← Back
Multi-story retail building (2+)
801 ANNADALE ROAD
STATEN ISLAND · BIN 5080061
💬 Discuss this project
2012Year Built
2Stories
K2Building Class
R3-2Zoning
6,886 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: SB& MK HOLDING LLC · 34,062 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof12p · 3 filings · 19 docs
Floor 26p · 1 filing · 7 docs
Floor 16p · 1 filing · 7 docs
Cellar6p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADONIA DEVELOPMENT103/22/2026
SOUTH SHORE DEVELOPMENT103/22/2026
SB MK HOLDINGS2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GT WIRELESS ENGINEERING, PLLC411/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIGITAL CONSTRUCTION TECHGeneral Contractor804/09/2026
L.L.G. PLBG & HTG INCPlumbing207/08/2026
A J IANNI ELECL CONTS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNS INSPECTION SERVICES7566311/20/2024
R MARSAC CONSULTING LLC329206/07/2023
Building Lifecycle
All (41)Filed (4)Permit Issued (8)Signed Off (1)Violation (17)Inspection (3)Special Inspection (8)
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Nucatola
05/05/2026
Special inspection requirement — Post-installed Anchors
John Nucatola
03/10/2026
Signed off — Alteration
S00806097-I1
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
11/17/2025
Violation issued (FDNY_ORDER, closed)
05/05/2025
Permit issued — Mechanical Systems
S00806170-I1-GC-CX
05/05/2025
Permit issued — Antenna
S00806097-I1-AN
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2024
Filed — Alteration
S00806191-P1
08/08/2024
Permit issued — Structural
S00806170-I1-GC-CX
08/06/2024
Permit issued — Plumbing
S00806191-I1-PL
07/01/2024
Permit issued — Antenna
S00806097-I1-AN
04/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2023
Violation issued (FDNY_NOV, closed)
07/25/2023
Permit issued — General Construction
S00806170-I1-GC-CX
06/27/2023
Permit issued — Plumbing
S00806191-I1-PL
06/23/2023
Permit issued — Antenna
S00806097-I1-AN
06/23/2023
Special inspection requirement — Structural Steel - Welding
Robert Marsac
06/23/2023
Special inspection requirement — Post-installed Anchors
Robert Marsac
06/23/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Robert Marsac
06/07/2023
Filed — Alteration
S00806097-I1
06/06/2023
Filed — Alteration
S00806170-I1
06/06/2023
Filed — Alteration
S00806191-I1
12/30/2022
Special inspection requirement — Final
Robert Marsac
12/30/2022
Special inspection requirement — Mechanical Systems
John Nucatola
12/30/2022
Special inspection requirement — Structural Steel - Details
Robert Marsac
12/09/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2013
Violation issued (ECB, closed)
Construction
05/26/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2007
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
02/18/2007
Violation issued (ECB, closed)
Construction
01/27/1993
Violation issued (ECB, closed)
Construction
01/27/1993
Violation issued (ECB, closed)
Construction
05/15/1992
Violation issued (ECB, closed)
Construction
05/14/1992
Violation issued (ECB, closed)
Construction
11/02/1990
Violation issued (ECB, closed)
Construction
11/02/1990
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDIGITAL CONSTRUCTION TECH05/05/2025
DOB NOWAntennaSigned-offDIGITAL CONSTRUCTION TECH05/05/2025
DOB NOWStructuralPermit IssuedDIGITAL CONSTRUCTION TECH08/08/2024
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC08/06/2024
DOB NOWAntennaSigned-offDIGITAL CONSTRUCTION TECH07/01/2024
DOB NOWGeneral ConstructionPermit IssuedDIGITAL CONSTRUCTION TECH07/25/2023
DOB NOWPlumbingPermit IssuedL.L.G. PLBG & HTG INC06/27/2023
DOB NOWAntennaSigned-offDIGITAL CONSTRUCTION TECH06/23/2023
BISPLISSUEDFLINT MECHANICAL CORP01/16/2014
BIS—ISSUEDMADONIA DEVELOPMENT CORP10/04/2013
BISEQISSUEDMADONIA DEVELOPMENT CORP10/04/2013
BISSPISSUEDFLINT MECHANICAL CORP04/04/2013
