← Back
Walk-up apt, over six families with stores
802 LEXINGTON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1042021
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-8XZoning
8,527 sfGross Floor Area
10Units
Rent Stabilized17 Open Violations 12 unresolved · 5 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 800 LEX OWNER ,LLC · 1,906 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 55p · 1 filing · 20 docs
Floor 42p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATIONAL RESTAURANTS MANAGEMENT1604/09/2026
UNITED KING CONSTRUCTION303/22/2026
800 LEX OWNER2303/22/2026
800 LEX OWNER LLC/T GEBBI203/22/2026
TLS NYC REAL ESTATES1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANDREW L. PETTIT, ARCHITECT712/13/2024
GREEN DESIGN108/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SEAY-YARBROUGH1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED KING CONSTRUCTIONGeneral Contractor303/21/2026
RAPPO, FRANKElectrical203/21/2026
CEESAY, BELALElectrical203/21/2026
QUINTANA, DAVIDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
ADVANCE TEAM CONSULTANT *General Contractor104/09/2026
I.M.P. PLBG. & HTG. CORPPlumbing107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
CHETRAM, RISHIRAMElectrical103/21/2026
JAMES FAMULAROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267412/13/2024
Building Lifecycle
All (78)Filed (8)Permit Issued (4)Violation (42)Inspection (2)Objection (4)Special Inspection (18)
04/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2025
Permit issued — General Construction
M00945294-I1-GC
02/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Matthew Wavro
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
12/23/2024
Objection raised — Scope
12/23/2024
Objection raised — Scope
12/13/2024
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-P4
12/13/2024
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-P3
12/02/2024
Special inspection requirement — Interior lighting power
Matthew Wavro
12/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
12/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
12/02/2024
Special inspection requirement — Final
Matthew Wavro
12/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
12/02/2024
Special inspection requirement — Lighting in dwelling units
Matthew Wavro
12/02/2024
Special inspection requirement — Lighting controls
Matthew Wavro
10/15/2024
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-P2
10/11/2024
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-P1
10/08/2024
Permit issued — Plumbing
M00945294-S1-PL
10/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
10/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
10/08/2024
Special inspection requirement — Final
Matthew Wavro
10/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Wavro
10/08/2024
Special inspection requirement — Lighting in dwelling units
Matthew Wavro
10/08/2024
Special inspection requirement — Lighting controls
Matthew Wavro
10/08/2024
Special inspection requirement — Interior lighting power
Matthew Wavro
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2024
Violation issued (HPD, closed)
A
01/19/2024
Violation issued (HPD, open)
A
01/19/2024
Violation issued (HPD, open)
A
01/19/2024
Violation issued (HPD, open)
B
01/10/2024
Violation issued (HPD, open)
B
11/10/2023
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-I1
11/10/2023
Filed — Alteration
converting one bedroom at apt 5f removal of nonbearing partitions, installing new nonbearing partitions, new lighting fixtures plumbing filed as a subsequent application. no change in use, egress or occupancy.
M00945294-S1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/2020
Violation issued (ECB, closed)
Construction
08/11/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2020
Permit issued — Sidewalk Shed
M00381545-I1-SH
08/06/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00381545-I1
08/05/2020
Violation issued (ECB, closed)
Construction
01/22/2020
Permit issued — Plumbing
M00230014-I1-PL
11/05/2019
Filed — Alteration
combining apartments - cap and remove plumbing fixtures, replace and relocate plumbing fixtures and install new plumbing fixtures.
