← Back
Professional building / stand-alone funeral home
803 STERLING PLACE
BROOKLYN · BIN 3031516
💬 Discuss this project
1910Year Built
1Stories
O7Building Class
R6AZoning
14,645 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 803 STERLING LLC · 10,645 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneralOther
Floor 115p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HANNAH REALTY2703/22/2026
HARRAH REALTY1203/21/2026
HANNAH REALTY ASSOCIATION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAS ENGINEERING, PC511/06/2023
GERTLER & WENTE ARCHITECTS209/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL ANTHONY CONTRACTINGGeneral Contractor403/21/2026
ADVANCED PLBG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678511/06/2023
Building Lifecycle
All (46)Filed (7)Permit Issued (3)Signed Off (3)Violation (1)Inspection (4)Special Inspection (28)
01/29/2024
Signed off — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-S1
01/18/2024
Signed off — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-I1
01/09/2024
Signed off — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-S2
11/06/2023
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-P4
11/06/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
11/06/2023
Special inspection requirement — Lighting controls
Ari Kamo
11/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
11/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
11/06/2023
Special inspection requirement — Maintenance information
Ari Kamo
11/06/2023
Special inspection requirement — Interior lighting power
Ari Kamo
11/06/2023
Special inspection requirement — Final
Ari Kamo
11/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
10/04/2023
Special inspection requirement — Maintenance information
Ari Kamo
10/04/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
10/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
10/04/2023
Special inspection requirement — Final
Ari Kamo
10/04/2023
Special inspection requirement — Interior lighting power
Ari Kamo
10/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
10/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
10/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
10/04/2023
Special inspection requirement — Lighting controls
Ari Kamo
03/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/05/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/02/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-P3
10/02/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-P2
09/30/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-P1
09/30/2022
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
09/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/30/2022
Special inspection requirement — Lighting controls
Ari Kamo
09/30/2022
Special inspection requirement — Interior lighting power
Ari Kamo
09/30/2022
Special inspection requirement — Final
Ari Kamo
09/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
09/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/08/2022
Special inspection requirement — Lighting controls
Ari Kamo
09/08/2022
Special inspection requirement — Interior lighting power
Ari Kamo
09/08/2022
Special inspection requirement — Final
Ari Kamo
08/25/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/16/2022
Permit issued — Mechanical Systems
B00694621-S2-MS
08/01/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-S2
07/25/2022
Permit issued — Plumbing
B00694621-S1-PL
06/23/2022
Permit issued — General Construction
B00694621-I1-GC
05/19/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-S1
05/16/2022
Filed — Alteration
Filing herewith for the removal of existing ductwork at kitchen area and modifications to the existing HVAC ductwork . 3Ton air cooled condensing unit to be installed.
B00694621-I1
09/19/2017
Violation issued (FDNY_ORDER, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMICHAEL ANTHONY CONTRACTING08/16/2022
DOB NOWPlumbingSigned-offADVANCED PLBG LLC07/25/2022
DOB NOWGeneral ConstructionSigned-offMICHAEL ANTHONY CONTRACTING06/23/2022
BISOTISSUEDG E K CONSTRUCTION CORP09/09/2010
BISSPISSUEDREEM PLBG & HTG CORP08/21/2006
BISOTISSUEDACTION AWNING&SIGN CORP05/18/2006
BIS—ISSUEDG FAZIO CONST01/12/2006
BISOTISSUEDG. FAZIO CONSTRUCTION CO01/04/2006
BISMHISSUEDG. FAZIO CONSTRUCTION CO01/04/2006
BISMHISSUEDG. FAZIO CONSTRUCTION CO01/04/2006
BISFPISSUEDCHIEF FIRE PREVENTION & MECHANIC12/15/2005
BISMHISSUEDG. FAZIO CONSTRUCTION CO09/23/2005
BISOTISSUEDG. FAZIO CONSTRUCTION CO09/23/2005
1 project · most recent 07/23/2022
General Wiring
FiledStatusContractorScope
07/23/2022CompleteCOMMERCIAL ELECT CONT INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/25/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
11/06/2023Mechanical SystemsAri Kamospecial
11/06/2023Lighting controlsAri Kamoenergy_progress
11/06/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
11/06/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
11/06/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
11/06/2023Maintenance informationAri Kamoenergy_progress
11/06/2023Interior lighting powerAri Kamoenergy_progress
11/06/2023FinalAri Kamoprogress
11/06/2023Energy Code Compliance InspectionsAri Kamoprogress
10/04/2023Maintenance informationAri Kamoenergy_progress
10/04/2023Mechanical SystemsAri Kamospecial
10/04/2023Energy Code Compliance InspectionsAri Kamoprogress
10/04/2023FinalAri Kamoprogress
10/04/2023Interior lighting powerAri Kamoenergy_progress
10/04/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
10/04/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
10/04/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
10/04/2023Lighting controlsAri Kamoenergy_progress
09/30/2022Energy Code Compliance InspectionsAri Kamoprogress
09/30/2022Fire-Resistant Penetrations and JointsAri Kamospecial
09/30/2022Lighting controlsAri Kamoenergy_progress
09/30/2022Interior lighting powerAri Kamoenergy_progress
09/30/2022FinalAri Kamoprogress
09/08/2022Energy Code Compliance InspectionsAri Kamoprogress
09/08/2022Fire-Resistant Penetrations and JointsAri Kamospecial
Latest 25 of 28.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00694621-S2Request digital key ↗
08/29/2026B00694621-S1Request digital key ↗
08/29/2026B00694621-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/13/2015340263486Open ↗
07/14/2010320187061Open ↗
▸BISWORK PERMIT APPLICATION1
09/09/2010320187061Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B00694621-P1Open ↗
08/29/2026B00694621-P1Open ↗
08/26/2026B00694621-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00694621-I1Open ↗
08/29/2026B00694621-S1Open ↗
08/29/2026B00694621-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B00694621-P1Open ↗
08/26/2026B00694621-P4Open ↗
08/23/2026B00694621-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/09/2010320187061Open ↗
09/09/2010320187061Open ↗
07/14/2010320187061Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/13/2015340263486Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/14/2010320187061Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/14/2010320187061Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/13/2015340263486Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00694621-S1Open ↗
08/29/2026B00694621-I1Open ↗
08/29/2026B00694621-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/13/2015340263486Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/14/2010320187061Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00694621-S2Open ↗
08/13/2026B00694621-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/13/2015340263486Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/13/2015340263486Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
07/14/2010320187061Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/13/2015340263486Open ↗
07/14/2010320187061Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/14/2010320187061Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/13/2015340263486Open ↗