BISEQISSUEDMADONIA DEVELOPMENT CORP04/04/2013
BISPLISSUEDFLINT MECHANICAL CORP04/04/2013
BISMHISSUEDGREGG MECHANICAL CORP03/26/2013
BISFPISSUEDRELIABLE FIRE PROT. INC03/06/2013
BIS—ISSUEDMADONIA DEVELOPMENT CORP12/07/2012
BISPLISSUEDJFR CONSTRUCTION CORP06/12/2012
BISPLISSUEDFLINT MECHANICAL CORP04/02/2012
BISSPISSUEDFLINT MECHANICAL CORP04/02/2012
BIS—ISSUEDMADONIA DEVELOPMENT CORP01/03/2012
BISEQISSUEDMADONIA DEVELOPMENT CORP12/02/2011
BIS—ISSUEDSTEEL CITY DEMO INC05/07/2010
BIS—ISSUEDNARROWS PLBG & HTG CORP.05/08/2001
BISEQRE-ISSUEDNARROWS PLBG & HTG CORP.05/08/2001
BIS—ISSUEDNARROWS PLBG & HTG CORP.07/29/1999
BISEQISSUEDNARROWS PLBG & HTG CORP.07/09/1999
BIS—ISSUEDNARROWS PLBG & HTG CORP.03/24/1998
BIS—ISSUEDNARROWS PLBG & HTG CORP.04/23/1997
BIS—ISSUEDNARROWS PLBG & HTG CORP.01/30/1997
BIS—ISSUEDVINDARO DEVELOPMENT CORP03/05/1996
BIS—ISSUEDNARROWS PLUMBING & HEATING CORP.07/07/1995
3 projects · most recent 02/02/2024
General Wiring
FiledStatusContractorScope
02/02/2024Permit IssuedRNH ELECTRIC COMPANY INCGeneral Wiring
08/29/2023CompleteRNH ELECTRIC COMPANY INCGeneral Wiring
11/28/2018Permit IssuedA J IANNI ELECL CONTS INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/05/2026Fire-Resistant Penetrations and JointsJohn Nucatolaspecial
05/05/2026Post-installed AnchorsJohn Nucatolaspecial
06/23/2023Structural Steel - WeldingRobert Marsacspecial
06/23/2023Post-installed AnchorsRobert Marsacspecial
06/23/2023Structural Steel - High Strength BoltingRobert Marsacspecial
12/30/2022FinalRobert Marsacprogress
12/30/2022Mechanical SystemsJohn Nucatolaspecial
12/30/2022Structural Steel - DetailsRobert Marsacspecial
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00806170-I1Request digital key ↗
08/23/2026S00806097-I1Request digital key ↗
08/20/2026S00806191-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION17
04/04/2014520085960Open ↗
03/19/2014520061316Open ↗
01/10/2014520085960Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION14
01/17/2014520122313Open ↗
10/09/2013520061325Open ↗
10/09/2013520061316Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-DOT: SIDEWALK-CURB-ROAD WORK PERMITS9
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
Showing 3 of 9 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening2
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/12/2011520055573Open ↗
▸BISPLACE OF ASSEMBLY1
04/23/2014520188911Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/14/2014520061316Open ↗
▸BISBPP-15 - Application for waiver of Builders pavement requirements1
07/22/2013520055573Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
12/20/2010520055573Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
06/04/2014520061316Open ↗
▸BISZONING DIAGRAM1
07/13/2011520061316Open ↗
▸Seals & Professional Certifications39
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
06/03/2014520061316Open ↗
06/02/2014520188911Open ↗
04/16/2014520061325Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00806191-I1Open ↗
08/23/2026S00806170-I1Open ↗
08/23/2026S00806170-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S00806170-I1Open ↗
08/23/2026S00806097-I1Open ↗
08/20/2026S00806191-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/04/2014520085960Open ↗
12/13/2011520085960Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026S00806170-I1Open ↗
▸Trade Schedules & Equipment32
▸BISSELF-CERT PLUMBING NOTICE8
04/11/2014520061316Open ↗
04/09/2014520061316Open ↗
03/04/2014520085960Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/11/2013520085960Open ↗
02/13/2013520122313Open ↗
12/13/2011520085960Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/08/2014520085960Open ↗
04/04/2014520085960Open ↗
04/04/2014520085960Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
06/02/2014520097939Open ↗
