← Back
BuildNYC
Predominantly retail with other uses
8024 13TH AVENUE
BROOKLYN · Dyker Heights · BIN 3163016
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R5BZoning
3,600 sfGross Floor Area
4Units
0 Active Violations 1 likely answered ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 8024 Realty · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 4 docs
Floor 1Cavatappi4p · 2 filings · 20 docs
Cellar8024 Realty LLC4p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cavatappi1503/22/2026
8024 Realty1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2025$1.5M—Private party → 8024 Realty$417/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Daniel Hom P.E409/04/2025
Bricolage Designs503/21/2022
GMH Architecture105/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bricolage Designs503/21/2026
JJ Well Construction603/21/2026
Henry Smith Property Management203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Superb Construction ManagementGeneral Contractor303/21/2026
Timing Construction Team*General Contractor303/21/2026
Control Plumbing & HeatingPlumbing207/08/2026
D'Onofrio General ContractorsGeneral Contractor107/08/2026
PipestylistsPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Daniel Hom7466305/30/2025
AA Building & Inspection1519503/21/2022
GM Huang Architecture PLL1398105/07/2021
Building Lifecycle
All (72)Filed (10)Permit Issued (6)Signed Off (6)Violation (14)Inspection (7)Objection (10)Special Inspection (19)
02/12/2026
Signed off — Alteration
B01233429-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2025
Signed off — Alteration
FILE PLUMBING WORK TYPE TO PERFORM GAS PIPING AND GAS PRESSURE TEST INSPECTIONS ON EXISTING PLP GAS SUPPLY LINE AT CELLAR. THIS JOB IS FILED TO SUPERSEDE LAA 34044384. ALL WORKS WERE DONE UNDER LAA 34044384.
B01233459-S1
09/30/2025
Signed off — Alteration
FILE PLUMBING WORK TYPE TO PERFORM GAS PIPING AND GAS PRESSURE TEST INSPECTIONS ON EXISTING PLP GAS SUPPLY LINE AT CELLAR. THIS JOB IS FILED TO SUPERSEDE LAA 34044384. ALL WORKS WERE DONE UNDER LAA 34044384.
B01233459-I1
09/29/2025
Violation issued (FDNY_NOV, closed)
09/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Filed — Alteration
FILE PLUMBING WORK TYPE TO PERFORM GAS PIPING AND GAS PRESSURE TEST INSPECTIONS ON EXISTING PLP GAS SUPPLY LINE AT CELLAR. THIS JOB IS FILED TO SUPERSEDE LAA 34044384. ALL WORKS WERE DONE UNDER LAA 34044384.
B01233459-P1
09/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL HOM
09/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/16/2025
Permit issued — Boiler Equipment
B01233459-S1-BE
06/12/2025
Permit issued — Plumbing
B01233459-I1-PL
06/09/2025
Permit issued — General Construction
B01233429-I1-GC
05/30/2025
Filed — Alteration
B01233429-I1
05/30/2025
Filed — Alteration
FILE PLUMBING WORK TYPE TO PERFORM GAS PIPING AND GAS PRESSURE TEST INSPECTIONS ON EXISTING PLP GAS SUPPLY LINE AT CELLAR. THIS JOB IS FILED TO SUPERSEDE LAA 34044384. ALL WORKS WERE DONE UNDER LAA 34044384.
B01233459-S1
05/30/2025
Filed — Alteration
FILE PLUMBING WORK TYPE TO PERFORM GAS PIPING AND GAS PRESSURE TEST INSPECTIONS ON EXISTING PLP GAS SUPPLY LINE AT CELLAR. THIS JOB IS FILED TO SUPERSEDE LAA 34044384. ALL WORKS WERE DONE UNDER LAA 34044384.
B01233459-I1
05/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
DANIEL HOM
05/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
DANIEL HOM
05/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
DANIEL HOM
05/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
DANIEL HOM
05/29/2025
Special inspection requirement — Heating Systems
DANIEL HOM
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2022
Signed off — Alteration
INSTALL PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION # B00600228
B00613837-I1
03/21/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION # B00600228
B00613837-P2
03/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/07/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE
B00600228-I1
03/04/2022
Permit issued — General Construction
B00600228-I1-GC
02/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
02/03/2022
Special inspection requirement — Final
NAVEEN KUMAR
02/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/03/2022
Special inspection requirement — Interior lighting power
Younes Abouyaala
01/28/2022
Objection resolved — Addressed
01/27/2022
Objection raised — Other
01/25/2022
Objection resolved — Addressed
01/21/2022
Objection raised — Scope
01/19/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION # B00600228
B00613837-P1
01/19/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE
B00600228-P1
01/17/2022
Special inspection requirement — Interior lighting power
01/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
01/17/2022
Special inspection requirement — Final
NAVEEN KUMAR
01/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/24/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/09/2021
Signed off — Alteration
B00508438-I1
11/05/2021
Permit issued — Plumbing
B00613837-I1-PL
10/20/2021
Objection raised — Other
10/20/2021
Objection resolved — Addressed
10/20/2021
Objection raised — Other
10/20/2021
Objection resolved — Addressed
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offControl Plumbing & Heating06/16/2025
DOB NOWPlumbingSigned-offControl Plumbing & Heating06/12/2025
DOB NOWGeneral ConstructionSigned-offTiming Construction Team*06/09/2025
DOB NOWGeneral ConstructionSigned-offSuperb Construction Management03/04/2022
DOB NOWPlumbingSigned-offT & T Plumbing11/05/2021
DOB NOWGeneral ConstructionSigned-offD'Onofrio General Contracting05/12/2021
2 projects · most recent 11/15/2021
General Wiring
FiledStatusContractorScope
11/15/2021Permit IssuedLimitless Electric ResourcesGeneral Wiring
11/15/2021CompleteLimitless Electric ResourcesGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/04/2025Tenant Protection Plan ComplianceDANIEL HOMspecial
09/03/2025Tenant Protection Plan Compliance—special
05/30/2025HVAC-R and service water piping design and insulationDANIEL HOMenergy_progress
05/30/2025HVAC-R and service water heating equipmentDANIEL HOMenergy_progress
05/30/2025HVAC-R and service water heating system controlsDANIEL HOMenergy_progress
05/29/2025Tenant Protection Plan ComplianceDANIEL HOMspecial
05/29/2025Heating SystemsDANIEL HOMspecial
03/21/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/21/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/03/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/03/2022Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
02/03/2022FinalNAVEEN KUMARprogress
02/03/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/03/2022Interior lighting powerYounes Abouyaalaenergy_progress
01/17/2022Interior lighting power—energy_progress
01/17/2022Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
01/17/2022FinalNAVEEN KUMARprogress
01/17/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/17/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CavatappiRestaurant / Food ServiceFloor 1
Project B00613837 Alteration · LOC Issued · 10/18/2021
Project B00600228 Alteration · LOC Issued · 10/07/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00508438-I1Request digital key ↗
09/01/2026B00613837-P2Request digital key ↗
09/01/2026B00613837-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00508438-I1Open ↗
09/01/2026B00600228-P1Open ↗
09/01/2026B00600228-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B01233459-S1Open ↗
09/01/2026B00600228-I1Open ↗
09/01/2026B00600228-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01233459-S1Open ↗
09/01/2026B00600228-I1Open ↗
08/28/2026B00613837-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00508438-I1Open ↗
09/01/2026B00613837-P2Open ↗
09/01/2026B00613837-I1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026B00600228-I1Open ↗
08/13/2026B00508438-I1Open ↗
08/13/2026B00613837-I1Open ↗