M00230014-I1
10/25/2019
Violation issued (HPD, closed)
I
03/16/2016
Violation issued (HPD, open)
B
03/16/2016
Violation issued (HPD, open)
B
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (HPD, closed)
I
08/14/2014
Violation issued (ECB, closed)
Construction
06/02/2014
Violation issued (ECB, closed)
Construction
03/12/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offADVANCE TEAM CONSULTANT *02/07/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG10/08/2024
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION08/07/2020
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP01/22/2020
BISOTISSUEDTRICONE CONST & MNGMT INC12/28/2020
BISOTISSUEDAROUND THE CLOCK CNSN GRP12/04/2019
BISPLISSUEDI.M.P. PLBG. & HTG. CORP06/30/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/15/2017
BISOTISSUEDA.R.O. CONSTRUCTION CORP03/17/2016
BISPLISSUEDI.M.P. PLBG. & HTG. CORP03/14/2016
BISOTISSUEDA.R.O. CONSTRUCTION CORP10/16/2015
BISPLISSUEDDYCKMAN PLBG AND HTG INC08/18/2014
BISPLISSUEDELITE PLUMB HEAT.09/07/2006
BISEQISSUEDBILLY CONSTR.09/09/2005
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIP CORP08/11/2005
BISEQISSUEDCOLGATE SCAFFOLDIGN & EQPT CORP08/10/2005
BISPLISSUEDELITE PLUMB HEAT.12/19/2003
BISOTISSUEDCITY SIGN AWNING CORP¢12/18/2003
BISOTISSUEDLIBERTY WIRELESS INC11/21/2002
BISFPISSUEDIDEAL FIRE CONTROL INC.06/13/1990
1 project · most recent 12/13/2024
Water/Sanitary
FiledStatusContractorScope
12/13/2024Signed-offBELLEROSE PLBG & HTGWater/Sanitary
1 project · most recent 08/06/2020
FiledStatusContractorScope
08/06/2020Permit IssuedRICHARD NEU—
1 project · most recent 08/06/2020
Sidewalk Shed
FiledStatusContractorScope
08/06/2020Permit IssuedUNITED KING CONSTRUCTIONSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/04/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
12/02/2024Interior lighting powerMatthew Wavroenergy_progress
12/02/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
12/02/2024Tenant Protection Plan Compliance—special
12/02/2024Energy Code Compliance InspectionsMatthew Wavroprogress
12/02/2024FinalMatthew Wavroprogress
12/02/2024Fire-Resistance Rated ConstructionMatthew Wavroprogress
12/02/2024Lighting in dwelling unitsMatthew Wavroenergy_progress
12/02/2024Lighting controlsMatthew Wavroenergy_progress
10/08/2024Tenant Protection Plan Compliance—special
10/08/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/08/2024Tenant Protection Plan Compliance—special
10/08/2024Energy Code Compliance InspectionsMatthew Wavroprogress
10/08/2024FinalMatthew Wavroprogress
10/08/2024Fire-Resistance Rated ConstructionMatthew Wavroprogress
10/08/2024Lighting in dwelling unitsMatthew Wavroenergy_progress
10/08/2024Lighting controlsMatthew Wavroenergy_progress
10/08/2024Interior lighting powerMatthew Wavroenergy_progress
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
08/25/2026M00945294-P2Request digital key ↗
08/25/2026M00945294-P1Request digital key ↗
08/25/2026M00945294-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00381545-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00230014-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION17
01/16/2024122333741Open ↗
12/19/2023122333741Open ↗
12/13/2023122333741Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION7
12/28/2020140962698Open ↗
12/04/2019123494726Open ↗
03/21/2017122413147Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00945294-P2Open ↗
08/13/2026M00945294-S1Open ↗
08/13/2026M00945294-P3Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/21/2019123494726Open ↗
10/08/2019123494726Open ↗
03/29/2016122333741Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026M00945294-P4Open ↗
08/25/2026M00945294-P3Open ↗
08/25/2026M00945294-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/27/2026M00945294-P3Open ↗
09/27/2026M00945294-P3Open ↗
08/27/2026M00945294-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/25/2015122333741Open ↗
03/25/2015122333741Open ↗
08/22/2014122103794Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/25/2015122333741Open ↗
08/22/2014122103794Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026M00945294-P3Open ↗
08/27/2026M00945294-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/20/2020140962698Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/20/2020140962698Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
12/19/2023122333741Open ↗
12/04/2023122333741Open ↗
11/30/2023122333741Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/25/2015122333741Open ↗
09/02/2014122103794Open ↗
08/22/2014122103794Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
10/14/2014122103794Open ↗
10/14/2014122103794Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/14/2014122103794Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
11/04/2020140962698Open ↗
10/08/2019123494726Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00230014-I1Open ↗
08/13/2026M00381545-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026M00945294-P2Open ↗
08/25/2026M00945294-P1Open ↗
08/25/2026M00945294-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
10/20/2020140962698Open ↗
10/08/2019123494726Open ↗
03/25/2015122333741Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/21/2019123494726Open ↗
10/08/2019123494726Open ↗
07/09/2015122413147Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/20/2021140962698Open ↗
11/04/2020140962698Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/20/2020140962698Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/20/2021140962698Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/19/2023122333741Open ↗
12/19/2023122333741Open ↗
11/30/2023122333741Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/20/2021140962698Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/12/2020140962698Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
04/20/2021140962698Open ↗
11/12/2020140962698Open ↗
10/08/2019123494726Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
01/16/2024122333741Open ↗
11/30/2023122333741Open ↗
03/16/2017122413147Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
10/08/2019123494726Open ↗
07/09/2015122413147Open ↗
03/25/2015122333741Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/20/2020140962698Open ↗