03/11/2014520122313Open ↗
12/18/2013520061316Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B3
05/02/2014520085960Open ↗
05/02/2014520085960Open ↗
05/01/2014520085960Open ↗
▸BISEQUIPMENT USE PERMITS2
04/15/2014520085960Open ↗
04/15/2014520085960Open ↗
▸BISWATER METER PERMIT : DEP-METER2
01/21/2014520085960Open ↗
01/21/2014520085960Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/10/2014520085960Open ↗
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
04/29/2011520061316Open ↗
▸BISWATER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
03/04/2014520085960Open ↗
▸Safety & Tenant Protection9
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
12/05/2011520061316Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT2
01/13/2015520061316Open ↗
05/27/2014520061316Open ↗
▸BISSTREET TREE CHECKLIST2
03/14/2011520061316Open ↗
12/16/2010520055573Open ↗
▸BISStreet Trees- Receipt of Street Trees Site Plan2
05/22/2014520055573Open ↗
01/03/2012520061316Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026S00806170-I1Open ↗
08/23/2026S00806097-I1Open ↗
08/20/2026S00806191-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/16/2010520055573Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/13/2013520122313Open ↗
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY3
03/20/2012520061316Open ↗
12/13/2011520085960Open ↗
03/14/2011520061316Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/26/2014520085960Open ↗
12/18/2013520061316Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/26/2014520085960Open ↗
12/18/2013520061316Open ↗
▸Inspections & Test Reports9
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT3
05/27/2014520061316Open ↗
05/27/2014520061316Open ↗
05/27/2014520061316Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
01/28/2014520061316Open ↗
06/01/2012520061316Open ↗
12/05/2011520061316Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/03/2014520061316Open ↗
12/05/2011520061316Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/12/2011520055573Open ↗
▸Approvals, Objections & Sign-offs23
▸BISADMINISTRATIVE OBJECTIONS8
03/19/2014520188911Open ↗
02/12/2013520122313Open ↗
05/01/2012520097939Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/06/2014520061316Open ↗
06/03/2014520061316Open ↗
06/02/2014520097939Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/22/2013520055573Open ↗
07/22/2013520055573Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/19/2014520061316Open ↗
03/14/2011520061316Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
01/21/2014520085960Open ↗
01/21/2014520085960Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/12/2011520055573Open ↗
▸BISBSA-CPC APPROVAL1
04/22/2011520061316Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT6
06/02/2014520097939Open ↗
03/25/2014520085960Open ↗
03/11/2014520122313Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/09/2013520061316Open ↗
12/13/2012520061316Open ↗
01/05/2012520061316Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/06/2014520055573Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
02/12/2013520122313Open ↗
05/01/2012520097939Open ↗
12/13/2011520085960Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
03/19/2014520061316Open ↗
12/16/2013520085960Open ↗
07/31/2013520061316Open ↗
Showing 3 of 7 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
06/03/2014520061316Open ↗
05/22/2014520097939Open ↗
05/22/2014520055573Open ↗
Showing 3 of 12 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION6
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES2
05/22/2014520055573Open ↗
05/22/2014520055573Open ↗
▸BISPlot Diagram1
04/11/2011520061316Open ↗
▸BISBPP: WAIVER OF GRADE FILING1
05/30/2014520055573Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
05/22/2014520055573Open ↗
▸BISSITE CONNECTION: DEP1
04/28/2011520061316Open ↗