X01060645-I1-SF
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
C
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
C
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
C
04/09/2025
Violation issued (HPD, open)
C
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, closed)
C
04/07/2025
Permit issued — Sidewalk Shed
X01037291-I1-SH
03/06/2025
Permit issued — Protection and Mechanical Methods
X01182385-I1-PMM
03/05/2025
Filed — Alteration
Installation of a temporary shoring in the Garage as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thisapplication.
X01182385-I1
03/03/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
X01076243-P2
10/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/24/2024
Permit issued — General Construction
X01061318-I1-GC
09/19/2024
Permit issued — Suspended Scaffold
X01076243-P1-SC
09/17/2024
Filed — Alteration
FACADE RESTORATION AND ROOF REPLACEMENT AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01061318-I1
09/13/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
X01076243-P1
08/20/2024
Violation issued (ECB, open)
Construction
08/06/2024
Violation issued (HPD, open)
C
08/06/2024
Violation issued (HPD, open)
A
08/06/2024
Violation issued (HPD, open)
A
08/06/2024
Violation issued (HPD, open)
B
08/06/2024
Violation issued (HPD, open)
B
08/06/2024
Violation issued (HPD, closed)
B
08/06/2024
Violation issued (HPD, open)
C
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedNEW AMSTERDAM RESTORATION02/19/2026
DOB NOWStructuralPermit IssuedNEW AMSTERDAM RESTORATION01/07/2026
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION08/25/2025
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION08/18/2025
DOB NOWSupported ScaffoldSigned-offNEW AMSTERDAM RESTORATION06/10/2025
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION04/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedNEW AMSTERDAM RESTORATION03/06/2025
DOB NOWGeneral ConstructionSigned-offNEW AMSTERDAM RESTORATION09/24/2024
DOB NOWSuspended ScaffoldPermit IssuedNEW AMSTERDAM RESTORATION09/19/2024
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION07/15/2024
DOB NOWSupported ScaffoldSigned-offNEW AMSTERDAM RESTORATION07/05/2024
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION05/06/2024
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP04/27/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/09/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/12/2021
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP05/24/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/25/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP09/25/2018
BISOTISSUEDXINOS CONSTRUCTION CORP03/08/2021
BISOTISSUEDVANGUARD CONSTRUCTION AND08/21/2020
BISOTISSUEDVANGUARD CONSTRUCTION AND08/21/2020
BISOTISSUEDXINOS CONSTRUCTION CORP06/18/2020
BISOTISSUEDVANGUARD CONSTRUCTION AND09/19/2019
BISMHISSUEDVANGUARD CONSTRUCTION AND09/16/2019
BISOTISSUEDVANGUARD CONSTRUCTION AND09/16/2019
BISOTISSUEDVANGUARD CONSTRUCTION AND05/30/2019
BISOTISSUEDVANGUARD CONSTRUCTION AND05/13/2019
BISMHISSUEDVANGUARD CONSTRUCTION AND05/13/2019
BISOTISSUEDHOME DESIGN GROUP NYC LLC01/17/2018
BISFSISSUEDAMERICAN BOILER & WELDING09/19/2017
BISFBISSUEDAMERICAN BOILER & WELDING09/19/2017
BISFBISSUEDAMERICAN BOILER & WELDING08/04/2017
BISPLISSUEDDUAL FUEL PLUBING & HTING04/13/2017
BISFBISSUEDAMERICAN BOILER & WELDING04/13/2017
BISOTISSUEDXINOS CONSTRUCTION CORP02/24/2016
BISPLISSUEDAQUEDUCT PLBG & MECH CORP10/27/2015
BISOTISSUEDLEMESOS INC10/15/2015
BISEQISSUEDXINOS CONSTRUCTION CORP02/27/2015
BISOTISSUEDXINOS CONSTRUCTION CORP02/24/2015
+ 14 more permits on file
14 projects · most recent 06/17/2024
General Wiring
FiledStatusContractorScope
06/17/2024CompleteGLENDALE ELECTL CONTNG IN—
07/18/2023Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
05/16/2023Permit IssuedTRIBORO ELEC'L CONTR'G COGeneral Wiring
03/31/2023Permit IssuedFALCO ELEC'L SERVICES INCGeneral Wiring
10/04/2022CompleteV. VASS ELECTRIC CORPGeneral Wiring
09/20/2022CompleteAMP ELECTRICGeneral Wiring
07/17/2021Permit IssuedWCK ELECTRIC CORP.General Wiring
04/01/2021CompleteK & G ELECTRIC CO., INC.General Wiring
12/29/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/24/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/18/2020Permit IssuedGEORGE HOLNESSGeneral Wiring
09/15/2020CompleteGEORGE HOLNESSGeneral Wiring
09/04/2019CompleteCEDAR ELEC'L CONT'RS INC.General Wiring
02/11/2019Permit IssuedTOWER ELECTRIC INC.—
1 project · most recent 11/26/2025
Concrete
FiledStatusContractorScope
11/26/2025Permit IssuedNEW AMSTERDAM RESTORATIONConcrete
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/18/2025Tenant Protection Plan ComplianceDANNY TRUJILLOspecial
11/05/2025Concrete - Cast-In-PlaceJAMES NAPOLIspecial
11/05/2025Structural Stability – Alterations of existing buildingsJAMES NAPOLIspecial
09/30/2025FinalJAMES NAPOLIprogress
