Primarily 1 family with 1 store or office
801 OCEAN PARKWAY
BROOKLYN · BIN 3170458
💬 Discuss this project
1930Year Built
2.75Stories
S1Building Class
R7AZoning
2,728 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · Owner of record: 801 HOP LLC · 3,520 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 1 filing · 20 docs
Floor 8Under Construction27p · 1 filing · 20 docs
Floor 7Under Construction28p · 1 filing · 20 docs
Floor 6Under Construction28p · 1 filing · 20 docs
Floor 5Under Construction28p · 1 filing · 20 docs
Floor 4Under Construction28p · 1 filing · 20 docs
Floor 3Under Construction28p · 1 filing · 20 docs
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction27p · 1 filing · 20 docs
CellarUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
801 HOP3307/25/2026
LBS CONSULTING SERVICES407/08/2026
NEW AMERICAN CONSTRUCTION INC803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/05/2024$1.9M—801 OP LLC → 801 HOP LLC$706/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KINDO HOLDINGS, LLC1408/21/2026
ALWAYS FAST SERVICES CORP112/31/2025
ASHRAF CORP209/08/2025
ENTHINK ENGINEERS LLC111/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LBS CONSULTING SERVICES2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-NADO INCGeneral Contractor1007/14/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor603/21/2026
PROFESSIONAL LINE CORPGeneral Contractor609/23/2026
CANDID CONNECTION INCGeneral Contractor209/10/2026
AMOK INCPlumbing107/02/2026
AMOK INCFire Protection107/02/2026
NADKOS INCGeneral Contractor107/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZARINA KINDO, RA4900405/11/2026
A&B WORLD CONSULTING, INC5704102/22/2026
ENGINEERING PROFESSIONAL6393107/22/2024
Building Lifecycle
All (83)Filed (18)Permit Issued (23)Signed Off (2)Objection (10)Special Inspection (30)
09/22/2026
Permit issued — Sidewalk Shed
B01267304-I1-SH
09/18/2026
Permit issued — Supported Scaffold
B01267312-I1-SF
09/09/2026
Permit issued — Protection and Mechanical Methods
B01083935-S8-PMM
08/31/2026
Permit issued — Sidewalk Shed
B01443850-I1-SH
08/21/2026
Filed — New Building
Use of a small crane during construction
B01083935-P4
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
ZARINA KINDO
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ZARINA KINDO
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
ZARINA KINDO
07/24/2026
Permit issued — Protection and Mechanical Methods
B01083935-S6-PMM
07/13/2026
Permit issued — Mechanical Systems
B01083935-I1-GC-CX
06/30/2026
Permit issued — General Construction
B01083935-I1-GC-CX
06/15/2026
Filed — New Building
Use of a small crane during construction
B01083935-S7
05/28/2026
Permit issued — Standpipe
B01083935-S5-EW-SD
05/20/2026
Special inspection requirement — Masonry
ZARINA KINDO
05/20/2026
Special inspection requirement — Structural Steel - Details
ZARINA KINDO
05/20/2026
Special inspection requirement — Structural Steel - Welding
ZARINA KINDO
05/20/2026
Special inspection requirement — Structural Cold-Formed Steel
ZARINA KINDO
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
ZARINA KINDO
05/20/2026
Special inspection requirement — Final
JAMES NAPOLI
05/11/2026
Filed — New Building
Use of a small crane during construction
B01083935-P3
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
ZARINA KINDO
05/11/2026
Special inspection requirement — Final
JAMES NAPOLI
05/11/2026
Special inspection requirement — Structural Steel - Details
ZARINA KINDO
05/11/2026
Special inspection requirement — Structural Cold-Formed Steel
ZARINA KINDO
05/11/2026
Special inspection requirement — Masonry
ZARINA KINDO
05/11/2026
Special inspection requirement — Structural Steel - Welding
ZARINA KINDO
04/24/2026
Permit issued — Plumbing
B01083935-S1-PL
04/16/2026
Filed — New Building
Use of a small crane during construction
B01083935-S6
03/30/2026
Objection resolved — Addressed
03/11/2026
Permit issued — Mechanical Systems
B01083935-I1-GC-CX
03/11/2026
Objection raised — Fire_Protection
03/09/2026
Permit issued — Earth Work
B01083935-S3-FO-EA
03/09/2026
Permit issued — Sidewalk Shed
B01267304-I1-SH
03/09/2026
Permit issued — General Construction
B01083935-I1-GC-CX
03/05/2026
Permit issued — Structural
B01083935-S4-ST
03/04/2026
Permit issued — Support of Excavation
B01083935-S2-SE
02/22/2026
Filed — New Building
Use of a small crane during construction
B01083935-S5
02/22/2026
Special inspection requirement — Standpipe Systems
Alexander Bomstein
02/04/2026
Permit issued — Construction Fence
B01085350-I1-FN
01/14/2026
Permit issued — Protection and Mechanical Methods
B01339264-I1-PMM
12/31/2025
Filed — Alteration
B01339264-I1
11/13/2025
Filed — Alteration
EXCAVATION AND FOUNDATION WORK IN CONJUNCTION WITH A NB B01083935
B01317003-I1
11/13/2025
Filed — Alteration
B01318489-I1
11/11/2025
Special inspection requirement — Footing and Foundation
11/11/2025
Special inspection requirement — Final
09/09/2025
Permit issued — Sidewalk Shed
B01267304-I1-SH
09/09/2025
Permit issued — Supported Scaffold
B01267312-I1-SF
09/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01267304-I1
09/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01267312-I1
09/03/2025
Objection resolved — Addressed
09/01/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/07/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ZARINA KINDO
07/28/2025
Objection raised — Admin
07/25/2025
Objection raised — Other
07/24/2025
Filed — New Building
Use of a small crane during construction
B01083935-S4
07/13/2025
Filed — New Building
Use of a small crane during construction
B01083935-S3
07/13/2025
Filed — New Building
Use of a small crane during construction
B01083935-S2
07/13/2025
Special inspection requirement — Footing and Foundation
ZARINA KINDO
07/13/2025
Special inspection requirement — Final
