ECB08/25/2026ATOI OBSERVED 1 WORKER INSTALLING ELECTRICAL LINES FOR METERS @ EXPO 2. ALSO OBSERVED A NEW WOODEN STRUCTURE @EXPO 3. EXTENSION @ EXPO 3 MADE OFF CMU BLOCK IS 100% COMPLETE. ALL WORK DONE WHILE ON A SWO. # COMP$10K due
ECB08/25/2026ATOI DID NOT OBSERVE SWO THAT WAS AFFIXED TO FRONT ENTRANCE DOOR FOR COMPLAINT #3A31073. TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. COMPLAINT # 3A31073 AND VIO # 39162690L., COMPLY WITH$5K due
ECB02/11/2026ATOI OBSERVED STOP WORK ORDER HAS BEEN REMOVED /TAMPERED WITH AT EXPOSURE 1 OF PROPERTY LOCATED /POSTED ON WINDOW. COMPLY WITH CODE., COMPLY WITH CODE$5K due
ECB02/11/2026ATOI OBSERVED VACANT NOTICE HAS BEEN REMOVED /TAMPERED WITH AT EXPOSURE 1 OF PROPERTY LOCATED /POSTED ON WINDOW. COMPLY WITH CODE., COMPLY WITH CODE$5K due
ECB10/06/2025ATOI OBSERVED AT ROOF TOP SHINGLES AT DORMERS MISSING IN MULTIPLE LOCATIONS. ROOF SHEATING EXPOSED. POINT OF ENTRY FOR WATER. ALSO AT MAIN ENTRY THE OVERHANG IS SLOPING AND COLLAPSING AT THE LEFT SIDE COLUMN. S$2K due
DOB10/06/2025ATOI OBSERVED AN UNPERMITTED CMU 2 STORY STRUCTURE IN REAR EXP 3. APPROX 2,000SF. NO PLANS ON FILE. FOUNDATION, CMU REINFORCING AT WALLS, FLOOR JOIST ATTACHMENT AND ROOF RAFTER ATTACHMENT AND SIZES ARE UNKNOWN. LEFT SIDE WALLS ARE NOT STRAIGHT HAS DEFLECTION. STRUCTURAL STABILITY IS UNKNOWN AND IN QUESTION.
ECB10/06/2025ATOI OBSERVED AT EXP 2 MINI SPLIT ACS WITH ELECTRICAL DISCONNECTS. ALSO BX CABLE PROTRUDING FROM MASONRY WALL AT FRONT ENTRY DOOR. NO PERMITS ON FILE FOR ELECTRICAL WORK. OBSERVED AT 3PM, OBTAIN PERMIT$2K due
ECB10/02/2025ATOI OBSERVED VERTICAL EXTENSION STRUCTURE BUILT IN BACK YARD AT EXPOSURE 3 OF PROPERTY MADE OUT OF CINDER BLOCK 100 % COMPLETED. NO PERMITS FILE WITH THE DEPARTMENT FOR SCOPE OF WORK TAKEN PLACE., OBTAIN PERMI$2K due
ECB07/14/2013JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION. NOTED: CONSTRUCTION FENCE ERECTED IN FRONT OF PROPERTY IS LEANING TO THE SIDEWALK, MISSING PARTS AND LOOSE. JOB #320291929. REMEDY: REPAIR/REPLACE FENCE.Nothing owed — awaiting certificate of correction
ECB02/03/20121704.1.1:FAILURE TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUANCE & PRIOR TO START OF WORK UNDER SPECIAL INSPECTION REQUIREMENT. AT TIME OF INSPECTION ON ACTIVE CONSTRUCTION SITNothing owed — awaiting certificate of correction
ECB11/14/2011FAILURE TO MAINTAIN BUILDING EXTERIOR NOTED: FOUND VERTICAL CRACK APPROX 1"X3" AT FRONT RIGHT OF FOYER AREA, MISSING GLASS PANELS AT SECOND FLOOR WINDOWS.REMEDY:REPAIR DEFECTS FORTHWITH.Nothing owed — awaiting certificate of correction