03/04/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
03/04/2025Post-installed AnchorsDANNY TRUJILLOspecial
03/04/2025Alternative Materials - OTCR Buildings Bulletin NumberAmal Hassan Hassanspecial
02/28/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
02/28/2025Alternative Materials - OTCR Buildings Bulletin NumberAmal Hassan Hassanspecial
02/28/2025Post-installed AnchorsDANNY TRUJILLOspecial
09/13/2024Tenant Protection Plan ComplianceDANNY TRUJILLOspecial
06/04/2024FinalAMR HAFEZprogress
06/04/2024MasonryAMR HAFEZspecial
12/16/2022Fire-Resistant Penetrations and JointsRAJENDRA PARIKHspecial
12/16/2022FinalRAJENDRA PARIKHprogress
02/18/2019FinalHamidreza Saghariprogress
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/26/2026X00082047-I1Request digital key ↗
08/23/2026X00800869-I1Request digital key ↗
08/21/2026X01037291-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00132112-I1Request digital key ↗
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION21
06/18/2020220470489Open ↗
09/19/2019220683044Open ↗
09/16/2019220683044Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
04/20/2021220683044Open ↗
01/24/2020220470489Open ↗
06/27/2019220577230Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026X01061318-I1Open ↗
08/13/2026X01295390-I1Open ↗
08/13/2026X00800869-I1Open ↗
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
01/24/2020220470489Open ↗
07/08/2019220577230Open ↗
05/10/2019220683044Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/30/2026X01076243-P2Open ↗
08/30/2026X01076243-P2Open ↗
08/30/2026X01076243-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X00132112-I1Open ↗
08/23/2026X00800869-I1Open ↗
08/21/2026X01037291-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
12/18/2017220628916Open ↗
04/13/2017220577230Open ↗
10/15/2015220483796Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026X01295390-I1Open ↗
08/27/2026X00132112-I1Open ↗
08/26/2026X01061318-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/18/2017220628916Open ↗
04/13/2017220577230Open ↗
10/15/2015220483796Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/06/2013220328214Open ↗
06/11/2013220306997Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/13/2017220577230Open ↗
10/15/2015220483796Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/13/2017220577230Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
01/24/2020220470489Open ↗
12/24/2018220683044Open ↗
12/18/2017220628916Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
01/24/2020220470489Open ↗
12/24/2018220683044Open ↗
12/18/2017220628916Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00800869-I1Open ↗
08/17/2026X01295390-I1Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
11/04/2022220470489Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/11/2008210043460Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026X01061318-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/24/2020220470489Open ↗
07/08/2019220577230Open ↗
04/23/2018220628916Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/08/2019220577230Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/14/2020220470489Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
09/15/2021220683044Open ↗
09/15/2021220683044Open ↗
09/15/2021220683044Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
11/04/2022220470489Open ↗
09/20/2021220683044Open ↗
09/09/2021220683044Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS APPROVAL8
05/21/2020220470489Open ↗
03/17/2020220683044Open ↗
03/19/2019220683044Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/08/2019220577230Open ↗
04/23/2018220628916Open ↗
06/22/2013220306997Open ↗
▸BISLANDMARKS SIGNOFF2
11/04/2022220470489Open ↗
09/09/2021220683044Open ↗
▸BISSHED LETTER2
03/09/2015220306997Open ↗
03/06/2014220306997Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/18/2008210045798Open ↗
04/07/2008210043460Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01061318-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
09/09/2021220683044Open ↗
01/24/2020220470489Open ↗
07/08/2019220577230Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET9
01/24/2020220470489Open ↗
01/15/2019220683044Open ↗
01/15/2019220683044Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
09/20/2021220683044Open ↗
04/20/2021220683044Open ↗
03/10/2020220683044Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
07/08/2019220577230Open ↗
04/23/2018220628916Open ↗
11/16/2017220306997Open ↗
▸Other Documents11
▸DOB NOWManufacturer's Specifications4
08/13/2026X01076243-P2Open ↗
08/13/2026X01076243-I1Open ↗
08/13/2026X01076243-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026X01076243-I1Open ↗
08/13/2026X01051114-I1Open ↗
08/13/2026X01076243-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026X00132112-I1Open ↗
08/13/2026X00082047-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/14/2020220470489Open ↗