JAMES NAPOLI
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPROFESSIONAL LINE CORP09/22/2026
DOB NOWSupported ScaffoldPermit IssuedSUPER PLUMBERS CORP09/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCANDID CONNECTION INC09/09/2026
DOB NOWSidewalk ShedPermit IssuedPROFESSIONAL LINE CORP08/31/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCANDID CONNECTION INC07/24/2026
DOB NOWMechanical SystemsPermit IssuedG-NADO INC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedG-NADO INC06/30/2026
DOB NOWStandpipePermit IssuedAMOK INC05/28/2026
DOB NOWPlumbingPermit IssuedAMOK INC04/24/2026
DOB NOWMechanical SystemsPermit IssuedG-NADO INC03/11/2026
DOB NOWEarth WorkPermit IssuedG-NADO INC03/09/2026
DOB NOWSidewalk ShedPermit IssuedPROFESSIONAL LINE CORP03/09/2026
DOB NOWGeneral ConstructionPermit IssuedG-NADO INC03/09/2026
DOB NOWStructuralPermit IssuedG-NADO INC03/05/2026
DOB NOWSupport of ExcavationPermit IssuedG-NADO INC03/04/2026
DOB NOWConstruction FencePermit IssuedG-NADO INC02/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPROFESSIONAL LINE CORP01/14/2026
DOB NOWSidewalk ShedPermit IssuedPROFESSIONAL LINE CORP09/09/2025
DOB NOWSupported ScaffoldPermit IssuedPROFESSIONAL LINE CORP09/09/2025
DOB NOWFull DemolitionSigned-offNADKOS INC11/14/2024
DOB NOWConstruction FencePermit IssuedG-NADO INC10/17/2024
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION12/30/2022
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION11/15/2021
1 project · most recent 08/21/2026
Sprinkler System
FiledStatusContractorScope
08/21/2026Permit IssuedAMOK INCSprinkler System
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedAMOK INC—
2 projects · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025Permit IssuedRICHARD NEU—
11/12/2021CompleteRICHARD NEU—
2 projects · most recent 08/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/21/2026Permit IssuedCANDID CONNECTION INCSteel, Concrete, Masonry
11/13/2025——2 scope_items
2 projects · most recent 09/08/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/08/2025Permit IssuedPROFESSIONAL LINE CORPSidewalk Shed
09/06/2025Permit IssuedPROFESSIONAL LINE CORPScaffold
1 project · most recent 08/21/2026
Earthwork
FiledStatusContractorScope
08/21/2026Permit IssuedCANDID CONNECTION INCEarthwork
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/20/2026HVAC-R and service water heating equipmentZARINA KINDOenergy_progress
08/20/2026HVAC-R and service water piping design and insulationZARINA KINDOenergy_progress
08/20/2026HVAC-R and service water heating system controlsZARINA KINDOenergy_progress
05/20/2026MasonryZARINA KINDOspecial
05/20/2026Structural Steel - DetailsZARINA KINDOspecial
05/20/2026Structural Steel - WeldingZARINA KINDOspecial
05/20/2026Structural Cold-Formed SteelZARINA KINDOspecial
05/20/2026Concrete - Cast-In-PlaceZARINA KINDOspecial
05/20/2026FinalJAMES NAPOLIprogress
05/11/2026Concrete - Cast-In-PlaceZARINA KINDOspecial
05/11/2026FinalJAMES NAPOLIprogress
05/11/2026Structural Steel - DetailsZARINA KINDOspecial
05/11/2026Structural Cold-Formed SteelZARINA KINDOspecial
05/11/2026MasonryZARINA KINDOspecial
05/11/2026Structural Steel - WeldingZARINA KINDOspecial
02/22/2026Standpipe SystemsAlexander Bomsteinspecial
11/11/2025Footing and Foundation—progress
11/11/2025Final—progress
08/07/2025Excavations - Sheeting, Shoring, and BracingZARINA KINDOspecial
07/13/2025Footing and FoundationZARINA KINDOprogress
07/13/2025FinalJAMES NAPOLIprogress
06/06/2025HVAC-R and service water piping design and insulationZARINA KINDOenergy_progress
06/06/2025HVAC-R and service water heating system controlsZARINA KINDOenergy_progress
06/06/2025HVAC-R and service water heating equipmentZARINA KINDOenergy_progress
06/05/2025Protection of exposed foundation insulationZARINA KINDOenergy_progress
Latest 25 of 51.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/31/2026B00629691-I1Request digital key ↗
08/24/2026B01085350-I1Request digital key ↗
08/21/2026B01083935-P4Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 110
08/21/2026B01083935-P4Open ↗
08/17/2026B01083935-P3Open ↗
08/17/2026B01083935-S7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01083935-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01083935-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01083935-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/31/2026B00629691-I1Open ↗
08/21/2026B01083935-P4Open ↗
08/19/2026B01318489-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026B01083935-P4Open ↗
08/30/2026B01083935-S1Open ↗
08/25/2026B01083935-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01083935-S5Open ↗
09/02/2026B01083935-S2Open ↗
08/25/2026B01083935-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026B01062316-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01062316-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01062316-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01062316-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01083935-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01083935-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01083935-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026B01062316-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01062316-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/17/2026B01083935-I1Open ↗
08/13/2026B01062316-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B01083935-S3Open ↗
08/13/2026B01083935-S2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01062316-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01062316-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01083935-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01083935-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01062316-I1Open ↗